أبو Abu Quasim, Sr. Project Engineer

أبو Abu Quasim

Sr. Project Engineer

SABIC

البلد
المملكة العربية السعودية - الجبيل
التعليم
ماجستير, MBA in Project Management
الخبرات
24 years, 8 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :24 years, 8 أشهر

Sr. Project Engineer في SABIC
  • المملكة العربية السعودية - الجبيل
  • أشغل هذه الوظيفة منذ يناير 2007

CO-ORDINATE & FACILITATE
-Acts as the focal point for all project activities including engineering, procurement, construction, commissioning (as applicable) and retains the final responsibility for the execution of the Project.
Confidently carried out several T/A project with proper planning of schedule, resources interaction of abroad vendor and contractor
Attended several FAT in kingdom and in Europe.
Represents the Company as a Client and resolves all issues related to the implementation of the Project activities.
In coordination of the Project team look in depth at the contract's elements, understand the Scope of Work and endorse the affiliate’s needs and objectives, assimilating what has been approved from board during commercial phase.
Put in place the project team and structure by defining and implementing, in cooperation with the pertinent key personnel, the Project Organization Chart, the Work Breakdown Structure (WBS) and the project Execution Plan (PEP).
Acts as the single point of contact with the affiliate, procurement, design, quality, global vendors, process licenser and O.E.M and ensures positive relations are maintained within the Contract obligations.
Ensures the preparation, implementation, and updating of the project Quality Plan and ensure that all project members are familiar with its contents.
Defines and organizes the utilization of the human resources, machinery, materials, Contractors, and anything else, plans the necessary procedures for the execution of the project.
Maintains close links with the partners of a consortium or other affiliate. Proposes the make-up of the Project Team and issue, in the project initial phase, the co-ordination procedure, even if only partial.
Ensures the development and the constant updating of the Project Execution Plan, monitoring the progress of the project phases, in accordance with the scheduled times and the cost and quality estimates and objectives.

INSTRUMENT & CONTROL ENGINEER في MARAFIQ POWER & WATER UTILITY CO.
  • المملكة العربية السعودية - الشرقية
  • أبريل 2002 إلى نوفمبر 2006

Worked as instrument and control engineer for “Power & Water Utility Company

• Responsible for control system e.g. DCS, SCADA, PLC and relay logic
• Engineering solution of chronicle problem and other activities for external services.
• Being a member of ISO team frequently inspection in calibration bench set-up, certification for master instrument calibration to avoid non conformance.
• Preparation of capital project, budget and cost estimation for next year and T/A.

INSTRUMENT & CONTROL ENGINEER في AYTB
  • المملكة العربية السعودية - الشرقية
  • أبريل 1999 إلى نوفمبر 2001

Worked as instrument and control engineer for construction of Petrochemya olefins and GAS Plant, SABIC

• Responsible for project execution as per design document provided by M/S. TECHNIP for 8 ethane cracking furnaces
• Execution of field activities as per design and submission of marked-up.
• Prepare bid evaluation report purchase recommendation approval by client for construction material.
• Preparation of quality document (inspection test plan, RFI, JSA etc) for approval and coordination for inspection by client.
• Punch point verification and handed over documents

الخلفية التعليمية

ماجستير, MBA in Project Management
  • في ALAGAPPA UNIVERSITY
  • مايو 2013

MBA in Project Management Final semester exam appeared from ALAGAPPA University, Chennai, INDIA and awaiting for result. University conducting worldwide exam

بكالوريوس,
  • في A.I.T CHIKMAGALUR, KARNATAKA, INDIA
  • نوفمبر 1996

Specialties & Skills

Instrument Control
Plan Execution
Bid Preparation
Project Control
Construction & Property
Project Management from concept to execution and handing over
Project Control by cost, schedule and quality

اللغات

الانجليزية
متمرّس

العضويات

PMI
  • Share study, knowledge, material i.e. magazine etc.
  • November 2010
IAPM
  • Declaration of ethics, rules of professional conduct and the continuing education requirements
  • July 2012

التدريب و الشهادات

Valid Certificate received (الشهادة)
تاريخ الدورة:
June 2013
صالحة لغاية:
June 2013
Certified International Project Manager (الشهادة)
تاريخ الدورة:
July 2012
صالحة لغاية:
July 2012
Satisfactory completion course received (الشهادة)
تاريخ الدورة:
July 2004
صالحة لغاية:
July 2005
Satisfactory completion course received (الشهادة)
تاريخ الدورة:
August 2004
صالحة لغاية:
August 2004
Satisfactory completion course received (الشهادة)
تاريخ الدورة:
April 2009
صالحة لغاية:
April 2009