• Prepare & Update Request for inspection (RFI) for All work activities as per Project
standards & specifications.
• Prepare and update the Request for Inspection for all various civil work activities
like Underground existing utilities (Trial pits), surveying & setting out, Trial mix
concrete, Cube test sample (7 days & 28 days for compressive strength test).
• Prepare and Update the Request for Inspection (RFI) for cable trench Excavation,
sand bedding, Pipe laying, backfilling & Compaction as per AFC Drawings.
◦ Prepare & Update the Method statement, Inspection Test Plan for all ongoing work
activities at site as per project Requirements.
• Prepare and update the RFI for Excavation of Pole foundations, form work,
pole installation, pole alignment & final setting out.
• Prepare the RFI for Concrete Duct Banks for Excavation, Shuttering, Concreting &
Bitupaint primer application, Backfilling and submit Inspection request Document to
the client for Approval & Update Log sheet.
• Prepare and Update the RFI for HDD Works (Horizontal Directional Drilling) for
survey, setting out, Exit & entry pit excavation, pilot hole drilling, reaming
pipe jointing & pipe pulling and submit RFI document to the client for Approval.
• Prepare & Update the RFI for RMU (Ring Main Unit) Beam & Slab, Shuttering,
reinforcement, Anchor bolts fixing & concreting and submit to the client for Approval &
Update RFI logs.
• Prepare request for inspection for Survey setting out, Excavation, Blinding, Formwork,
rebar works & Concrete of cable joint bay and submit to the client.
• Prepare & Update Inspection request logs for all work activities.
• Co-ordination with QAQC management team for preparing inspection and generation of
check lists for various construction activities.
• Prepare RFI (Request for Inspection) for daily work Activities and Attach with
Checklists, Survey record sheets, Site photographs & Approved shop drawings on
submission time.
• Prepare & update Material Inspection Request log.
• Witnessed for concrete cube tests with Third party laboratory for compressive strength
test reports.
• Prepare & Update the Prequalification documents & Material Submittal Documents with
the attachments of vendor documents.
• Prepare & Update the Third-Party Test Report Logs & Maintain the Records.
• Prepare and update the Method statement, Inspection test plan for all work activities as
project standards & specifications.
• Maintained and updated QA/QC logs, reports, and Documentation as per ISO Standards.
• Prepare and Update the Key Performance Indicator for all design deliverable documents.
• Prepare & Update the QA/QC Weekly Progress Report for weekly basis on submission
time.
• Prepare & update the QA/QC Monthly Quality management system report on monthly
basis.
• Closure of Non-conformance Reports raised by the client after rectifying the works
at site.
• Complying with QCS-2014 including Qatar Energy Standards where applicable
• Prepare & Update the Third-party logs & Maintain Records for Laboratory test reports.
Such activities like Concrete logs,
• Report Non-Conformances for the ongoing activities on site.
• Support the Project Manager and QA/QC Team in implementing and monitoring the
Project Quality.
• Support the QA/QC Team in Documentation & inspection.
• Co-ordinate with clients and internal teams during inspections and quality walkthroughs.