Process Production Project Engineer
Ducab
مجموع سنوات الخبرة :11 years, 6 أشهر
• Established project schedules and ensured that milestones were met during each phase.
• Made recommendations that would ensure project objectives were met.
• Developed documentation, including diagrams and specifications, to meet project requirements and regulatory standards.
• Coached newly hired employees and interns while observing progress and delegating tasks.
• Maintained exemplary conduct at all times, whether onsite or at client's facility.
• Met weekly with plant and general manager to discuss project implementations and alleviate any issues.
• Prepared technical documentation for operation, troubleshooting and maintenance of industrial systems for PLC and Human Machine Interface.
• Troubleshot electrical equipment problems such as electro-valves and sensors.
• Managed engineering changes using SAP systems.
• Applied principles of electrical theory to advance and improve product development and efficiency.
• Coordinated with vendors to identify and procure appropriate equipment necessary for project completion.
• Demonstrated role of neural networks in self-healing power distribution grids through thesis research.
• Initiated project management knowledge study and subsequently standardized project management practices.
• Wrote protocols, qualification documents, test plans and test reports for quality assurance purposes.
• Collaborated successfully with cross-functional development teams to design and manufacture new products.
• Evaluated installed electrical equipment and systems to isolate faults and implement corrective actions.
• Worked with inspectors, workers, and unions, to conduct weekly status updates.
• Prepared project proposals, including cost estimates, schedules and project specifications.
• Performed construction observation and took soil samples.
• Conducted material tests and analysis using meager equipment and tools.
• Checked design calculations of other team members for accuracy.
• Entered data into spreadsheets and prepared PowerPoint slides for weekly meetings.
• Fulfilled over 50% of deadline initiatives saving $1, 000, 000
• Operated large commercial projects under budget with effective management of people and materials.
• Estimated quantities and cost of materials, equipment and labor to determine project feasibility.
• Increased safety rating of high-level project by 50% by identifying and resolving severe structural issues.
• Defined engineering problems, collected data, established facts and drew conclusions to solve electrical engineering issues.
• Edited project reports, specifications, plans, construction schedules, environmental impact studies, permits and designs.
• Assessed site conditions and collected measurements to make accurate project design determinations for 10 projects.
• Secured over $2, 000, 000 in funding for infrastructure projects by designing dynamic and innovative presentations.
• Reviewed calculations and analytical data to maintain accuracy of technical reports.
• Devised overall strategy for documentation and identified design sets planned for each stage of work including as-built designs and final building information models (BIM).
• Determined project feasibility by estimating materials costs and sourcing requirements.
• Educated general public about civil works through professional presentations and community discussions of environmental impact statements.
• Visited project sites during construction to monitor progress and consult with contractors and on-site engineers.
• Determined schedule and budget requirements for data center project to coordinate efficient work.
• Reviewed and assisted in performing technical bid analysis.
• Determined availability, strength and viability of Construction materials for over 5 33/11 KV substation projects.
• Planned and coordinated work requiring modification of standard engineering techniques, procedures and criteria.
• Controlled site engineering activities to maintain work standards, adhere to timelines and meet quality assurance targets.
• Actively worked to prevent defects and delays issues by closely monitoring job sites for construction impacts and effectively collaborating with Resident Engineer.
Engineering Management consists of 11 courses. 6 of engineering courses and 5 of business courses. the engineering courses are Quality , Process , Operations , new Product Development , Project Management and Capstone The business courses are accounting , supply chain , management and leadership , management of technology and Decision Technique using SPSS
99% in high school scholarship to university , full tution fees CCNA ( CISCO ) passed FE exam ( American License for Engineering ) , its before PE exam TOEFL , iBT 78 GRE exam 151 quantitative
لقد تم حذف الرابط بسبب انتهاكه لسياسة الموقع. يرجى التواصل مع قسم الدعم لمزيد من المعلومات.