Telecommunication Engineer
Nahjtech
مجموع سنوات الخبرة :10 years, 6 أشهر
• Installation of Ciena 6500 DWDM rack and ODF rack and mounted ciena14 and 32 slot shelf and populates module as per the RFV.
• Commissioning & Provisioning of Ciena 6500 14 and 32 slot shelf as per the DND.
• Commissioning & provisioning of Ciena 5410 & 5430 .
• Software Upgrade of 6500 series device.
• Installation & Configuration of Ciena Switch CN 3942.
• Arrange the material delivery on site for site installation from Nahj warehouse.
• Performed power up activity with customer.
• Prepared FRL as per the SFD and performed fibering.
• Performed pre-ATP
• Prepared line up activity with customer.
• Preparing site installation document and reporting daily basis to PM.
- Installation of ciena 6200, 5160
- Configuration of CIENA devices & commissioning.
- Fiber installation, routing of fiber & patching
- Resolving network issue
AS A COMPUTER NETWORK ENGINEER