مجدى على محمد حسين, Electrical principle engineer

مجدى على محمد حسين

Electrical principle engineer

ECG Engineering Consultant Group S.A

البلد
مصر - القاهرة
التعليم
دبلوم, Catholic protection engineering
الخبرات
40 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :40 years, 5 أشهر

Electrical principle engineer في ECG Engineering Consultant Group S.A
  • مصر - القاهرة
  • يناير 2002 إلى سبتمبر 2022

Project: New Annex to Transit Hall of Terminal BuildingNo.1 of Cairo International Airport
Achievements :
• Comprised site supervision of electrical installation, review of contractor’s shop drawing related to lighting, fire alarm, public address and signage system, master time system (MOSER-BARE AG, Sumiswald, Switzerland), verification of site work with respect to specifications and in accordance with local international standard / code practice

Electrical consultant engineer في Alturath engineering consulting
  • الإمارات العربية المتحدة - دبي
  • سبتمبر 2016 إلى يوليو 2022

Project: upgrade of electromechanical of CMMS of Road and Transportation Authority (DUBAI ) Achievements
• Design review design of UPS, switchgear, MCC, fire alarm and fighting systems, HVAC, power sizing cables, short circuit relays coordination. Auditing Factory and site tests procedures according to IEC, IEEE std, and Dubai Electricity and Water Authority (DEWA). Review PTW and verify OSHA regulation, DEWA regulations application regarding to safety and health
• Site inspection, work procedure auditing and witness FATs and SATs
• Procedures auditing for hazard zones installation of Onshore regarding to new utilities including fire and submersible pump stations
• Construction supervision and find solutions for the updated MEP projects
• Condition monitoring application and risk base (upon PMI) predictive maintenance using techniques of vibration, ultrasound and thermal images

Senior electrical engineer في Disouq petroleum company
  • مصر - كفر الشيخ
  • مارس 2015 إلى مارس 2016

Project: upgrade of Kafr Al Skekh LNG gas station
Achievements:
• Review planning schedule up to level four
• Approval of design shop drawings electrical/mechanical and Instrumentation drawings of LNG, ONSHORE plant
• New plant upgrade computerized management maintenance System CMMS.
• Categorize of List items A and B, during plant commissioning before start up
• Review and update final design of low and medium electrical switchgear, UPS, power generation modifications and shutdown matrix (utility, process, abandent) levels
• Design and overseeing the installation of electrical systems in oil & gas plants, power generation plant
• Preparation of projects specifications, budgets resources estimation, time scales, liaison with stakeholders and project disciplines managers
• implementing designs modifications of cathodic protection
• preparation tests procedures for FATS and SATs and coordinate with disciplines managers all site work
• Planning and execution and close out phases contribution for all electrical work through the aforementioned achievements
• Update project baseline by project management Microsoft project

Senior Electrical Engineer في RSPE Service petroleum company
  • مصر
  • يناير 2014 إلى ديسمبر 2014

Project: Installation of electrical LNG plant Achievements:
• Avoidance sustainability of the punch list items through issue NCRs during installation stage and clear it before start-up of LNG substation 33/11/0.4 KV
• Coordination electrical work between subcontractors upon GANTT chart
• Update project baselines every two weeks
• Preparation and escalate project technical reports to high management
• Site installation supervision and flow up
• Tracking deficiencies NCRs of installation and preparation of commissioning punch list classified either to A or B categories

Project Construction Manager في Lubrik Construction compan
  • نيجيريا - Warri
  • يونيو 2013 إلى ديسمبر 2013

Project: INDORAMA ELEME Urea plant jetty
Achievements:
• Upgradation of project time schedule baseline WBS up to level 4, through meetings with vendors and subcontractor lead them to effective contribution and review procurement specifications and duration
• Point out project time constrain, quality and solve related problems
• Review and approval risk matrix of shutdown
• Supervision of all site work and prevent any losses of working hours as per health and safety policy
• Handling all the electrical, instruments, mechanical work activities, resources related to electrical tasks and submit it to planning discipline
• Review bill of quantity upon detailed design
• Preparation work progress reports
• Analysing data
• attending meetings and giving presentations of essential points
• Risk base matrix update

Construction Electromechanical Manager في ABB contracting company
  • المملكة العربية السعودية - جدة
  • يونيو 2010 إلى سبتمبر 2011

