Mohamed Aly Agha, Electrical Superintendent

Mohamed Aly Agha

Electrical Superintendent

Maire Tecnimont

Location
Egypt - Alexandria
Education
Bachelor's degree, BA of Electrical Engineering
Experience
27 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :27 years, 6 Months

Electrical Superintendent at Maire Tecnimont
  • Egypt - Aswan
  • My current job since November 2017

As Electrical superintendent for (New Ammonia & Urea Plant)
Responsible for Electrical activities related to the construction & pre-commissioning phase.

Electrical Section Engineer at Consolidated Contractors Company - Saudi Arabia
  • Saudi Arabia - Jizan
  • June 2015 to April 2017

As E & I Section Engineer for JRUP (Jizan Refinery Utilities Project.).
Responsible for Electrical activities related to the construction & pre-commissioning phase

Electrical Section Engineer at Consolidated Contractors Company - Saudi Arabia
  • Saudi Arabia - Jubail
  • December 2013 to May 2015

As E & I Section Engineer for Wasit Gas Project (Inlet Area, Flare Gas
Recovery Unit)
Responsible for Electrical activities related the construction & pre-commissioning phase.

E & I Section Engineer at Consolidated Contractors Company
  • Papua New Guinea
  • April 2012 to September 2013

As E & I Section Engineer for PNGLNG Plant Project Responsible for Electrical activities related to the construction, pre commissioning and commissioning phases at utility and offsite facilities, which includes.
7 Gas turbine generators.11.474 MW at 11 KV
3 Emergency diesel generators
Step up 33/11 KV Transforms
Step down 33/11KV, 33/6.6KV and 6.6KV/420V
Main Substation (Main Incomers)
7 Substations
Feeders to the process area substations

Water treatment plant
Cryogenic plant
Flare and lock out drum areas.

Senior Electrical & Instrumentation Engineer at ENPPI (Engineering for the Petroleum and Process Industries)
  • Egypt - Alexandria
  • November 2011 to April 2012

As Senior E & I Engineer for (Maximization of C2 & C3 (Ethan & Propane) From West Desert Gas Fields Project & New Feed For 300MMSCFD (300 Million Meter Specific Cubic Feed per Day) Process Area).
Responsible for Electrical & Instrumentation pre commissioning and commissioning activities of Refrigeration Plant (consists of 3 compressors to produce C2, C3) in addition Gas Turbine feeding the national gas grid with 300MMSCFD (300 Million Meter Specific Cubic Feet per Day).

Electrical Section Engineer at Consolidated Contractors Company
  • Yemen - Aden
  • August 2010 to March 2011

As Electrical Section Head for Aden Hotel Renovation Project.
Responsible for Electrical activities related the construction phase.

E & I Site Manager at Carlo Gavazzi Egypt
  • Egypt - Cairo
  • May 2009 to May 2010

As E & I Site Manager for El Tebbin Thermal Power Plant Project (2 x 350 MW Gas/Oil Fired Units.
Responsible for Electrical & Instrument activities related the construction phase.

Electrical Section Engineer at Consolidated Contractors Company - Saudi Arabia
  • Saudi Arabia - Jubail
  • August 2006 to February 2009

As E & I Section Engineer for KGP Project (Khurasania Gas Plant), (Technip Scope, ” Inlet facilities & NGL Recovery Plants).
Responsible for Electrical activities related the construction phase.

E & I Superintendent at Bentini
  • Libya - Zawiya
  • January 2005 to March 2006

As E & I Superintendent for Sulphur Solidification & Storage (Mellitah Plant), Responsible for Electrical & Instrumentation installation (Instrument installation - Cable trays - Cable pulling - Cable termination - Grounding - Cathodic protection - lighting - fire & gas system - All Loop Checks & Testes for LV, MV cables)

Senior Electrical Engineer at ABB Installation Products - Other locations
  • Egypt - Marsa Matruh
  • October 2002 to December 2004

ABB representative for installing and commissioning for Electrical and HVAC systems for oil and gas Field

Installed Equipments:

• MV, LV & control systems supplied by ABB
• MV, LV & control systems for 3 gas turbine supplied by "Solar Turbine".
• Lighting Systems supplied by ABB
• HVAC system supplied by ABB
The above systems installed with its all integrated activities
• E.g. Cable routing, pulling & connections
• Bus bar installation
• Earting systems

Electrical engineer at EDF (Electrisite' de France)
  • Egypt - Suez
  • February 2001 to October 2002

• Electrical engineer for the (2 x 341 M Watt Gas - Fuel fired power plant). This part of time expresses the field follow up, implementation with Quality assurance and Quality control for the Electrical Installation & Construction Work (LV & MV switchboard erection - Transformers installation - Cable Routing, Laying & Connection - Lighting, Earthing & Fire Alarm systems - MV bus duct with sf6 injection.

• Coordination between different vendors to install their equipments ( Packages) sequentially to achieve the integrity of the system.

• Pre commissioning and preparation work for the commissioning team
• As a witness for the commissioning work during the cold, hot and performance tests for the plant

Field Instrument engineer at Carlo Gavazzi Egypt
  • Egypt - Alexandria
  • March 2000 to February 2001

Supervising of Instrument activities and its related testes ( Instruments installation, tubing, tubing pressure tests and loop check.)

E & I Supervisor at Posco Engineering & Construction Co., LTD
  • Egypt - Menoufia
  • March 1997 to February 2000

Supervising and approving the construction, cold, hot and performance work for instrumentation, automation and electrical power systems related to the utility department which include
• Water Treatment plant designed by WTD company (Italy)
• Air Separation plant designed by LINDE AG company (Germany)
• Boiler plant designed by Kon Won company ( Korea)

chief technical officer at Egyptian Army Force
  • Egypt - Marsa Matruh
  • January 1995 to February 1997

Operation, Maintenance, Maintenance Planning and spare parts for electrical power units based on diesel generators.

Education

Bachelor's degree, BA of Electrical Engineering
  • at Faculty of Engineering
  • November 1994

Specialties & Skills

Project Work
Project Plans
Electrical Engineering
Electrical Testing
AutoCAD
Microsoft Word
Microsoft Excel
AutoCad

Languages

English
Expert

Memberships

Egyptian Concil of Engineers
  • Engineer
  • January 1995
Saudi Concil Of Engineers
  • Electrical Engineer
  • January 2014

Training and Certifications

Planninig using primavera (Training)
Training Institute:
Arab Academy for science and Technology
Date Attended:
June 2002
Duration:
120 hours