infrastructure engineer.
Saudi Arabian Parsons limited
Total years of experience :13 years, 9 Months
My role description
1- I was one from team who making Revision for all drawing and document for the contract before contractor start the execution
2- Revision all shop drawing coming and data sheet for every utility from the contractor (Roads - storm water - sewer-Irrigation tank- telecom-potable water ) before the execution start
3- Coordinate with the inspectors for making inspection for every activity in the site (WIR )
4- Taking the report and photo form the inspectors and prepare daily report for inspection item and reported to my senior
My role description
1- Design and revision all drawing for execution roads surface drainage
2- Calculate the quantities required for leveling the site (cut- fill)
3- Making for every site (longitudinal section -cross section- details of pavement and curbs) for every road
4- design of storm drainage network(general layout plan - profiles - all details required for execution)
5- Calculate the run off and intensity for every site and also the velocity in the pipe line and discharge for the pipeline
6- prepare BOQ .and specifications for every site
8- A list of some projects that I have designed during my work at the Ministry of Housing for the internal road network.
مهندس موقع لاعمال الحفر والردم واعمال تنفيذ الطرق
مهندس اشراف علي اعمال تنفيذ الطرق
التقدير العام مقبول مشروع التخرج ميكانيكا التربة وحاصل علي دورات رسم اتوكاد وبرنامج بريميفيرا