PROJECTS :
• SAGAR SAMRAT CONVERSION PROJECT ONGC, IMCC, ABU DHABI, UAE.
• AISHWARYA PROJECT (DCU DYIP), IOCL HALDIA, WB. (FURNACE).
• SHUTDOWN - Phase II and III, ONGC-MRPL.
• HAZOP STUDY FOR PIPELINES & CITY GAS DISTRIBUTION (CGD) NETWORKS,
IOCL.
RESPONSIBILITIES:
• P&ID review. Process Simulation using Aspen HYSYS.
• Simulation for Gas Dehydration Unit (GDU) using Aspen HYSYS.
• HAZOP studies on cross country pipelines of P&IDs of IOCL.
• Sketching of PFDs along with Preparation of Technical Datasheets.
• Performing in-depth Datasheet for Equipments, Lines, Instruments and Valves.
• Line walk, System conformity.
• Preparing missing items list and get procurement by client.
• Getting MCC done and certified by TPI.
• Obtaining missing documents and complete the dossier.
• Perform pre-commissioning activities.
• Performing Pre-commissioning activities like System conformity test, LP leak test, HP leak test,
Nitrogen Purging.
• Activity risk assessment for pre-commissioning & commissioning activity.
• Attend the PTW meeting with HSE on the day before start of the activity to revalidate the TRA
in case of high risk activity.
• Shall attach the TRA for HRA along with the submission of the permit / certificate
Assessment of risk arising from the hazards and consideration of its tolerability, facility and
environment.
• Damaged limits identification and quantification of the risk and contour mapping on the layout.
• Determination of maximum over pressure and heat radiation effect, which could act on the
critical areas of the location.
• Damaged limits identification and quantification of the risk and contour mapping on the layout.
• Evaluation of risk against the acceptable risk limit.
• Estimation of overall Risk/ Risk quantification.
• Risk Reduction measures to prevent incidents, to control accidents.
• General and Specific Recommendations for reduction of risk.
• Formulation of plan during emergency.
• Carrying out shutdown activities, which include following.
• Responsible for carrying out the necessary shutdown activities in refinery units, including
vessel/column/equipment inspections, catalyst unloading, loading coordination, supervision etc.,
as assigned by EIC.
• Open-as it is inspection of process heat exchangers and cooling water exchangers from both
shell and tube side, before cleaning and after cleaning.
• Inspection of process columns/strippers internally from process perspective.
• Inspection of process heaters internally including inspection of burners, process coils, air pre
heaters, checking heater burner alignment based on check list & reporting necessary
observations.
• Updating status of shutdown jobs on continuous basis in the prescribed plant during the schedule
given.
• Collection of deposits, residues etc., and submit to QC laboratory.
• Observation of healthiness based on guidelines provided by engineer in charge & putting up
observations notes based on inspection.
• Completed the Line cleaning activities of piping system of Flare, Fuel gas, Instrument Air, LP
Steam, MP steam, etc.
• Performed the leak test of the above systems.
• Steam blowing of MP steam and LP steam.
• Inspected the vessels and columns as per client requirement.
• Performed the lube oil flushing of compressor system.
• Executed the Machine Run Test (MRT) of pumps.
• Checking rotating equipment alignments.
• Executed the Machine Run Test (MRT) of Air Fin Coolers.