Technical Office Electrical Engineer & LC/ICT Coordinator T&C
CSCEC (China State Construction Engineering Corporation Ltd.) /English.cscec.com/
Total years of experience :5 years, 1 Months
Responsible for the low voltage and low current technology management of the project, Shop drawing
preparation (Lighting, Power, Panel schedule, network systems, data centers teir2, fire alarm systems, audio
video, public address, IP telephones, Access control, and CCTV) and Materials, Coordination between my
major and other majors, Communicating relevant technical issues with suppliers of low voltage and low
current system, solving the technical problems encountered in site construction.
Managing and organizing LC/ICT systems from installation to testing and commissioning, including IBMS,
network systems, data canters, fire alarm systems, service systems, audio video, public address systems, and
IP telephones. Attending the briefing, managing, and progress meetings. Prepare the complete Outstanding
Work and TOC (Taking Over Certificate) report and follow-up site.
-Position:
1.Technical Office Engineer. (Oct.2020-Oct.2022).
2. LC/ICT Coordinator Engineer. (Oct.2022-Till Now).
-Client: Ministry of Housing and Utilities.
-Consultant: Dar Al-Handasa.
-Projects:
1. Central Business District - Office Tower C01. (180 million USDollar).
2. Central Business District - Office Tower C04. (165 million US Dollar).
Designing The low Voltage and low Current (Electrical normal and emergency, lighting systems, low level
and high level power systems, solar energy Lighting, Power, Panel schedule, network systems, fire alarm
systems, audio video, public address, IP telephones, Access control, and CCTV), Delivered Tenders drawing
and BOQ.
Using Egyptian Code, DEWA Code, Abu-Dhabi Code and KSA Code.
Mohamed Zein El-Abdeen Mohamed
-Position: Electrical Design Engineer.
-Projects:
1. Capriol Office Building. (The new administrative Capital, Egypt).
2. International School SH07. (The new administrative Capital, Egypt).
3. Alraha Beach-Aldana. (Abu-Dhabi, UAE).
4. Sterling East-West Tower. (Dubai, UAE).
5. Zummurud Tower. (Dubai, UAE).
6. Commercial strip. (Gada.(Saudi Arabia).
Designing of Distribution Panel Board, Motor Control Center, VFD and BMS Panel Board.
-Position:Electrical Design Engineer.
-Client: Ministry of Housing and Utilities.
-Consultant: Dar Al-Handasa.
-Projects:
1. Parliament. (The new administrative Capital, Egypt).
2. Utility. (The new administrative Capital, Egypt).
3. Japanese University. (The new administrative Capital, Egypt).
Graduation Projects Sponsorship at Schneider Electric. Design of an electric power distribution network for Resort. (Starting from distributor to Small Power) and Light current network (Infra). Last Year Grade: Very Good. Project Rated: Excellent.