Projects: Prince NORA university terminal substation, installation GIS, 380 KV double, Bus bar, 1.5 circuit breaker at Riyadh
QUAWISA Substation 3x67 MVA GIS type/132KV,
SHAMIYA Substation 3X67 MVA GIS type/132KV,
AL NUZHA Substation 3X67 MVA. GIS Type/132kV, double bus bar at Jeddah
Achievements:
• Review and update project baseline schedule Through liaison with construction/HSE/QA/QC Team work of princess Nora SS
• Resolve all 132KV substation NCRs during my existence at site
• Preparation of all project report and review and approve variation orders
• Attending Kick of meetings and periodical site and all project
• SCADA commissioning witness for NORA SS

Senior electrical engineer في APR power generation company USA
  • اليمن - عدن
  • ديسمبر 2007 إلى مايو 2010

Project: Modification a upgrade of mobile diesel power plant Achievements:
• Minimize mobile diesel generation power plants outages period to zero time through load peak period
• Resolve problems of 40 MW, 11/33 KV power plants voltage regulation
• Management of communication regarding operation between plants and ADEN city dispatching Centre
Electrical Project manager
Ringxon power electronic company - Through Advanced Energy Consultancy

Construction MEP Manager for gas turbine power plants في Al Arab Contracting Company (ACC) . EPC
  • المملكة العربية السعودية - ضبا
  • ديسمبر 2007 إلى مايو 2010

Projects TABOUK power plant up gradation by adding two gas turbines SEIMENS 2x70 MVA.
DUBA power plant up gradation through additional units 3x20 MVA, 13.8 KV-DUBA GIS Substation AREVA modifications through additional 132KV incomer feeders Achievements:
• Completion of DUBA extension plant, including (the stages of tender, procurement, Installation, commissioning, start-up ), start site preparation for TABOUK gas turbine power plant, start preliminary and detail design with SIEMENS and Saudi Electrical Authority
• I followed up company consultant detail design analysis through ETAP software usage of short circuit analysis and relays coordination,
• Power plant ground mesh and UPS capacity design calculation had done through my contribution with company consultant and obtain client approval
• Preparation of all project report and review material submittals status with vendors and approve variation orders
• I supervised and followed up all project departments work upon GANTT chart
• Site and office reports preparation daily, weekly and monthly

Electrical power system engineer في Ajec
  • المملكة العربية السعودية - أبها
  • يناير 2006 إلى نوفمبر 2007

Project: Qufedah power plant 2x 70 MW, GE frame 7AE, gas turbine
Achievements:
• Review, approval detail design, shop drawings of new gas turbine including UPS, low, medium switchgear (0.46and 13.8 KV), protection relays coordination complying with short circuit and power follow analysis
• I review fire alarm, fighting system modifications and approved it
• I solved all maintenance problem of the crude oil storage tanks, and its associated oil purification sulphur recovery units
• I supervised and managed the new installation of two new Gas turbine units General Electric frame 7AE and hook up procedures
• I contributed in the overhauling work of GE frame 5 generator done through supervision of de assembling and assembling, witness risk life assessment of the generator, review contractor material submittals, test procedures review and witness generator YOKE SATs
• I witnessed FATs brush generator rotor at, GE central work shop which placed at EL KHOBAR
• I supervised new switchgear the AL QUNFEDAH power plant 13.8 KV installation and hook up

Electrical assistant commissioning advisor في General Electrical
  • مصر - القاهرة
  • أبريل 2005 إلى سبتمبر 2005

Project: CAIRO NORTH power plant 3x 250 MW Phase Achievements:
• I contributed in commissioning of gas turbine GE frame 9, 11 KV, 380 v switchgear (Schneider), auxiliary transformers and start up transformers and emergency diesel generators
• I carries out all commissioning tasks which related to aforementioned achievements using LOTO safe work procedure

Commissioning Manager في Cegelec Company France
  • مصر - القاهرة
  • نوفمبر 2004 إلى فبراير 2005

Project: Cairo north combined cycle Power plant 83X250 MW - Phase 1 Cairo Achievements
• I resolved commissioning remaining punch list category B
• Responsibilities:
• Create good communications between subcontractors
• Guide and lead subcontractor and secure and increase the requested sources
• I attended meetings and solved all remaining delayed points with all stakeholder meetings

