Mohammad  Malick, Construction Manager

Mohammad Malick

Construction Manager

Medgulf Construction Company W.L.L Doha Qata

Lieu
Inde
Éducation
Baccalauréat, Instrumentation
Expérience
27 years, 1 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :27 years, 1 Mois

Construction Manager à Medgulf Construction Company W.L.L Doha Qata
  • Qatar - Doha
  • Je travaille ici depuis septembre 2013

• Reviewing ITB and proving technical inputs to biding team for unit pricing of multi-discipline (Civil, Structural, Mechanical, Piping, Electrical, Instrumentation and Telecom) works.
• Attending pre bid meeting and site survey for biding.
• Developing project budget, scheduling and sequencing the day to day activities by estimating of manpower, equipment, consumable materials and site facilities on project phase basis and ensuring that development and construction activities move according to contract schedule and construction costs to keep project on budget.
• Planning and preparing site facilities like; camping facilities, fencing of camp, laydown and site offices, porta-cabins, calibration shops, site stores, securities rooms, transportation all construction site requirements.
• Preparing mobilization and demobilization plan.
• Keeping track of Equipment (cranes, excavators, trucks, trailers, forklifts, dumpers, earthmovers, rollers, compactors) and resources being used efficiently.
• Ensuring the job site remains safe, clean, and orderly by establishing daily tool box talk and weekly safety talks.
• Controlling and issuing of all work permits as performing authority and ensuring that anyone associated with any project activities within client areas adheres to all PTW system at all times.
• Resolving on-site issues like; locals and workers nuisance, transportation, accommodation and flooding issues.
• Ensure that suitable means of reporting progress are established for the construction phase and the report accurately reflects the actual status.
• Scheduling and sequencing the day to day activities of work
• Overseeing day to day construction activities of civil, structural, piping, mechanical, electrical, instrumentation and telecom.
• Overseen and prepared contractual submittals

Sr. Project Engineer (PMC) Saudi Aramco Projects à Jacobs Engineering and Consultant KSA
  • Arabie Saoudite - Dammam
  • février 2008 à juillet 2013

• Ensuring that detailed plans are developed to a facility and or area basis which integrate, co-ordinate and sequence work activities to achieve the optimum construction sequence, paying particular attention to contractor interfaces.
• Looking ahead to identify risks and developing mitigating options in sufficient time to prevent a negative impact on the construction site performance.
• Scheduling and sequencing the day to day activities with general contractor (NSH).
• Reviewed design criteria reports, drawing control listings, sequence of design deliverables, compliance of design deliverables with Dow Chemicals and SA standards and specifications.
• Attending technical meetings with ECP contractor and client.
• Pro-actively anticipating and solving problems that could delay construction.
• Physically inspected projects to monitor progress and compliance with project standards.
• Assisting in resolving construction problems (lack of productivity, work interfaces, etc.)
• Maintained liaison with other departments (i.e., Material Control, Purchasing, Quality Control, Engineering) to ensure all required materials, equipment, inspections, etc., support craft activities and project schedule.
• Supervising day to day site activities like; cable installation, tray installation, conduit installation, JB and local panel installation, HV, MV LV switchgear MCC panel & IRP UPS, lighting & distribution Board, HV, LV and Control Cables and cable pulling, Grounding Systems, Cathodic Protection Systems cable testing and terminations.
• Overseeing of 132KV/33KV/13.8KV GIS substation’s installation of Electrical Equipment’s of Substation DDC panels, AHU Panels, Lightning Systems & Panels, AC-DB Panels, SDB Panels, Transformers, Switch gears, Exhaust fans, Smoke Purge Fans, Supply Fans, Blower Motors, Differential Pressure Sensor, Transformers 6.6KV and 10kv switchgear & soft starter panels LV panels lighting Panels IRP, UPS control Panels and Desks, installation of aviation light, DB, JB & MOV panels Heat tracing and cathodic protection and HV, MV &LV Switchboard & motors fin fan, cable laying, termination and Hi-pot test, .
• Lying of 115 KV high voltage cable from GIS substation to power Transformer
• Reviewing vender’s package documents and drawings and coordination with engineering team for site QT rose by contractors during construction at site.

