Sit Geologist
engicon
Total years of experience :17 years, 8 Months
• Date: 8 Oct. 2011- Up to date :
Position: Sit Geologist with Engicon
Kind of Work: KUFRANJA DAM PROJECT.
• Date: 7 June 2010 - 7 Oct. 2011:
Position: Sit Geologist with AL-JAFAR CONTRACTING CO.
Kind of Work: SHAIDHAM DAM PROJECT.
• Date: 16 June2008 - 16 June2010: * Position: Well Sit Geologist With HAJJAN DRILLING EST. \{IN KSA\}.
DRILLING FOR WATER WELL.
• Date: 10 June2006 - up 29 Feb. 2008:
* Position: Geotechnical for Drilling & Grouting with HARZA Engineering Co. International L.P
*Employer: Consultant Consolidated Engineering & Environment
* Kind of Work: Al- Wehdah Dam Project.
* Job Description: Supervised and documented various activities associated with the foundation grouting program for the 96-meter high Al Wehdah Dam (highest dam in Jordan, cost: 100 million U.S. dollars) . Responsibilities included: Supervision of Installation of Anchor bars, Rock bolts.
• Perform the WPT, Core Logging.
• Site Supervision of the construction the grout curtain in inclined holes to depth of 110m, injection grout operation were performed with GIN method or refusal at 20 bars injection pressure.
• Responsible for shift of 10 people working in adits, sloping galleries and in the open, equipment and material required for construction in order to meet a production target with more than 70.000m drilled.
• Check on the foundation and abutment on the dam body before RCC replacement.
• Logging and description the cores of rock and RCC.
• Measured water levels in standpipe piezometers.
B.Sc: in Earth and Environmental Science (Geology), AL_Yarmouk University (Jordan) Graduated in 2005, over all average: 77.1 (very good)