Electrical engineer - outsource في Bechtel UK company joint venture (EMC) company
  • مصر
  • يناير 2003 إلى ديسمبر 2003

Project: Scrab Safron (ONSHORE/OFFSHORE)
Achievements completed:
• I supervised all tasks execution of site electrical discipline work of RASHPETCO and witness SATs of ALSTOM Gas turbine
• (2x5.2 MW, 11KV), diesel generator (I MW, 11KV), MV, LV SCHNEIDER switchgear, distribution power transformers 12/0.4 KV, MCCs panels and cathodic protection, UPS, battery chargers, ground grid. Also I contributed and resolved problems in ROSETA production OFFSHORE platform shutdown and black out matrix
Auditing and report s preparation for the aforementioned tasks

Electrical principle engineer في ENGINEERING CONSULTANT GROUP
  • مصر - القاهرة
  • يناير 2002 إلى سبتمبر 2002

Project: New Annex to Transit Hall of Terminal BuildingNo.1 of Cairo International Airport
Achievements :
• Comprised site supervision of electrical installation, review of contractor’s shop drawing related to lighting, fire alarm, public address and signage system, master time system (MOSER-BARE AG, Sumiswald, Switzerland), verification of site work with respect to specifications and in accordance with local international standard / code practice

Electrical Maintenance Engineer في Rasheed Petroleum company
  • مصر - المنزلة
  • ديسمبر 2000 إلى يوليو 2001

Project: LNG ONSHORE Adeco plant Achievements:
• I resolved all pending commissioning punch list
• Preparation of all related work permits (PTW) for plant maintenance
• I supervised and executed all electrical preventive and corrective maintenance through MAXIMO software, and troubleshooting for two gas turbine generators, one diesel, low voltage substation 11KV/0.38 KV, all distribution transformers, cathodic protection system, two air compressors, fire alarm and fighting system through fire pump station, UPS and battery banks / battery chargers
Audit commissining procedures of
Alstom gas turbine
Schieneder 11 KV switch gear PLC
All Low voltage outdoor panels

Electrical construction site engineer في ECG engineering consultants group S.A
  • مصر - القاهرة
  • أغسطس 1999 إلى سبتمبر 2000

• Project: DREAM land buildings complexes and HELTON dream land hotel Achievements:
• I supervised all electrical installations and approved all related modifications
• I approved all material submittals, and contractor electrical shop drawings
• Preparation of project work progress reports daily basis

Senior Electrical Engineer في Khalda Petroleum Company (Repsol joint venture )
  • مصر - مرسى مطروح
  • نوفمبر 1998 إلى مايو 1999

• Project: Khalda LPG TAREK gas plant installation Achievements:
• I demonstrated commitment and professionalism rendering a valuable service to the project for process, utilities
• I supervised and resolved all electrical installations, the site installation super vision and reporting was done by me

Field Electrical Project Engineer في Arabian engineering and installations company
  • قطر
  • أكتوبر 1996 إلى نوفمبر 1997

• Project: RasLafan LNG plant
Achievements:
• I resolved all remaining punch List items of commissioning
• Responsibilities:
• Verifications of related documents regarding SATs witness and approval, for utilities of 7 x 30 MW Generator Transformers units (JOHNBROWN), 33Kv, 11 KV, 0.38KV substations
All electrical site reports had done by me

Electrical quality assurance engineer ( outsource ) في Raytheon USA /Ebasco ( joint venture )
  • مصر - بني سويف
  • نوفمبر 1995 إلى يوليو 1996

• Project: BANI SEWEF, THERMAL power plant 2X 650 MW-23KV/500/220 KV Achievements:
• Electrical inspection of power start up transformers 3x259 MVA -525KV/23 KV(ABB) -Switchgear 6.3 KV ( ABB )- Moror control centre - Medium voltage motors-Medium and low voltage power cables -Grounding grid -Cable trays, auditing of electrical commissioning , contribution of electrical design review, follow up electrical installation, and reporting

High Voltage Substation Warranty Engineer في Merlin Gerin company ( DRE Egypt Branch )
  • مصر - القاهرة
  • سبتمبر 1994 إلى أغسطس 1995

