محمد محمود حسن,   Senior Supervision Architect.

محمد محمود حسن

 Senior Supervision Architect.

EHAF Consulting Engineers

البلد
مصر
التعليم
بكالوريوس, Architecture
الخبرات
16 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :16 years, 9 أشهر

 Senior Supervision Architect. في EHAF Consulting Engineers
  • مصر - القاهرة
  • أشغل هذه الوظيفة منذ يناير 2016

Scope of work:
EHAF Consultants
Emaar Egypt
Al Shafar General Contracting (ASGC)
Responsibility of 20 buildings of Mivida project. Finish work: Internal work including (Block- work and Plastering, Ceramic & granite for floor finishing -Polyurethane, Exterior work including Plastering and painting.
Responsibility:
 Reviewing method statement and material submittals.
 Approve the work done by the contractor to get the final approval from the Owner
Consultant by applying my technical skills as a site engineer, designer and to provide a
fast response to the up to date work conditions.
 Inspect and monitor construction sites to ensure adherence to safety standards, building
codes, and specifications.
 Inspect and monitor the finishing work of buildings (painting, steel doors (firerated) and
wooden doors.
 Inspect buildings, wiring, plumbing and sewers, during and after construction for
structural quality, general safety and conformance to specifications and codes.
 Measure dimensions and verify level, alignment, and elevation of structures and fixtures
to ensure compliance to building plans and codes.
 Issue NCR’s and site instructions for works are not compliance with project
specifications.
 Maintain daily logs and supplement inspection records with photographs.

Project Manager/Design Manager في Private workers
  • مصر - القاهرة
  • نوفمبر 2015 إلى أغسطس 2016

Architect. Mohamad Mahmoud 05-10-17 Scope of work:
Walls & ceiling steel repairing. Establishing of electricity & plumbing works. Carpentry works & decoration for doors, windows & flooring. Decoration of walls & ceiling (painting & wallpapers). Ceramic works for kitchen, bathroom & laundry room.
Responsibility:
 Preparation & review of drawing for finishing & decoration works.
 Design of internal lighting, walls & flooring.
 Inspect finishing work, Using survey instruments, metering devices, tape measures, and
test equipment, to perform inspections.
 Inspect and monitor construction sites to ensure adherence to safety standards, building
codes, and specifications.
 Inspect and monitor the finishing works (painting, wooden doors, wall and ceiling).

. Supervisor Inspector Architect . في (R .M .C) Raafat.Miller.Consultants.
  • مصر - القاهرة
  • نوفمبر 2014 إلى أكتوبر 2015

The Mall of Egypt is around 400.000 m2 (2 levels) at 6th October city Built-up Area including 412 shops, a Carrefour hypermarket, 17-screen cinema complex, restaurants in addition to the only Ski Slope in Africa, amusement park and an indoor ski resort similar to Majid Al Futtaim (MAF) Properties’ Ski Dubai in the Mall of the Emirates.The shopping mall also the mall also provide a direct bridge access off the al wahat highway to 6500 parking space of multi storey car park, and its own 66/22 KV Substation, the contract has been awarded to a 50/50 joint venture between Orascom Construction (OC) and the BESIX Group.

Consultant : Raafat Miller Consultants
Client : Majid Al Futtaim (MAF)
Construct : Between Orascom Construction (OC) and the BESIX Group .
Duration : 48 Month
Cost : 4.9 Billion LE .

. Senior Site Engineer / Technical Office في Abdullah A. M. Al-Khodari Sons Company.
  • المملكة العربية السعودية - القطيف
  • يناير 2014 إلى نوفمبر 2014

(Obstetric -Gynecologic & Pediatric 300 Bed Hospital Al-Qatif.)Ksa.
The project it’s Basement + Ground + 5 Floor with Total Area (800000m2) Main Building Including Medical Records, Rehabilitation Therapy Department, Imaging Suit, Emergency Department, Respiratory Care Unit, One day Surgical Suite, Gynecology Clinics, Common Clinics, Obstetrics Clinics, Specialized Pediatric Clinics, Pediatric Clinics, Newborn Critical & Continuing Care Unit, Pre-Natal & Post-Partum High Risk Pregnancy Nursing Unit, Obstetrics & Gynecology Critical Care Area, Pediatric Critical Medical Care Unit, Gynecology Nursing Unit, Pediatric Surgical Nursing Unit, Obstetrics Nursing Unit, Newborn Nursery Unit + Technical Building Include: Service Room, Transformer, Generator, Chiller, Electrical Pump, Boilers Sceco Room. + Support Service Building + Mosque + 6 (6 Story) Staff Building + 3 Guard House + RO Plant Tank + LPG Tank .

