Mohammad Adnan Nasir, Senior Piping Engineer

Mohammad Adnan Nasir

Senior Piping Engineer

Sui Southern Gas Company Limited

Location
Pakistan - Karachi
Education
High school or equivalent, Pre Engineering
Experience
12 years, 11 Months

Share My Profile

Block User


Work Experience

Total years of experience :12 years, 11 Months

Senior Piping Engineer at Sui Southern Gas Company Limited
  • Pakistan - Karachi
  • My current job since January 2023

• Review of Equipment Layout, Plot Plan, Piping layout, Sectional drawings, and Piping isometrics
• Review the BOQs
• Review the data sheets of valves and Special Items
• Review the Tie-In List and Line List
• Participate in the Design reviews
• Review and update the specifications
• Perform the Technical Evaluation for the PC Contractor
• Prepare the TOR for the contractor
• Assist and supervise the construction activities
• Manage and Supervise the rehabilitation works of HDPE Pipe
• Inspection of pipe, Fittings, Valves, etc
• Monitor and Control the Project's Progress
• Conduct a Factory Visit
• Well aware of the code and standards such as ISO 4437, API 1104, B31.8 etc
• Resolve the technical queries related to the site

Piping Engineer at Enar Petrotech Services
  • Pakistan - Karachi
  • January 2013 to December 2022

• Design of Equipment Layout, Plot Plan, Piping layout, Sectional drawings and Piping isometrics
• Checking of Equipment orientation drawings for all types of Oil and Gas equipment, considering equipment spacing, accessibility, operation, and maintenance requirement
• Develop the BOQ
• Extract the Piping materials take-off (MTO)
• Develop the data sheets of valves and Special Items
• Prepare the Tie-In List and Line List
• Perform Stress analysis of piping on CAESAR II and optimize the piping routes, stresses, and restraint forces
• Identification and categorization of critical and non-critical lines based on project specifications
• Good knowledge of piping material specifications and dimensional standards.
• Provide Piping input Process for Piping & Instrumentation Diagram (P&IDs), Line Designation Table (LDT), Piping Specialty (SP) Item List and Instrumentation Specification Sheet (ISS)
• Prepare the Mechanical Specifications
• Calculate the Pipe Wall thickness
• Develop the Alignment Sheets
• Develop the FEED Documents
• Well aware of the ASME, ASTM, NACE, API, and NFPA Codes and Standards
• Adapt standard procedure to perform the tasks
• Well aware of the 3D modeling
• Participate in the Design reviews
• Participate in HAZOP studies
• Part of Cost Estimation of the Piping, Steel structure and Equipment
• Preparation of Proposals and Man Hours for the Projects
• Involve in the preparation of the Tender Document and scope of work for the PC/EPC Contractor
• Perform the Technical evaluation
• Preparation of Document Control Register, Progress Report, and S Curve
• Co-ordinates with other departments for all project stages including concept design, preliminary design, and detail design
• Conduct a Site visit
• Part of pre-commissioning & commissioning of Amine Unit

Piping Engineer at EMCON Engineering
  • Pakistan - Karachi
  • January 2012 to December 2012

• Site visit for data collection and meeting with the Client project team at the site for finalization of basic parameters of projects.
• Preparation of Piping and Equipment Layouts
• Preparation of Piping Isometrics and Supports Drawings
• Preparation of BOQs, Material Requisitions, Specifications and Data Sheets
• Preparation of Tender and Contract Documents
• Preparation/Reviews of P & IDs
• Development of plot plans and key piping plans
• Development of detailed piping studies, which include piping layouts, nozzle orientation, and piping isometrics
• Checking of equipment layouts, fire water layout underground piping layout
• Bids Preparation
• Evaluation of Bids and Pre-Qualification of Contractors
• Coordination with Clients, Contractors, Manufacturers and Vendors
• Preparation of proposals.
• Preparation of Document Control Register and S Curve
• Preparation of feasibility reports & cost analysis

Trainee Engineer at LU Biscuit Limited
  • June 2011 to December 2011

Involved in maintenance of pumps, compressors, Commas Machines, Sig Machines, Madern Edward Machine, and other equipment.
•Also prepared work permits and material requisitions.
•Prepared shutdown schedule and jobs, preventive and predictive maintenance schedule.
•Installation of cooling conveyor with Team.
•Expert in operating different machines such as;
•Lathe Machine
•Grinding Machine
•Drill Machine
ACHIEVEMENTS
•Designing and supervising plant piping of UCH-II Development Project OGDCL.
•Erection of Equipment (Hot Oil Unit, pumps, and WHRU)
•Stress analysis of Flare Header & Fuel gas piping of UCH-II.
•Stress analysis & piping of HCL Engro Polymer & Chemical Limited.
•Piping of National Refinery CDU Revamp Project.
•Pre-commissioning and commissioning of Amine Unit.
•Data Steel Pipe Manufacturing Machine Verification.
•Installation of Cooling Conveyor in LU Continental Biscuit Limited.
PROJECTS
•UCH-II Development Project (300mmcfd), OGDCL.
•CDU Revamp Project, National Refinery Limited.
•Pipe Manufacturing Verification, Data Steel.
•MFM Mogas Project, PARCO.

Education

High school or equivalent, Pre Engineering
  • at Government Islamia Science College
  • July 2022

High school or equivalent, Science
  • at Saint Mary's High SchoolInstitute of Business Administration
  • July 2022

courses: PMP (Certification Preparation)

High school or equivalent, Project Management
  • at Muhammad Ali Jinnah University
  • January 2020

Bachelor's degree, Mechanical Engineering
  • at Quaid e Awam University of Engineering, Science & Technology
  • December 2010

Specialties & Skills

Detail Engineering
Stress Analysis
Microsoft Office
CAESAR II
PROGRESS
stress analysis
ENGINEERING
M S Office
MS Project

Languages

English
Expert

Training and Certifications

PMP 35 PDUs (Training)
Training Institute:
IBA Karachi
Date Attended:
July 2021