• Project: EL STDUM substation 3x125 MVA/220/66/11Kv Achievements:
• Resolve problems of guarantee period for New Sharkia substation (GIS ) 220/66/11 KV, El Estad substation (GIS) 220/66/11 KV, Dokki substation(GIS ) 66/11 KV, I replaced bus bar differential relay (GEC ) and fixed, connect a new back up distance relay for New Sharkia substation
• Also I supervised and refilling GIS double bus bar 66KV by SF6 after the inspection for Dokki substation (GIS )
All reports had done by me

Lead Electrical Engineer في ADGAS Company through outsource (Bin Al MASS General Maintenance Est)
  • الإمارات العربية المتحدة - أبو ظبي
  • يناير 1994 إلى يونيو 1994

• Project: LNG third train Achievements:
• I review and approved train three shop electrical shop drawing submitted by main contractor CCC
• I supervised and followed up electrical installation in compliance with project schedule
• I carried out preventive maintenance of trains one and two for all substations 11.0.38 KV, and its outstations of protection relays, Sulphur treatment plant, and also over overhaul of JOHN BROWB gas turbine alternator

Site Electrical engineer operation and maintenance في BI Water company / UK and ECG .SA joint venture
  • مصر - القاهرة
  • نوفمبر 1992 إلى سبتمبر 1993

• Project: AL Khosos pumping station Achievements:
• I prepared preventive maintenance time schedule, review spare part stock in compliance with health and safety rules safely conditions
• I Prepared major overhaul corrective maintenance for 11 KV motors Responsibilities:
• i supervised and planned preventive and corrective maintenance for RUSTON diesel generators 3MVA, 11 KV, GEC (11 KV) switchgear, and GEC (11 KV) motors (CACA type)
Also preparation all report of preventive and correction maintenance

Electrical Commissioning Engineer في BADR PETROLUEM COMPANY ( BAPETCO )
  • مصر - مرسى مطروح
  • يناير 1992 إلى أبريل 1992

• Project: Bed 3
• Location: Egypt Western desert Achievements:
• Witnessing of all commissioning inspections. testing of electrical plant assets and written contributing and computerised report on behave operation department hand over of plant
All electrical report wrote by me

Electrical Maintenance Technician ( A ) في Gasco
  • الإمارات العربية المتحدة - أبو ظبي
  • يونيو 1984 إلى أغسطس 1991

Project: Rawuis LNG gas Achievements:
• I carried out preventive and corrective maintenance tasks for GE gas turbine frame 5, Merlin Gerin 11 .o.4 KV , 11KVsubstation, 11KV Motor Air compressors ( HP, MP ), Storage area tanks LNG submersible pumps, LNG tanks heat tracing trace and cathodic protection

Electrical Maintenance Engineer في DEMINEX joint venture ( Suez Oil Company )
  • مصر - راس غريب
  • يناير 1978 إلى أبريل 1983

• Project: Development of crude oil production platform LL 87 and its well head plat form Achievements:
• Execution of all electrical preventive and corrective maintenance tasks
• At RAS GHARIB oil field for ONSHORE and OFFSHORE crude oil production plat form LL-87-1 and 2
• Responsibilities:
• I carries out electrical and instrument preventive and corrective maintenance tasks were for, Gas and diesel alternator ( KATO) low voltage switch gear POWEL switch gear, air compressors, leading pumps, public address, communication system, UPS, battery and battery chargers and fire alarm and fighting system

In charge في Commissioning
  • إلى
Electrical commissioning engineer في BECHTEL
  • الإمارات العربية المتحدة
  • إلى
Electrical commissioning engineer at offshore LNG في Rashed Oil Company
  • إلى
Electrical commissioning engineer at offshore في LNG
  • مصر
  • إلى
Electrical engineer third part for onshore LPG plant في REPSOL joint Venture Company
  • إلى
Electrical engineer third part for onshore في onshore LPG plant
  • إلى
Electrical guarantee and test engineer في EL STDUM
  • إلى

-PROJECT MANAGER OF VAR
COMPANSATION SUBSTATION ( SVC)
22OKv, 100 MVAR

- SUB STATION ( GIS) CONSTRUCTION
MANAGER. LINE VOLTAGE LEVELS
Page2/6
( 22O KV& 66 KV) 50 HZ AND ( 33 KV)
60 HZ

- SUB STATIONS AND POWER PLANT
COMMISSIONING MANAGER.

- ELECTRICAL COMMISSIONING
ENGINEER.

