Construction Manager
Binladin Contracting Group
Total years of experience :16 years, 1 Months
Construction Manager for roads and infrastructure field.
-sound contract administration certificate-FIDIC
• Responsibilities
Preparing shop drawings, ordering materials, execution, and supervision the road works and car parking in dubai safari project including:
(Cutting and filling, subgrade, subbase, wet mix road base, asphalt base coarse, wearing coarse, road marking, curbstone fixing, traffic diversions, relocation existing services, guard rail fixing, installation of permenant concrete barrier, fixing of traffic signage, removing existing asphalt, fixing of interlocking tiles for foot path in many places).
Execute and supervise steel reinforcement and concreting works for 7 nos. of water bodies.
Execute and supervise stamp concrete roads reinforced by 8 and 10 mm steel mesh
with different colours and patterns.
Preparing shop drawing and supervision on site the construction of service future ducts.
Preparing shop drawing supervision and construction of 4 nos.helipad area and supervision fixing of TLOF, FATO, Flood light and obstacle light at the same place.
Preparing shop drawing and executing sewerage network and pumping station, storm water networks and soak aways including steel reinforcement, concrete casting and GRP lamination with connection to the nearest exisiting network as per dubai municibality standard .
Prepaing shop drawing and construction of 2 nos. (HDPE) storm water ponds to collect the running water from external roads and parking with capacity of 20000 cubic meter.
Construction of Etisalat, Elv, Water, Sewerage and storm water manholes.
construction of the proposed internal roads about 5 Km and services to various residential/commercial plots in Sector Z 36/01 in Mohammed Bin Zayed City including Storm water drainage, street lighting, Sewerage. Telephone, electric power, future service ducts and other relevant civil works
• Responsibilities
ExecutionRoadworks pavement layers, embankment, subgrade, subbase, asphalt base coarse and wearing coarse.
Managing and carried out civil works for construction of electrical substations and request materials, tools and equipment needed from project manager.
Preparing bar bending schedule and ordering the steel reinforcement (uncoated black steel) for 9 nos. of electrical substation 11/0.4 kv distribution rooms.
Execute and supervise the steel reinforcement and concrete casting class C20/20 &C40/20 for blinding and foundation of electrical substation rooms.
Supervise the installation of precast superstructure(wall panels and floor slabs) for the Substation.
Waterproofing system application for substructure of electrical substation and Roof slab .
Approved section engineer by ADSSC following redesign and implementation of Sewerage network construction and connection to existing line, preparing shop drawing and excution on site (6 km pipeline starting from 160 mm dia UPVC pipe up to 400mm dia GRP pipeline, 70 nos manholes and 124 house connection)and supervising of sheet pile installation.
construction of the proposed internal roads about 4.5 Km and services to various residential/commercial plots in Sector Z 36B in Mohammed Bin Zayed City including Storm water drainage, street lighting, Sewerage. Telephone, electric power, future service ducts and other relevant civil works
• Responsibilities
Preparing of shop, manholes schedule drawing, ordering the materials and excution on site sewerage network construction.
(5 km pipeline starting from 160 mm dia UPVC pipe up to 350 mm dia GRP pipeline, 64 nos manholes and 116 nos of house connection ) and using dewatering system to sure that all lines and manholes are dry and handing over the work to ADSSC and other parties.
Execute and supervise the street lighting and storm wáter network (pipeline and concrete) as per drawings, specifications.
Identify and secure all existing services of public service.
Preparing of shop drawing for future ducts, ordering the material and execution on site..
Report to the project manager any technical problem in the Project.
Control the use of material and avoid damages and waste.
Roads & Infrastructure For Baniyas Sports Club Devlopment .
In General, theProject consist of earthwork, sub-base, asphalt, Storm water drainage, street lighting network, sewerage.electric power, future service duct, telecommunication ducting and manholes, Various structural concrete elements, valve chambers etc…, Ducting and Protection of Facilities.
• Responsibilities
Managed and carried out earthworks and pavements, storm wáter network and sewerage network as per drawings, specification& BBS Calculations with material handling.
Handing over of telephone network for ‘Roads and infrastructure for Baniyas Sports Club Development’ project.
Competent person from Transco company for work near Transco pipelines & premises.
Ensure that a progress record maintained as required for planning.
Handing over sewerage and storm water network to ADSSC operation and maintenance section and other parties.
Reconstruction Of Mafraq Interchange Project.
The project’s scope of work involves the demolition of the existing bridge and construction of directional three- level interchange having a two-span post-tensioned box girder bridge, 1, 728 m
of box girder Viaducts, reconstruction of 5 km of both Abu Dhabi-Al Ain and Dubai-Sila four-lane dual carriageways with all associated slip and loop roads in the vicinity of the new interchange.
consist of three levels of grade-separated traffic, including two viaducts and two loops as well as a 75-m-long main bridge, having four lanes per direction as well as storm water drainage, street lighting network, Sewerage.electric power, future service duct, box culvert, telecommunication ducting, manholes, various structural concrete elements, valve chambers etc…, ducting and Protection of Facilities
• Responsibilities
Execute and supervise the earthworks(reinforce fill), future ducts construction (telephone, irrigation &electrical cables ducts) and relocation storm wáter network and sewerage network.
Supervise epoxy coated steel reinforcement for bridge abutment .
Fair face repaire and minor repaire (concrete finishing) for bridge abutment and Panel walls.
Managing and implementation traffic diversions and supervisor of work at site as per the requirement of management of traffic engineering and road safety traffic department at Abu Dhabi Police.
Protection of existing utilities: Preparing of shop drawings, execution on site and ordering the material.
Preparing shop drawings and as built drawings for site works and submit it to all required parties.
Monitoring the work of sub-contractors.
-B.A degree in civil engineering from MU'TAH UNIVERSITY, 2007/2008.