Construction Engineer/Site In charge à Medgulf Construction Company W.L.L Doha Qata
  • Qatar - Doha
  • septembre 2004 à décembre 2007

• Preparing construction project budget estimate.
• Planning and preparation of construction schedules and milestones.
• Developing a plan which clearly identifies site need dates for critical equipment and materials and implementing monitoring processes to give early warning of any threat or risk to meeting the need dates and developing mitigating actions in time to avoid any impacts to site activities.
• Reviewing contract and preparing records for changes and additional works during project execution.
• Overseeing and leading a team of engineers and supervisors in carrying out construction works.
• Managing resources and equipment to achieve contract completion within budget and time.
• Participating in regular meetings to identify problems, target dates, issues, delays execution of work to ensure timely project completion;
• Conducting internal staff meetings, ensure the progress of project in accordance to schedule, allotted man hours and budgeted costs.
• Directing and monitoring Material Take off (MTO) activities, identify irregularities and shortfalls, take corrective action as required.
• Approval of sub-contractors and vendors invoices.
• Carried out all construction activities viz; cable tray installation, cable laying, instrument installation, calibration, panel installation, transformer installation control and cubical panel installation, motor LV, MV and HV cable laying and connections, control wiring, loop check, testing, pre comm. and commissioning etc.
• Reviewing commissioning sequence and plan, detailed commissioning procedures for DCS loop checking, DCS, ESD and PLC logic check.
• Preparing all testing dossiers/loop check packages along with proper document to safely execute the work.
• Leading technical teams to undertake commissioning activities and interfacing with other disciplines to ensure integration of activities and monitoring progress to commissioning schedule.
• Ensuring availability of personnel, equipment and consumable materials to complete planned workloads.
• Ensuring that all commissioning activities are carried out with all appropriate consideration to the safety of the labor involved, those associated with the field, PIBs and CCR activities.

Superintendent -E&I à Doosan Heavy Industries & Construction Ltd. - Kuwait.
  • Koweït - Al Koweït
  • janvier 1997 à juillet 2004

• Planning and supervised subcontractor’s activities - includes determining method of construction, manpower levels, material quantities equipment, temporary power sources, work schedule and documenting actual hours worked.
• Scheduling and sequencing the day to day activities of work.
• Pro-actively anticipating and solving problems that could delay construction.
• Keeping the Construction Manager apprised of unique situations and problems encountered.
• Physically inspecting projects to monitor progress and compliance with project standards.
• Assisting in resolving construction problems (lack of productivity, work interfaces, etc.)
• Maintaining liaison with other departments (i.e., Material Control, Purchasing, Quality Control, Engineering) to ensure all required materials, equipment, inspections, etc., support craft activities and project schedule.
• Reviewing design criteria reports, drawing control listings, sequence of design deliverables, compliance of design deliverables with standards and specifications.
• Overseeing site activities like; cable installation, tray installation, conduit installation, JB and local panel installation, cable testing and terminations.
• Attending technical meetings with subcontractors and clients.
• Overseeing and preparing "request for quotation" packages with procurement department.
• Ensuring that the equipment and tools used by his section is maintained, including the calibration of inspection, measuring and testing equipment.
• Coordinating with vendors & client associated with third-party agency to arrange the PIM meeting and finalizing the inspection level and IFAT, FAT etc.
• Overseeing of 132KV/33KV/13.8KV GIS Substation in which complete installation & commissioning of Electrical Equipment’s of Substation DDC panels, AHU Panels, Lightning Systems & Panels, AC-DB Panels, SDB Panels, Transformers, Switch gears, Exhaust fans, Smoke Purge Fans, Supply Fans, Blower Motors, Differential Pressure Sensor, Transformers 6.6KV and 10kv switchgear & soft starter panels LV panels lighting Panels IRP UPS control Panels and Desks installation of aviation Light & installation of Battery with Electrolyte.
• Installation of lighting DB, JB & MOV panels Heat tracing And cathodic protection and HV, MV &LV Switchboard & motors fin fan Cable Termination and Hi-pot test, cable laying.
• Lying of 115 KV high voltage cable from GIS substation to power Transformer
• PCS system SAT and functional check of all integrated systems like; (ESD, PMS, IAMS, CCS, ALMS, DAHS, PCMS, CPM, CRMS, FAS)
• Coordinating with operation department while plant start-up.
• Accumulating As-built drawings, O&M manuals, 3rd party test certificates, construction quality test certificates and handing-over to O&M department. etc.

Éducation

Baccalauréat, Instrumentation
  • à Magadha University
  • juillet 1989

courses: Computer Hardware Engg. & Program (Micro-Ed Ltd. Calcutta)-

Baccalauréat, Science
  • à Magadha University
  • janvier 1983

Specialties & Skills

Consultancy
Commissioning
Pre Commissioning
Engineering
Construction & Property
Construction Managment
Engineering & design
Project Managment
Pre commissioning
Commissionig
Bid Review
MATERIALS MANAGEMENT

Langues

Arabe
Débutant
Anglais
Expert
Hindi
Expert

Formation et Diplômes

HSE Tools & Skills (Formation)
Institut de formation:
PDO
Permit to Work System (Formation)
Institut de formation:
QP, Saudi Aramco , QG ,RG
H2S Awareness and Escape (Formation)
Institut de formation:
Aramco
Safety Leadership for Managers (Formation)
Institut de formation:
PDO Approved 3rd party

Loisirs

  • Ready
    Reading