Electrical maintannace technician
New mowasat hospital
Total des années d'expérience :16 years, 3 Mois
Overall maintenance hospital which patient's rooms public areas, every week and months check
for load and unload test generators 6 no's and maintain for P.P.M. and checklist also fire door
P.P.M and etc..
➢ Overall hotel maintenance which includes guest rooms, public areas, kitchen, audio, video
set-up for meeting rooms, wedding ballrooms and other functions, swimming pool heaters all
equipment’s and appliances etc...
➢ A/C package and split machine power and unit indoor and outdoor control and
THERMOSTAT connection (electrical final wiring).
Plant electrical maintenance work
➢ Gathering 11KWA (11, 000 volts) step down transformer and converting it into step-down for
440 volts by passing it into the 1000 amps ACB (Air circuit breaker) and getting the output and
which is supplied to the university by using ON/OFF switch rating is up to 125 amps400amps.
➢ To increase the power factor by using capacitor bank (1 capacitor bank Rating is 20KVA) total
usage of is 5 capacitor bank 100KVA (5 X 20 KVA) To maintain the power factor value rating in
0.88pf to -0.99pf. ➢ Maintaining HT line Kilowatt meter and taking the monthly proper reading
for the same.
➢ By using Generator like Kirloskar green power ideas. Type BRUSHLESS SYNCHRONOUS
GENERATORS. Generator value: 500KVA. Output Voltage: 450volts, 696 amps, 50Hz, 3phase
generator for star connection. Taking proper reading of generator KWH (kilo watt hour meter)
and also off time of generator. Maintaining all electrical problems including AC problems in the
all campus.
New building electrical wiring work.
I complete NCVT ELECTRICIAN COURESH IN GOVT ITI TAMILNADU