Technical support to the field people and technical advice to solve any critical problems.
Prepare and review Technical Evaluation (TEF) for the required equipment and spare parts.
Clarifications for the materials to be procured by the procurement department.
Technical inspection of the material received in the ware house.
Preparation of Scope of Work for External Services for Re-Habilitation/Repair works and co-ordination with vendors.
Preparation of SCUFF for new or obsolete material.
Preparation of Risk Assessment and approval from the Safety Department for the critical and high Risk jobs.
Review of Technical Bids.
Preparation of Opex Budget.
Follow up for the Budgeted jobs with Operation and Maintenance.
Preparation of Root Cause analysis for the equipment with repeated problems.
Responsible for Inspection and Testing Of (460V) Switchgear.
Troubleshoot of the control in the MCC panel.
Preparation of weekly and daily planning for the department.
Reserve the material according to the requirement in the job.
Responsible for Installation, Commissioning, Maintenance, Repair and trouble shooting of LV equipment’s such as MCC panel, SF6 switchgear and LV equipment’s such as switchgears power control centers and motor control centers.
Carryout preventive and breakdown maintenance.
Investigate system abnormalities, study the root cause of malfunction and provide recommendations to rectify the problem /abnormality.
Organizing all resources (equipment, tool, spare part and support) required for the execution and close out the jobs.
Preparing initial assessments of corrective jobs and accomplishment of the job in SAP.
Actively helped the manager in making recommendations for capital expenditure, departmental and external quality audits as required.
Preparing BOM defining functional location code, description, SAP material number.
Actively participated in weekly planning and scheduling meetings, weekly outstanding/Open issues meetings, monthly performance meetings and monthly KPI meetings.
Ensure compliance to all relevant safety, quality and environmental management procedures and controls within a defined area of Instrumentation Engineering activity to guarantee employee safety, legislative compliance, delivery of high quality products/service and a responsible environmental attitude.
Monthly Site Walk down, Tools inspection, PPE inspection, PTW audit, SUSA discussions done as per Marafiq requirements and entered observations as notifications in SAP and prepared initial assessments.
Installation of Outdoor Substation Installation (33/11) KV & Transformer.
Installation of Overhead Transmission Line (33KV 11KV and LT) and DTC installation.
Responsible for Inspection and Testing Of MV (13.8KV) & LV (380V) Switchgear.
Responsible for Installation, Commissioning, Maintenance, Repair and trouble shooting of MV equipments such as transformers, SF6 switchgear and LV equipments such as switchgears power control centers and motor control centers.
Maintenance of LV motors, AC drives and external internal lightings.
Responsible for preparing testing Schedule.
Carryout preventive and breakdown maintenance.
Carryout Maintenance and Maintain Maintenance Records.
Supervision of manpower.
Responsible for providing proper training to technician.
Responsible for timely completion of the job.
Installation of Outdoor Substation Installation (33/11) KV & Transformer.
Installation of Overhead Transmission Line (33KV 11KV and LT) and DTC installation.