مجموع سنوات الخبرة: 8 سنوات, 2 أشهر
أبريل 2020
إلى سبتمبر 2020
Quality Control Engineer
في AGC
البلد :
المملكة العربية السعودية - الدمام
QC Electrical Engineer at HYBA AL SHAMAL CONTRACTING EST.
CR Number : 5950104640
Duration : (April 2020 to September 2020)
Client : SAUDI ARAMCO
Contractor : AGC Company.
CR Number : 5950104640
Duration : (April 2020 to September 2020)
Client : SAUDI ARAMCO
Contractor : AGC Company.
أبريل 2019
إلى مايو 2020
Quality Inspector
في Sraco
البلد :
المملكة العربية السعودية - الخرج
QC Inspector at Haradh & Hawiyah Gas Compression
Project -GHAZAL, GCP-1
Duration : (April 2019 to April 2020)
Client : SAUDI ARAMCO
Contractor : SRACO Company.
Project -GHAZAL, GCP-1
Duration : (April 2019 to April 2020)
Client : SAUDI ARAMCO
Contractor : SRACO Company.
يناير 2018
إلى أبريل 2019
Quality Control Engineer
في Azmeel Contracting Company
البلد :
المملكة العربية السعودية - ظهران الجنوب
Project : QA/QC Engineer at South Dhahran
Home Ownership
Project (SDHOP)
Duration : (January 2018 to April 2019)
Client : SAUDI ARAMCO
Contractor : Azmeel Contracting Company.
Home Ownership
Project (SDHOP)
Duration : (January 2018 to April 2019)
Client : SAUDI ARAMCO
Contractor : Azmeel Contracting Company.
أكتوبر 2017
إلى يناير 2018
Quality Control Engineer
في Azmeel Contracting Company
البلد :
المملكة العربية السعودية - الجبيل
Project-4 : QA/QC Electrical Engineer at Aramco Increment -2 Mutarafia
Duration : (November 2017 to February 2018)
Client : ROYAL COMMISSION SAUDI ARABIA
Contractor : Azmeel Contracting Company.
Duration : (November 2017 to February 2018)
Client : ROYAL COMMISSION SAUDI ARABIA
Contractor : Azmeel Contracting Company.
يوليو 2012
إلى أغسطس 2017
Electrical Site Engineer
في Hindustan Steelworks Construction Limited- HSCL
البلد :
الهند
Company: Hindustan Steelworks Construction Limited
(HSCL) -India
Designation: Electrical Site Engineer
Tenure: July 2012 to till now.
Project: ESIC-HOSPITAL PROJECT-GULBARGA
Website: http://www.hscl.co.in
JOB PROFILE:
➢ Supervising testing and Commissioning of Power Distribution Transformer D.G. Sets, LT Bus ducts, M.V. Switchgear Medium Voltage Distribution Panels including PLC based Panels PCC Panel, MCC Panel, HT and LT Cabling, Internal and External Lighting, Earthling etc.
➢ Responsibility in operation & maintains of electrical infra structure like 4x1250KVA with AMF & PLC technique.
➢ Inventory of material & ensure timely supply of materials required for the project, Procurement action, mobilizing site activities.
➢ Getting customs clearances for sez materials & Maintaining sez materials documents/ Registers.
➢ Estimation of Bill of Quantities.
➢ Procurement of material availability to execute the project
Contd 3..::3:: ➢ Proper utilization of manpower & resources in optimum manner with in required time lines.
➢ Preparation of shop drawing and obtaining approval from Consultants /Architects/Client.
➢ Preparation of quality checklist, as built drawing, test report handing over documents.
➢ Provisions of solutions to arising problems and difficulties
➢ Attending meetings with P.M.C's, Consultants, and Architects & Clients.
➢ Quantity measurement & certification of bills etc.
➢ Verifying & labeling the circuits as per design after completion of the project.
➢ Responsibility in operation & maintains of electrical infra structure.
➢ Smoke detector & fire detector fire Alarm panel, BMS wiring
➢ Verifying & labeling the circuits as per design after completion of the project.
(HSCL) -India
Designation: Electrical Site Engineer
Tenure: July 2012 to till now.
Project: ESIC-HOSPITAL PROJECT-GULBARGA
Website: http://www.hscl.co.in
JOB PROFILE:
➢ Supervising testing and Commissioning of Power Distribution Transformer D.G. Sets, LT Bus ducts, M.V. Switchgear Medium Voltage Distribution Panels including PLC based Panels PCC Panel, MCC Panel, HT and LT Cabling, Internal and External Lighting, Earthling etc.
➢ Responsibility in operation & maintains of electrical infra structure like 4x1250KVA with AMF & PLC technique.
➢ Inventory of material & ensure timely supply of materials required for the project, Procurement action, mobilizing site activities.
➢ Getting customs clearances for sez materials & Maintaining sez materials documents/ Registers.
➢ Estimation of Bill of Quantities.
➢ Procurement of material availability to execute the project
Contd 3..::3:: ➢ Proper utilization of manpower & resources in optimum manner with in required time lines.
➢ Preparation of shop drawing and obtaining approval from Consultants /Architects/Client.
➢ Preparation of quality checklist, as built drawing, test report handing over documents.
➢ Provisions of solutions to arising problems and difficulties
➢ Attending meetings with P.M.C's, Consultants, and Architects & Clients.
➢ Quantity measurement & certification of bills etc.
➢ Verifying & labeling the circuits as per design after completion of the project.
➢ Responsibility in operation & maintains of electrical infra structure.
➢ Smoke detector & fire detector fire Alarm panel, BMS wiring
➢ Verifying & labeling the circuits as per design after completion of the project.