Sr. Electrical engineer & MEP manager
Sinohydro Engineering
مجموع سنوات الخبرة :19 years, 6 أشهر
Doing tasks of MEP manager in the project of “Construction and
Maintenance for (597) Governmental
houses, General buildings, Infra networks &
Car barking in East Sabah Al-Ahmed project”
(Approved as Senior electrical engineer
from PAHW).
Doing tasks of the electrical project manager in the project of “Construction and
Maintenance for General building in Wafra, Block 4(Secondary school, Intermediate
school, Primary school, kinder garden, Fire Station, Local Mosques and Shops)”
(Approved from PAHW).
Sr. Electrical Project engineer (WARA
• Doing tasks of the electrical project manager in the project of “Air Defense
Improvement in Ali Al-Salim Air Base and Ahmed Al-Jaber Air Base.
Doing tasks of the electrical project manager in the project of: Services buildings (Fire
station, Post office and Telecom center)
(Approved from PAHW).
Doing all tasks of the electrical project Manager and helping for all MEP work in the
project of: Irrigation Water Tanks in new Sabah Al-Ahmed city:
- making the shop-drawing, executing the electrical work, taking care and making of
composite drawing, making the As built drawing, Approving the materials, preparing the
file for MEW for approval, Testing and commissioning for final inspection)
- supervising all HVAC work, fire fighting work and pumping units work in the pump
station
(Approved from PAHW)
Doing all tasks of the electrical project engineer in the following projects:
-The new Al-AHMADI police H.Q (Approved from MEW).
-The new Sulibikhat project
-Preparing for the projects (searching for the required products,
negotiating with manufacturer for the agency and for the prices)
-Finalizing the offers and preparing the needed documents (doing the technical and
financial offer)
-Installing, Commissioning, testing and maintenance for the devices
-Operation and maintenance engineer in Radio and TV Broadcasting stations.
- Maintenance engineer in the Studios and Master in the Ministry of
Information (MOI)
(Hot and cold steel rolling mill plant (construction and production)
I worked with the German experts in the project as: ❖ Supervisor engineer in the
installation stage (Trenching, cable tray& ladders, cable pulling, electrical and control
panels)
❖ Commissioning, testing & maintenance for the field equipments.
❖ Commissioning, testing & maintenance for the Master Drive systems.
❖ Commissioning, testing & maintenance for PLC (S7) Automation systems.
❖ Commissioning, testing & maintenance for Simadyn D Automation systems.
Maintenance for the textile & laundry machines including ( normal control,
drives and electronic cards
project: Computer networking