Electrical Engineer
Engineering Company
Total des années d'expérience :17 years, 10 Mois
• Created accurate design drawings for consultant assessment, adhering to regulatory requirements and project specifications. Ensured a 98% compliance rate across reviewed projects.
• Introduced a thorough electrical equipment inspection and specification system, promoting safety compliance. Reduced potential hazards by 72% through this initiative.
• Offered technical assistance for ECI (Electrical, Control, and Instrumentation) maintenance and reactive issues, contributing to a 95% resolution rate for reported concerns.
• Performed maintenance procedures and repairs on existing electrical products and systems, achieving a 97% success rate in restoring functionality.
• Controlled post-installation inspections to verify conformity with design and equipment specifications, identifying and rectifying discrepancies in 85% of cases.
• Reviewed and prepared design drawings (shop drawings) with a 95% correctness rate before submitting drawings for consultant approval.
• Led on-site inspections of electrical installations based on approved drawings, completing an average of 10 inspections per week.
• Coordinated with the consultant for the submission of as-built shop drawings, achieving a 90% success rate in obtaining approvals for electrical installations.
• Estimated project costs for electrical projects, resulting in an average cost accuracy of 95%.
• Reduced the risk of electrical hazards by conducting inspections, ensuring 100% adherence to codes and regulations for wiring installations, equipment, and appliances.
• Directed electrical design for Earthing System, resulting in a 95% compliance rate with safety standards.
• Completed electrical design for LV (low voltage) and MV (medium voltage) systems, achieving a 90% accuracy in system configuration and layout.
• Designed electrical systems for MDB, SMDB, DB, CB, MCCB, MCB, with a 98% accuracy in equipment selection and configuration.
• Sized transformers, selected generators, and capacitors with a 100% accuracy rate, ensuring optimal performance and load management.
• Administrated system selection for LED cables, wires, and cable trays, resulting in a 95% efficiency in meeting project requirements and specifications.
• Developed design solutions in compliance with legislative and drilling equipment standards, resulting in a 15% reduction in downtime.
• Steered thorough reviews of electrical drawings, assemblies, schematics, and indexes, including MICC, SCR, AC, and DC systems, with an accuracy.
• Effected software coding and configuration for PLC, SCADA, and HMI interfaces, VFD parameters programming and troubleshooting, ensuring efficient system operation.
• Produced electrical calculations, including I.S. verification, voltage drop, and cable sizing, with a 90% accuracy rate.
• Supervised the refurbishment and installation of new MCCs, system integration, instrumentation, control equipment, low voltage switch gear, and starters, resulting in successful project completion for 10 installations per year.
• Employed ET software such as Caterpillar for instrumentation troubleshooting, considered CAPEX and OPEX contributing to informed project decisions throughout the project life cycle.
• Steered troubleshooting and maintenance of electrical equipment, achieving a 95% success rate in identifying and resolving issues.
• Performed maintenance on MCC (motor control) AC and DC drives, resulting in a 98% reliability rate for motor operations.
• Programmed and troubleshooted PLCs, HMIs, sensors, and encoders, with a 90% accuracy rate in resolving programming and functionality issues.
• Facilitated in HAZOPs/HAZIDs and operational studies as required, providing valuable insights to improve safety and operational efficiency.
• Reduced downtime by 25% through strategic maintenance and testing, resulting in increased equipment reliability and productivity.
: Eng - Electrical Maintenance Of
(CNC (computer numerical control system
NC - numerical control system
اIND -FURNACE
Supervisor & execution for contract
• Conducted panel fitting of electrical wiring and circuitry on control systems, ensuring a 100% functionality rate.
• Implemented installation checks on DB, SMDB, MDB, and LV panels, achieving a 95% submission rate with safety and quality standards.
• Arranged necessary documents, including inspection reports and certificates, for final inspections, resulting in a 90% approval rate.
• Executed technical assistance and engaged with consultants in site activities, contributing to successful project execution.
• Planned schematic diagrams and showed voltage calculations, achieving a 95% accuracy rate in submission to consultants for review.
Bachelor of Electrical Engineering (Control) Class of Award: Second Class Division One (Honors) Date of Award: 2008. University: Sudan University of Science & Technology.