Construction Project Manager في BLUEPRINT
  • قطر - الدوحة
  • أشغل هذه الوظيفة منذ مايو 2022

Projects:
- Louis Vuitton - Doha Oasis mall
- Le Relais de l’’entrecote - Vandome mall
- BARBAR Restaurant - Vandome mall
- Davi’s Hot Chicken Restaurant- Vandome mall

Responsibilities as a Project Manager:
- Site supervision;
- Site visits with the clients to explain the finishing types, materials, and furniture selection;
- Coordinate between the technical office and the client;
- Doing daily reports and analysis for the client until the delivery date.

Finishing Construction Manager في Al Madar Contracting
  • قطر - الدوحة
  • أغسطس 2021 إلى أبريل 2022

Project:
ALSAD Health Center with a total area of 10000 m2

Responsibilities as a Project Manager:
- Coordination with clients, consultants, and sub-contractors for effective project management for all project-related matters;
- Preparing formats for reporting site works for Planning Engineer;
- Supervised all construction activities of the project;
- Planning and supervising the manpower requirement and taking care of vendor development by calculating materials, workforce, tools, plant and machinery, sub-contract works, etc.

Consultant Project Manager في DSC International
  • مصر - القاهرة
  • مايو 2020 إلى يونيو 2021

Projects:
200 villas with a total area of 10000 m2 (residential villas) at Military Entity, New Capital, Cairo, Egypt

Client:
Egyptian Army

Responsibilities as a Project Manager:
- Supervised all construction activities of the project;
- Coordination with clients, consultants, and sub-contractors for effective project management for all project-related matters;
-Preparing formats for reporting site works for Planning Engineer;
- Planning & supervising the manpower requirement & taking care of vendor development by calculating materials, workforce, tools, plant & machinery, sub-contract works, etc.

Fit Out Project Manager في Interprogetti
  • قطر - الدوحة
  • ديسمبر 2018 إلى ديسمبر 2019

Projects:
- Calm street café-lusail
- Eleven-eleven café -Pearl Qatar
- Altitude gym-lugsail
- Yateem -City center mall
- Yateem-Qatar mall
- Boba- Doha festival city
- Burgarills-palm mall
- Kunafa house -pearl Qatar
- Graze -Pearl Qatar
- Walter’s -Lusail
- Caffeinated-Lusai

Responsibilities as a Project Manager:
- Site supervision;
- Site visits with the clients to explain the finishing types, materials, and furniture selection;
- Coordinate between the technical office and the client;
- Doing daily reports and analysis for the client until the delivery date.

Senior Project Engineer في Ghantoot Construction and Transport Development
  • قطر - الدوحة
  • نوفمبر 2015 إلى نوفمبر 2018

Projects:
High rise office building with a total area of 6000m2 (Commercial/office building/stores (3B+G+M+1) at Marina Mix-26 Lusail city, Doha, Qatar, with budget (92 million QR)
Client:
Union Trust

Responsibilities as a Project Manager:
- Supervised all construction activities of residential and commercial buildings;
- Overall Charge of the building including Project Management, Subcontractor Management, Design Coordination, Vendor finalization, and Invoice Certification;
- Coordinate between the technical office and the client;
-Doing daily reports and analysis for the client until the delivery date.

Senior Project Engineer في A’yaan Ash-Sharq for Construction (AAC)
  • قطر - الدوحة
  • ديسمبر 2012 إلى يوليو 2015

Projects:
- Cladding factory with a total area of 8000 m2 consists of Factory 4200m2+ Office building 200m2 + 2 floors+substation 100kv + services rooms, with budget (13 million QR)
- Parking lot and services roads for the cladding factory (Mix design of DBM, BC, various tests of Bitumen, soil as per IS, BS, MORT&H)
- Mosque MD5 model with total area 13000 m2 consists of mosque 400m2+ emam house 200m2+moazeen house 150m2+ Substitution, with budget (33 million QR)
- Office building and ancillary work for the Department of Mechanical Equipment (MMAA), with a budget (45 million QR). Including:
- Construction of 6 steel park shades each one
800m2
- Construction of 1 workshop building 1900m2
with 2 lift crane
- Construction of 2 admin offices each one
400m2
- Construction of Substation
- Construction of park area (Mix design of DBM,
BC, various tests of Bitumen, soil as per IS, BS,
MORT&H)
- Construction of sewerage gravity lines along
with associated manholes and IC Building
connection

Client:
- Fahd Bin Abduallah Althani
- Ashghal Qatar

Responsibilities as a Project Manager:
- Supervised all construction activities of residential and commercial buildings;
- Overall Charge of the building including Project Management, Subcontractor Management, Design Coordination, Vendor finalization, and Invoice Certification;
- Coordinate between the technical office and the client;
- Doing daily reports and analysis for the client until the delivery date.
- Performing work inspections, and material inspections individually and in conjunction with consultants for compliance with drawings, specifications, and scope.

Civil Project Engineer في Delta Urban Development (DUD)
  • مصر - القاهرة
  • أغسطس 2011 إلى نوفمبر 2012

Projects:
- Republican guard Complex project consists of 9 buildings in Cairo, Egypt, with budget of (150 million EGP) including:
- Construction of 8 residential towers each one
14 floors (650m2)
- Construction of 2 basements for parking and
services( 3400 m2)
- Construction of 1 commercial building 14
floors (400m2)
- Construction of 4 lane internal road
- Construction of sewerage gravity lines along
with associated manholes and IC
- Office building headquarter of Engineering for the petroleum and process industrial (ENPPI) (4th-floor extension), with a budget of (15 million EGP).

Clients:
- Republican guard
- Engineering for the petroleum and process industrial (ENPPI)

Responsibilities as a Civil Project Engineer:
- Site supervision
- Supervised all construction activities of residential and commercial buildings;
- Overall Charge of the building including Project Management, Subcontractor Management, Design Coordination, Vendor finalization, and Invoice Certification;

الخلفية التعليمية

بكالوريوس, Civil Construction And Civil Engineering
  • في The Higher Technological Institute 10th of Ramadan City (HTI)
  • أغسطس 2011

Present Status: Bachelor Degree in Civil Engineering. Graduation Year: June 2011 Cumulative GPA: 3.2 “Very Good” - Graduation Project Grade: A-

Specialties & Skills

Project Management
Leadership
Construction & Property
Management
Engineering-management

اللغات

الانجليزية
متمرّس

التدريب و الشهادات

Assistant Technical Engineer (تدريب)
معهد التدريب:
Arac Company
تاريخ الدورة:
June 2010
المدة:
240 ساعة

الهوايات

  • Photography