Consultant : Dar Al Majad Consultant
Client : Ministry of Health
Construct : Abdullah A. M. Al-Khodari Sons
Cost : 425.000.00 S.R.

The project has been split into two separate phases, with the first being valued at $65.4m and the second at $43.1m.

Scope of work :
Construction work start from Grid leveling, execavation ion to footing & Prepration Shop Drawing

Site Engineer في Wady El Nile Construction & Real-estate Investments Co.
  • مصر - القاهرة
  • فبراير 2011 إلى نوفمبر 2013

( National Cancer Institute ), Cairo- Egypt

This project was a large hospital capacity 500 beds and eight sections in all disciplines oncologist, namely: Cancer Surgery - Oncology - and radiation therapy for tumors also for anesthesia and pain for kids suffering from cancer and needed to be repaired as soon as possible while the patients are still inside floor Consists of 3 Buildings the Middle, north and south : Basement + Ground + 12 Floor + Roof floor + Upper roof .

Consultant : A Committee overseeing the engineering representative of the owner (Cairo University Misr Consult .
Client : Cairo University .
Construct : Wady El Nile Construction & Real-estate Investments Company.
Duration : 24 Month
Cost : 40 Million LE .

Site Engineer في Wady El Nile Construction & Real-estate Investments Co.
  • مصر - القاهرة
  • يناير 2010 إلى فبراير 2011

( National Defense Council's Projects ) Sector - The 5th Settlement Cairo, Egypt.

The project (400-acre) private compound For Egyption intelligence at a cost of 4.3 billion pounds contain 848 villa and palaces, landscaping, roads .
Consultant : Omr EL- Ghonemy
Client : Egyption intelligence.
Construct : Wady El Nile Construction & Real-estate Investments Company.
Duration : 48 Month
Cost : 4.3 Billion LE .

. Site Engineer / Architect Designer . في GEO GROUP (Dr. Ibrahim Gouda)
  • مصر - القاهرة
  • أغسطس 2007 إلى ديسمبر 2009

1 - Courts Complex (Kafr el-Sheikh) : Interior design and full details of the project.
2 - Court of (Burullus) : Interior design and full details of the project.
Consultant : Geo Group .
Client : Ministry of Justice
Construct : Engineering Authority of the Armed Forces
3 - Pharmacy Cairo: Interior and exterior
4 - Fifth Avenue: design and oversee the implementation of the private villas set
5- Gruppi Cairo: Raising surveyors and redesign.

• Implemented several internal and external designs and oversee the implementation of the projects office (Dr. / Ibrahim Gouda- Geo) Chairman of the Department of Architecture Military Technical College as an Architect designer for Groppi Cafeteria redesign , Courts ( interior - Exterior ), private villa, residential building .
• Supervise the Implementation of the Youth Center Administration Building Makram Ebeid (Concretes / Finishes).
• Implementation & Review plans, blueprints, site layouts, specifications, and construction methods to ensure compliance to legal requirements and safety regulations.
• Execution finishing work, Using survey instruments, metering devices, tape measures, and test equipment, to perform inspections.
Construction sites to ensure adherence to safety standards, building codes, and specifications .

Site Engineer في Engineering Authority of the Armed Forces
  • مصر - القاهرة
  • مايو 2008 إلى أكتوبر 2009

Youth Center Administration Building, Cairo -Egypt


The project it’s Graound + 2 Floor with Total Area (5000 m2) Main Building with Penta football stadium .
Consultant : Engineering Authority of the Armed Forces .
Client : Ministry of Youth and Sports .
Construct : Cheapish Contracting Co.
Scope of work :
Construction and finishing work from excavation up to final handing over .

الخلفية التعليمية

بكالوريوس, Architecture
  • في of Ramadan Institute
  • أغسطس 2007

The main idea of my graduation project is: improve the Psychology of thinking and perception for children. Project’s degree: Excellent (A)

Specialties & Skills

Adobe Photoshop
3D Studio Max
AutoCAD
Architecture
3D STUDIO MAX
ADOBE PHOTOSHOP
AUTOCAD
ENGINEERING
INTERIOR DESIGN
MICROSOFT OFFICE
MICROSOFT WORKS
SUPERVISORY SKILLS

اللغات

العربية
متمرّس
الانجليزية
متمرّس
الأوردو
مبتدئ

العضويات

Egyptian Engineering Syndicate .
  • Egyptian Engineering Syndicate .
  • July 2007

الهوايات

  • c
    Self Motivated , Self Control Self study .  Ability to work independently and as an effective team member  Considered by relocate and accept responsibility  Hard worker and ready to work under stress  Have the ability to learn any new individually in team work