- ELECTRICAL PROJECT ENGINEER.
- ELECTRICAL POWER DESIGN ENGINEER
- ELECTRICAL MAINTENANCE ENGINEER.


AREA OF PROFICIENCY: 1- Managing of construction work, commissioning and start up
Activities between the client and different contractors.
2- supervision of construction team work during the execution
According to the safety regulation and work policy.
3- Preparation & implementation of commissioning procedures and schedules, and site quality plans.
4- Perform site electrical tests through auditing and checking regarding to
SATs &FATs
5- Revision of the design of the power system short circuit calculations.
6- Revision of the technical submittals
7- Hand over power plant to client
8- Technical support and advices for the maintenance during life
assessment
9- Power system analysis and design and short circuit studies, for oil
Company ONSHORE regarding to switchgear13.8 Kv high voltage
Motors and high voltage power cables
10-Electrical inspection fields.
11-Base and electrical design of gas turbine power plants and GIS
substation ( 220Kv & 66 Kv) 50Hz AND 33 Kv 60 Hz

CAREER HISTORY.\
From: 02-2012 to: 10 - 2012
UAE
RXPE power electronic company.
Project manager.
Compensating reactive power substations.I was in charge of completion of the substation project during the execution, monitoring and
closure phase, including installation test and commissioning, and start up
Page3/6
Also my duties was maintaining the safety record and safety precaution
review during these phases, and auditing the procedures of start up system
( LOCK OUT -TAG OUT)
220Kv/ 100 MVAR.

From: 6 - 2010 to:10- 2011
Saudi Arabia.
ABB contracting company.
Installation manager.
For Prince NORA university terminal substation, installation of two
Bays ( GIS, 380 Kv)
QUAWISA substation 3x67 MVA.GIS type
SHAMIYA 1 substation 3X67 MVA. GIS type
AL NUZHA substation 3.67 MVA. GIS type

From: 12- 2007 to: 5-2010.
Saudi Arabia
Arab contracting company ( ACC)
Senior electrical engineer of EPC scope of work of gas turbine power
Plants
For installation and commissioning of
TABOUK power plant up grading by adding two gas turbines
SEIMENS 2x70 MVA

DUBA power plant up grading by adding three units 3x20 MVA
DUBA GIS substation AREVA modifications
From: 01-2006 to: 04 - 2007.
Saudi Arabia
Saudi Electricity Company (through AJEC)
System electrical engineer in technical support section
At QUNFEDAH power plant monitoring and control of installation of
Two gas turbine units GENERAL ELECTRIC frame 7AE.
Direct and manage the overhauling work of the gas turbines units
Study the AL QUNFEDAH power plant 13.8 distribution network
short circuit to review the updated relays coordination setting

From: 1991 to: 2006
I WORKED FOR THE FOLLOWING PROJECTS THROUGH LOCAL
WORK AGENT.

Egypt
GENERAL ELECTRIC Company
Page4/6
(Electrical commissioning engineer &technical advisor
Assistant at CAIRO NORTH power plant 1*2 GENERAL
ELECTRIC frame 9)
Supervise subcontractors work, and hand over completed work to
Sponsor for gas turbine generators, auxiliary transformers, startup

Egypt
APACHY oil & gas joint venture Company
(Electrical commissioning engineer for 1*2 SOLAR gas turbine
2*4 MVA and POWEL SWGR)

Electrical construction engineer في BADR EL DEN oil company (SHELL
  • الهند
  • إلى

Direct and manage the commissioning and punch list work and hand
it to sponsor
Egypt
CEGELEC FRANCE
CAIRO NORTH POWER PLANT combined cycle
Commissioning manager, during the project closure stage, I was
In charge to finalize the punch list and close the procurements
Affairs and manage the preparation of project closure at site.
Egypt
BECHTEL ENGLAND company
Rashed Oil Company
Natural gas plant installation
Electrical commissioning engineer of BECHTEL for utilities which
were
ALSTOM Gas turbine 2x5.2 MW, diesel generator I MW and
MV, LV SCHNEIDER SWGR)
I was in charge of the work execution intergrated control to hand
Over the work to sponsor

Egypt
CAIRO air port moderation and up grading infra structure
ENGINEERING CONSULTANT GROUP (ECG)
Electrical principle engineer
I review all the electromechanical work design including the site shop
drawings. Work was installations of 11 kv switchgear ( SCHNEIDER)
Lighting, light current systems, and HVAC

Egypt
BECHTEL ENGLAND company
Rashed Oil Company
(Electrical commissioning engineer at offshore LNG
Production platform.)
Supervise the subcontractor offshore electrical and commissioning
Page5/6
Network
Egypt
ENGINEERING CONSULTANT GROUP (ECG)
Electrical principle engineer for different infra structure projects.

