Elec/Mech Tech II
Halliburton
Total years of experience :5 years, 4 Months
06/2011 - 03/2013 Halliburton, Soyo, Angola
(Sperry Drilling Services Department - MLWD)
Job title: Elec/Mech Tech II (PRL Employee)
Duties as in Saudi Arabia and in addition to this the following:
Supervising and training the junior Technicians.
Assistant lead of the MLWD shop leader group.
Explaining in detail what is inside the tools and how they are opened and fixed and the sensor’s functions to the junior engineers.
Assistant Quality Controller (QC) in service quality control to troubleshoot and investigate MLWD tool failures.
Working with trouble combo tools from the start to the finish.
Building up tools inside the shop and finishing the Integrity Test.
Carrying out Confidence Combine Test for all MWD sensors together with Geopilot and Directional tool to ensure that they are all in good working order and there are no issues with the software before being released to the customer.
Carrying out all pre and post tests and checking the CBM of the tools and sensors by using the SAP System.
Printing out check sheets from Sperryweb for each sensor and connector, reading the manual for each sensor, and finding the latest software version for them.
Full servicing, physical checking, testing and calibration of ADR by using ADR Air hang program. Also, SSV by using Explorer Test.
Checking the mechanism of the oil and performing hydraulic confidence test of Geo Tap
.05/2011 - 06/2011 Halliburton, Hassi Messaoud, Algeria
(Sperry Drilling Services Department - MLWD)
Job title: Elec/Mech Tech II
Supporting and building tools for SONATRACH Company.
12/2007- 03/2011 Halliburton, Alkhobar, Saudi Arabia
(Sperry Drilling Services Department - MLWD - FE Shop)
Job title: Elec/Mech Tech II
Full servicing including physical checking and cleaning of all connectors such as long or short hard connect, Box A/C, Slim, Cim and Spacer Hanger, Pin A/C, etc.
Full servicing including physical checking, cleaning and insertion of inserts such as HCIM, PWD, DGR, etc.
Checking the Repair and Maintenance schedule hours for Preventive Maintenance Test if needed.
Full calibration of EWR-P4 "Electro Waves Resistivity Phase Four". Testing includes confidence test, Air hang test, Eeprom test and Heat up & Cool down cycle test to perform an accurate graph calibration.
Performing Gamma ray calibration and verification test.
Full servicing, physical checking, testing and calibration with source of all density tool and porosity tool sizes by using Star Manager Test. Also, verification by using Explorer Test Program to make sure that the tools work correctly in Down Hole.
Verification of all pressure tool sizes by using Ruska Test.
Full servicing of a new technology tool (AFR).
Building up tools of different sizes, making comparisons between the tools and joining the tools together.
Building up a probe to determine the drilling inclination angle.
Reading, understanding and following the Equipment Mobil Sheet (EMS) plan according to the customers’ requirements, e.g. Saudi Aramco.
Supporting Iraqi projects in Dubai from January 2011 to March 2011 by building RLL Tools.