Site Engineer – Facility Management (Operation and Maintenance)
Arabian Rafters Company
مجموع سنوات الخبرة :12 years, 2 أشهر
• Planning building maintenance, operational programs and PPM
• Managing all vendor contracts
• Ensuring efficiency of all building systems
• Coordinating site safety programs
• Preparing operating reports and budgets
• Maintaining a safe work environment for all employees
• Ensuring all processes and compliance programs are met
• Managing facilities planning and space allocation
• Preparing cost estimates for moves and equipment
• Coordinating with department heads and building contractors
• Managing maintenance of grounds
• Ensuring all utility systems are inspected and in accordance with regulations
• Coordinating building security and maintenance services
• Coordinating all maintenance issues and schedules
• Responsible for implementations and monitoring of all electrical related works at site (Infrastructure and buildings electrical works)
• Estimates, prepares and assigns the resources such as manpower, materials, consumables, equipment, tools, etc., required for all electrical and related works prior to execution.
• Manages directly and provide engineering and technical supports to all the electrical work groups at site.
• Plans the execution of all electrical related works and coordinates the works to mechanical and civil groups.
• Coordinates with Client / Consultant’s representatives for any site instructions and inspection of works.
• Ensures that all the works done are in accordance with the approved construction drawings, contract documents, project specifications, and all applicable standards whether local, national or international standards.
• Directly responsible for the safety of all electrical groups’ personnel of the project by ensuring that the project execution
• Diagnosing breakdown problems
• Monitoring and controlling maintenance costs
• Organizing routine servicing schedules
• Organizing and applying preventive maintenance schedules
• Preparing PRs and RFQ for electrical components to be purchased from local market or to be imported after study the technical specification
• Design and implemented several LV panels
• Dealing with emergency and unplanned problems and repairs
• Organizing routine servicing schedules
• Prepare PRs for electrical components to be purchased from local market or to be imported after study the technical specification
• Writing maintenance strategies to help with installation and commissioning
guidelines.
• Dealing with emergency and unplanned problems and repairs;
• Making scheduled checks on machinery and parts;
• Analyze the root causes of breakdowns happen on the machines related to labels printing and packaging such as “Focus” printing machines and ultrasonic cutting machines then identify the suitable corrective action and applied it.