Total Years of Experience: 17 Years, 2 Months
January 2013
To Present
Head
at Egyptian Drilling Company (EDC)
Location :
Egypt
Planned Maintenance Leader in maintenance section
•Leading and coaching my team to ensure progress towards planned targets
•Identified maintenance work flow issues and set departmental goals and expectations.
•Evaluated procedures, gathers operator feedback, provided technical guidance, assisted with supply chain management, and makes technical recommendations to enhance the maintenance program
•Responsible for updating the lubrication charts and following up the oil samples.
•Working on keeping all the equipment in the first class condition by applying the maintenance plan in the best way.
•Presenting new projects/ ideas to the top management to enhance the maintenance performance.
•Applying predictive and preventive maintenance strategy to minimize down time and cost.
•Working on the upgrading projects, which include updating maintenance work
•Instructions, attending meetings with suppliers and implementing new equipment to the maintenance planning system.
•Established critical spare parts kits and reduced on hand inventory by 21%
•Leading and coaching my team to ensure progress towards planned targets
•Identified maintenance work flow issues and set departmental goals and expectations.
•Evaluated procedures, gathers operator feedback, provided technical guidance, assisted with supply chain management, and makes technical recommendations to enhance the maintenance program
•Responsible for updating the lubrication charts and following up the oil samples.
•Working on keeping all the equipment in the first class condition by applying the maintenance plan in the best way.
•Presenting new projects/ ideas to the top management to enhance the maintenance performance.
•Applying predictive and preventive maintenance strategy to minimize down time and cost.
•Working on the upgrading projects, which include updating maintenance work
•Instructions, attending meetings with suppliers and implementing new equipment to the maintenance planning system.
•Established critical spare parts kits and reduced on hand inventory by 21%
January 2007
To January 2013
Senior Mechanical
at Egyptian Drilling Company (EDC)
Location :
Egypt
drilling rigs
•Sustains and improves reliability, plant operation, maintenance, and systems documentation for a Drilling Offshore and onshore Rigs
•Implements a wide variety of engineering solutions to increase equipment availability, increase net operating rate, reduce operation losses, and achieve standard and acceptable production rates.
•Led the Maintenance department, with responsibility for all equipment and personnel.
•Implemented preventive, predictive, and corrective maintenance to perform scheduled outages.
•Ensured compliance with all international regulations, including emission and water pollution control, safety.
•Worked with different classification agencies.
•Sustains and improves reliability, plant operation, maintenance, and systems documentation for a Drilling Offshore and onshore Rigs
•Implements a wide variety of engineering solutions to increase equipment availability, increase net operating rate, reduce operation losses, and achieve standard and acceptable production rates.
•Led the Maintenance department, with responsibility for all equipment and personnel.
•Implemented preventive, predictive, and corrective maintenance to perform scheduled outages.
•Ensured compliance with all international regulations, including emission and water pollution control, safety.
•Worked with different classification agencies.
Maintenance special training: RCA (reliability centered maintenance), TPM (Total Productive maintenance using Oracle EAM R12
•Preventive: Development and implementation of scheduled maintenance programs and lubrication plans, overhauls, outages, inspections, draft tasks, instruction books, procedures, checklists, and emergency response programs
•Predictive: Development and implementation of data collection systems and programs, fault trees, root cause analysis, temperature and vibration spectrum analysis, lubrication analysis, thermal growth, alignment and bearing management, Infrared monitoring and analysis, report and procedure drafting, and trend analysis and spectrum generation to prevent breakdowns
•Preventive: Development and implementation of scheduled maintenance programs and lubrication plans, overhauls, outages, inspections, draft tasks, instruction books, procedures, checklists, and emergency response programs
•Predictive: Development and implementation of data collection systems and programs, fault trees, root cause analysis, temperature and vibration spectrum analysis, lubrication analysis, thermal growth, alignment and bearing management, Infrared monitoring and analysis, report and procedure drafting, and trend analysis and spectrum generation to prevent breakdowns
Share on Facebook
Share on Twitter
Share Via Email