Projects Executed
• EMAL Smelter Complex
Client EMAL, Consultant SLI
Project includes Alumina offshore Conveyor installation, lights, and trays cabling inside the convers, instrument for conveyer and dust collector, PLC, FOC and Distribution substations ( 3 Nos) for the conveyor and EMAL port facility.
Involved with EMAL, SLI, different supplier and subcontractors regarding quality, executin progress and contractual issues. Receiving Authority for electrical and POV trained.
• Al Raha beach substations
Client AL Dar, Consultant AECOM, PB (Parson Brinkerhof)
.
• Al Reef Villa (Contract No P 07-829)
Client Hydra Properties, Consultant AECOM
• KPIZ project AD 219 (Contract No 1001-257)
Client ADCP, Consultant Bechtel
• AL Muneera AL Raha Beach (Contract No 2212)
Client Aldar, Consultant WME
.
• Yas Tunnel S/S And Control Building (YAS STC)
Client Aldar, Consultant Halcrow
• Habshan 5 Gas process plant
Client GASCO
Project includes earthing grid for gas plant.
• AlBandar in Al Raha Beach
Client Aldar, Consultant AECOM
.
• Tabreed District Cooling Plant (45000RT)
Client Tabreed Consultant SNC Lavalin Gulf
• 132kv transmission lineFrom Hota banni Tammimi to Aramco
Niam Oil field in Kingdom of Saudi Arabia
Duties & Responsibilities
• Supervised specific site works in accordance with the project terms and obligations.
• Reviewed design drawing, study interference problems and reviewing related vendor drawings and installation instructions.
• Supervise the performance of sub-contractors to ensure the respect of work's standards, specification, schedule and budget.
• To coordinate with site inspectors to resolve site execution problems & testing.
• Monitor & reviewed sub-contractor site personnel progress.
• Assuring that the environment, health & safety procedures & rules are respected.
• Inspection of all works and equipment to ensure they are acceptable prior to calling the QC for final inspection.
• To plan with the project manager/ Resident Engineer the daily site needs and deliveries.
• Involved pre-commissioning test of 33, 3, 3kv, 22kv, 11kv and 415 volts LV Switchgear from upstream to downstream switchgears.
• Involved loop checking of actuators and instrument sensors.
• Assists PLC ladder programming configuration.
• Reviewed single line diagram of high and low voltage switchgears.
• Prepare Schematic diagram from upstream to downstream switchgear controls.
• Walkthrough around the pipe racks of all electrical unfinished items as per standards.
• Performs inspections on high & low voltage terminations, splicing, cable pulling operations, and substations.
• Performs inspections on above and below ground electrical installations.
• Performs inspection and/or tests of transformer and switchgear.
• Performs inspection on electrical motors, generators, transformers, switches and other miscellaneous items.
• Witnessed for testing of HV, LV switchgears such as Vacuum circuit breaker and air circuit breaker and relay settings.
• Witnessed for testing of automatic transfer switch for generators.
• Assuring that the environment, health & safety procedures & rules are respected
• Assists in coordination of vendor materials deliveries.
• Interprets design engineering drawings and prepares construction working drawings for the site manager as required, including: field sketches of revisions and additions and preparing as built drawings.
• Reviewed electrical/instrument as built drawings.
• Involved in the pre start procedure before starting the work on site, coordination with different personals, surveyor, and personals from different authorities for safe work beside other utilities.
• Conduct inspection of B.M.S. such as HVAC, fire alarm, CCTV, lcp lightings, lightning protection access card reader and earthing system as per BS standard.
- Company industry:
- Construction & Building
- Job role:
-
Electrical Engineering