Egypt
REPSOL joint Venture Company
(Electrical engineer third part for onshore LPG plant
Utilities. Power plant 3*4 MW&6.6 Kv SWGR)
Attendance all the site tests for auditing and witness of
SOLAR gas turbines, GEC 11 KV switchgear, and 15 Kv power cable
Syria
AL FORAT PETROLEUM company
(Electrical instructor at the training center)
I was in charge of preparation training courses of the electrical
Equipment's, which were for electrical mechanics, transformers,
switchgears, protection relays, battery chargers and UPS
Qatar.
QATAR liquefaction natural gas company
RAS LAFAN LNG plant installation project
(Electrical design engineer for utilities of 7*30 MW generator transformers units ( JOHN BROWN), 33Kv, 11
Kv
Low voltage metal clad indoor type SWGR)
Finalizing the residual punch list points and documentation hand over

Egypt
RAYTHEON / EBASCO company
BANI SEWEF, THERMAL power plant (2* 650 MW) . And
associated, Substation ( GIS) 500 Kv /220Kv project
Quality assurance electrical engineer, I was in charge of verifying the performed work as per the relevant project standard

Egypt.
SCHNEIDER EGYPR branch.
EL STDUM substation 3x125 MVA project
Electrical guarantee and test engineer for the GIS. GIB and transformer stations 375 MVA, (500 Kv / 220 Kv /11Kv)
( 220 Kv / 11Kv) and ( 220Kv / 66Kv / 11 Kv)
I was in charge of finalization of the residua punch list item category
B, supervise the substation operation and the maintenance
UAE
ABU DHABI
ADGAS company
Page6/6
LNG third train installation project
Lead electrical engineer, in charge of design and verification that the finalization of the electrical installation as per the operational
conditions

Egypt
BI WATER & ECG joint venture
AL KHOSO pumping station
Electrical maintenance.

I was in charge to execute the preventive maintenance of RUSTON diesel
generators ( 3MVA, 11 Kv), and GEC 11 Kv switchgear, and GEC (11 Kv)
motors

Egypt
BADR EL DEN oil company (SHELL venture)
(Electrical construction engineer

I was in charge of design and follow up the execution of the electrical and instrumentation, including distribution transformer switchgear
SOLAR gas turbine, and all the field instrumentation

الخلفية التعليمية

دبلوم, Catholic protection engineering
  • في Alison
  • أبريل 2023

Cathodic protection engineering of OIl and Gas plants for ONSHORE and OFFSHORE platforms including design , construction and maintenance This regarding LNG ، petroleum oil plants

دبلوم, Equipment management in construction
  • في Alison
  • أبريل 2023

Economic operation of all construction equipment during projects installation

ماجستير, Electrical engineering
  • في Washington international university
  • أبريل 1999

Comparison of electrical standard IEC and IEEE for oil and gas industries and power plants

بكالوريوس, Electrical machines and power engineering
  • في Cairo university - Faculty of engineering
  • يوليو 1977

Electrical design of machines and power systems

بكالوريوس, Electrical Engineering
  • في Cairo University
  • يوليو 1977

Electrical power engineering

Specialties & Skills

Electrical Engineer
Electrical Testing
Electrical Design
Project Management
ELECTRICAL MAINTENANCE
ENGINEER
Extra , high , medium voltage network
Risk base maintenance
OIL FIELD
LNG industry
SUBSTATION
TURBINE
EPC electrical project
GAS TURBINE
Technical reports writing

اللغات

الانجليزية
متمرّس
الالمانية
مبتدئ
العربية
متمرّس

العضويات

Egyptian Engineers Association
  • Development of engineers skills
  • August 1977
PMI
  • Professional user
  • December 2012

التدريب و الشهادات

Software management course (تدريب)
معهد التدريب:
MS project management 2010 professional
تاريخ الدورة:
June 2015
المدة:
30 ساعة

الهوايات

  • Football
  • swimming
    good trainer