Total Years of Experience: 11 Years, 8 Months
August 2013
To Present
electrical and instrument Engineer
at Fluor
Location :
Saudi Arabia - Jubail
•Technology establishment, carrying out new substation devices installation, testing & pre-commissioning.
•Documents control including invoicing, progress reporting, and instrument tracking. etc. while ensuring their accuracy, quality and integrity.
•Involved with plant maintaining team in Process Control System for field instrumentation and proprietary vendor products while installing new field instruments.
•Control and monitoring of process variables during testing (e.g. flow, level, temperature, pressure, vibration, etc.) of pipeline and pumping parameters via Supervisory Control and Data Acquisition (SCADA) System.
•Involved in installation of plant equipment and critical facilities such as Fire-Water system, Pipeline Meter Proving System, Catholic Protection, booster and shipper pumps including storage tanks and pipelines, Back-Up Generators and UPS.
•Preparation of Inst. System Commissioning Strategy and Plan. Determine manpower requirements. Organizing and controlling vendor’s representative’s at site visits. Preparation of commissioning spare part list. Preparation of test equipment requirements. Supervising the site works. Supervising the loop checking activities, functional testing and punch list item clearing.
•Assist in Project Execution of Process Control System and Process Automation Network.
•Review design packages from design offices to ensure designs are in compliance to SA Engineering Standards and Process and Automation Industry acceptable standards.
•Factory Acceptance Test (FAT) and Site Acceptance Test (SAT).
•Pre-Commissioning and Commissioning.
•Assist in providing design enhancement to system functionality and reliability issues.
Coordinate with Technical Support Unit, SAPMT and Vendors regarding reliability issues of systems utilized.
•Facilitate the proper implementation of Saudi Sadara Safety Management System and Environmental Management System on Saudi Sadara Eastern Region Bulk Plants.
•Engineering and Maintenance in Calibration, Maintenance and Troubleshooting and participated in formulating possible enhancement to increase reliability, safety and efficiency of plant at energization stage.
•Documents control including invoicing, progress reporting, and instrument tracking. etc. while ensuring their accuracy, quality and integrity.
•Involved with plant maintaining team in Process Control System for field instrumentation and proprietary vendor products while installing new field instruments.
•Control and monitoring of process variables during testing (e.g. flow, level, temperature, pressure, vibration, etc.) of pipeline and pumping parameters via Supervisory Control and Data Acquisition (SCADA) System.
•Involved in installation of plant equipment and critical facilities such as Fire-Water system, Pipeline Meter Proving System, Catholic Protection, booster and shipper pumps including storage tanks and pipelines, Back-Up Generators and UPS.
•Preparation of Inst. System Commissioning Strategy and Plan. Determine manpower requirements. Organizing and controlling vendor’s representative’s at site visits. Preparation of commissioning spare part list. Preparation of test equipment requirements. Supervising the site works. Supervising the loop checking activities, functional testing and punch list item clearing.
•Assist in Project Execution of Process Control System and Process Automation Network.
•Review design packages from design offices to ensure designs are in compliance to SA Engineering Standards and Process and Automation Industry acceptable standards.
•Factory Acceptance Test (FAT) and Site Acceptance Test (SAT).
•Pre-Commissioning and Commissioning.
•Assist in providing design enhancement to system functionality and reliability issues.
Coordinate with Technical Support Unit, SAPMT and Vendors regarding reliability issues of systems utilized.
•Facilitate the proper implementation of Saudi Sadara Safety Management System and Environmental Management System on Saudi Sadara Eastern Region Bulk Plants.
•Engineering and Maintenance in Calibration, Maintenance and Troubleshooting and participated in formulating possible enhancement to increase reliability, safety and efficiency of plant at energization stage.
July 2012
To Present
site Electrical Engineer
at masco
Location :
Saudi Arabia - Jubail
Executing demolition of existing lighting poles that against civil works in all structures of the project according to IFC drawings.
Preparing all permits from Royal Commission and Road Department that are needed for work.
Preparing what is needed for starting the project ( materials, approvals, ….., etc).
Designing some of electrical works ( lighting, earthing system, distribution panels ) concerning the offices area.
Supervising all electrical works inside ( lighting, cabling, earthing, lightning and cable trays ), and outside the buildings ( installation of Lighting poles, cabling and cable ladders ).
Following up the materials coming from the head office.
Following up the suppliers when the materials are not coming in the same date .
Designing earthing and lightning systems for some projects.
Supervising all electrical installations the serve HVAC works ( cables, cable trays, cable ladders, installation of LV panels ).
Preparing all permits from Royal Commission and Road Department that are needed for work.
Preparing what is needed for starting the project ( materials, approvals, ….., etc).
Designing some of electrical works ( lighting, earthing system, distribution panels ) concerning the offices area.
Supervising all electrical works inside ( lighting, cabling, earthing, lightning and cable trays ), and outside the buildings ( installation of Lighting poles, cabling and cable ladders ).
Following up the materials coming from the head office.
Following up the suppliers when the materials are not coming in the same date .
Designing earthing and lightning systems for some projects.
Supervising all electrical installations the serve HVAC works ( cables, cable trays, cable ladders, installation of LV panels ).
November 2015
To December 2020
Electrical Engineer
at Honeywell
Location :
Saudi Arabia - Jubail
November 2015
To November 2020
fire and gas Engineer
at Honeywell
Location :
Saudi Arabia - Jubail
Responsible for the installation, commissioning, managing and/or maintaining Fire & Gas Detection field instrumentation and the sub-systems used to monitor and control CCTV fire detection systems and processes. Working closely with colleagues across a number of functions such as operations, purchasing and design
Plan utilization of resources, prioritize, and initiate O&M activities at designated Customer Service centers Ensure internal & Customer targets such as LPF, Safety, Availability monitor and report status.
Monitor and control expenses at regional level on total site expenses.
Oversee the activities of subcontractors' personnel and certify quality, quantity, completeness, billing, etc. as applicable; evaluate and report overall performance of subcontractors.
Man power planning, new sites & existing site capex & other expense planning, follow up
Plan utilization of resources, prioritize, and initiate O&M activities at designated Customer Service centers Ensure internal & Customer targets such as LPF, Safety, Availability monitor and report status.
Monitor and control expenses at regional level on total site expenses.
Oversee the activities of subcontractors' personnel and certify quality, quantity, completeness, billing, etc. as applicable; evaluate and report overall performance of subcontractors.
Man power planning, new sites & existing site capex & other expense planning, follow up
January 2014
To October 2020
Service Engineer
at Honeywell
Location :
Saudi Arabia - Jubail
Share on Facebook
Share on Twitter
Share Via Email