محمد خليل, Site Manager

محمد خليل

Site Manager

Algihaz Holding

البلد
المملكة العربية السعودية - جدة
التعليم
بكالوريوس, B.Tech In Electrical Engineering
الخبرات
11 years, 4 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :11 years, 4 أشهر

Site Manager في Algihaz Holding
  • المملكة العربية السعودية - جدة
  • أبريل 2017 إلى سبتمبر 2017

 Provide Technically excellence and innovative solutions, for adding value for substations
 Site setup, Execution of works as per L2 Schedule & Electrical Drawings/Standards.
 Managing end to end co-ordination between various Engineering Department from planning to monitor on-site activities and final execution of the project without any delay in the project schedule.
 Certification of measurements and invoices raised by contractors as per mode of payment defined in contract.

 Effective implementation of all the Health, Safety & Environment standards as per the Algihaz Holding and Suaudi Electricity Company guidelines at site.
 Informing the site status, site issues and other project related issues to customer and different internal departments for early completion of project.

Managerial Cadre في ABB India Limited
  • الهند - فريد اباد
  • يوليو 2008 إلى مارس 2017

Responsibilities & Experience:
 Provide Technically excellence and innovative solutions, for adding value for substations
 Site setup, Execution of works as per L2 Schedule & Electrical Drawings/Standards.
 Managing end to end co-ordination between various Engineering Department from planning to monitor on-site activities and final execution of the project without any delay in the project schedule.
 Certification of measurements and invoices raised by contractors as per mode of payment defined in contract.

 Effective implementation of all the Health, Safety & Environment standards as per the ABB and customer guidelines at site.
 Informing the site status, site issues and other project related issues to customer and different internal departments for early completion of project.
 Preparation of field quality Plan.
 Preparation of Work Method Statement and Risk Assessment each and every activity.
 Preparation of Daily, Weekly and monthly progress reports for daily monitoring of the project for the information of top management.
 Erection of 765/400KV, 400/220KV Substations. (Towers, Equipment Structure, Stringing, Equipments, Aluminum Tube erection)
 Installation of 333MVA, 315MVA, Transformers, 110MVAR, 63MVAR, 50MVAR, 80MVAR Reactors, CT, CVT, ISOLATOR, LA, 630KVA & 800 KVA Auxiliary Transformers, Control & relay panels, PLCC Panels, LT Switchgear, Battery and Battery charger.
 Transformer and Reactors Oil filtration and filling in tank.
 Cable laying and Termination of Control and Power Cables.
 Installation of substation Earthing system.
 Erection, Testing and commissioning of outdoor and indoor illumination system.
 Erection, Testing and commissioning of Fire protection system, AC & Ventilation system.
 Co-Ordination with testing and Commissioning Team.

Works Engineer/Electrical في Ircon International Limkited
  • الهند - دلهي
  • فبراير 2008 إلى يوليو 2008

 Installation of overhead equipment like cantilever assembly contact wire, catinary wire.
 Installation of BG-2 type foundation for railway mast.
 Installation of mast like Portal, BFB for OHE.
 Co ordination with design team with respect to actual condition at site.
 Railway station Lighting.

Electrical Site Engineer في ASM construction
  • الهند - دلهي
  • يونيو 2006 إلى فبراير 2008

 Understand the Scope of Work ( PO & BOQ).
 Assisting the Project Manager in Planning of Complete Phase of the Project.
 Helping in resolving Different Day to Day problems arising at site during execution of project.
 Preparation of Monthly Progress Reports for daily monitoring of the project for the information of top management.
 Co-ordination & organizing Project Review Meeting.
 Erection of Dry Type Transformers & (Transformer 33KV/440V) of indoor Sub-stations.
 Erection of 33kv, 11kv HT panel and 415v LT panel.
 Erection in Position, Installation of Rising Mains, Bus Ducts, Cable Tray and Raceway.
 Arrangement of Earthing.
 Conduiting and Internal Wiring complete with Light FittingsAnd Other Accessories.
 Laying of HT & LT Cables & Terminations of Cables.
 Co ordination with design team with respect to actual condition at site.

الخلفية التعليمية

بكالوريوس, B.Tech In Electrical Engineering
  • في Maharan Pratap Engineering College
  • يونيو 2006

Specialties & Skills

Planning, Execution of Works, Monitoring & Controlling for EHV/HV/LV Electrical Substation.

اللغات

الانجليزية
متوسط