Design and Production Engineer
Bilfal Heavy Industries Limited
مجموع سنوات الخبرة :9 years, 10 أشهر
Highlights:
• Managed the full range of design engineering disciplines services to include approval of engineering deliverables and implementation of the project in record time.
Key Responsibilities:
• Providing a high level of diverse operational and technical support to establish fuel tanks in the project electricity company to generate power.
• Responsible for the design, development and rapid production of industrial gas stations and refineries, petroleum, chemical and petrochemical projects and the desalination and electrical power.
• Instrumental in designing the implementation of reservoirs, in accordance with the approved designs with precision.
• Strong focus on improved efficiency and minimal downtime to optimize production by performing experimental tests at the end of the work of the establishment of the tank and providing detailed reports.
• Executing projects smoothly within assigned budget and timeline.
Highlights:
• Served as a Mechanical Site Engineer with the Ministry of the Interior in KAP 3 project.
• Involved in implementing the project in record time and in alignment with approved designs and systems; security and safety guidelines.
Key Responsibilities:
• Reviewed drawings and analyzed mechanical designs according to specification, while ensuring compliance with standards and codes approved by the agency and the Ministry of Interior standards.
• Performed design review and verification of all mechanical designs and accordingly approved contractor’s selection of mechanical equipment for the project KAP 3 for the Ministry of Interior.
• Monitored site Installations and ensured that the executed works should comply with project specification and relevant International standards and codes.
• Checked the work progress to ensure on-schedule completion of the project; submitted daily, weekly and monthly status reports to the management, highlighting the deviations along with proposals to eliminate bottlenecks.
• Examined site conditions of water purification and treatment station as required to support development and completion of projects.
• Planned the work and efficiently organized site facilities in order to meet agreed deadlines.
Key Responsibilities:
• Focused on long term solutions in production, to resolve repetitive challenges, day to day running of various processes, and improve production level, and minimize costs.
• Assisted in handling machine operation and monitoring of the production line on a daily basis
• Supported identification and improvement of scheduled maintenance tasks to improve machine reliability and factory production line.
• Submitted ideas to support continuous improvement in safety, quality, productivity, and cost for high-capacity casting material, mixed to produce different colors of granite types.
Other Professional Experiences:
Aug 2013 - Sept 2013: Trainee, Saudi Arabian Airlines
MECHANICAL ENGINEERING PRODUCTION AND PROGRAMMING SYSTEM