Operations Manager
Five Bites and Azzurri Café
Total des années d'expérience :9 years, 8 Mois
Successfully completed works for preparing two locations to launch on target dates.
◦ Managed contractors and coordinated with carpenters, electricians, and equipment vendors to ensure timely completion of required work
◦ Engaged with stakeholders to design and select menu items, benchmarking, sourcing materials, testing, and costing
◦ Identified and enabled the creation of SOPs and quality check-lists to maintain defined standards for quality and safety
◦ Established inventory management system and performed variance analysis to ensure proper monitoring of inventory consumption and utilization
Experienced Continuous Excellence Manager and Production Engineer with a track record of leading cross-functional teams, implementing problem-solving techniques, and optimizing resources to achieve significant reductions in losses and increase
efficiency. Skilled in stakeholder management, project leadership, and training development. Led successful projects to implement modules and improve loss-reduction practices in alignment with strategic priorities
Managed the operation of four 5-Gallon production lines and created detailed production plans for daily runs based on yearly forecast, resulting in optimization of manpower and materials requirements.
• Achieved a 35% reduction in losses since 2016.
• Increased line efficiency from 70% to 84%.
• Successfully reduced the momentary out of stock occurrence from 4 in 2014 to 1 in 2015.
Responsible for conducting Audits and Investigations regarding inventory levels, daily store operations, thefts and security.
Ensuring staff have adequate training in handling day to day cash point of sales policies and procedures.
monitoring adherence to standards and policies for inventory handling.
I was an intern as Quality control technician.
Responsibilities included collecting samples for different products and from different steps of the process.
conducted tensile strength tests and other material properties related quality checks.
Data entry using SAP.
Graduation project: Improving efficiency at Tahboub Wood Working Company: • Conducted demand analysis to determine optimal stock levels. • Facility design and optimization using motion and time study and Simulation Program. • Showed a potential 11% increase in output and a 16% reduction in inventory cost