Total Years of Experience: 13 Years, 3 Months
January 2019
To Present
Product Development Director
at agrimatic
Location :
Egypt - Cairo
Agrimatic is a Technology Company with the mission of creating highly efficient innovative agriculture technology that overcomes the ever-rising challenges to food security.
- Led the design of a Global G.A.P. certified Hydroponic Production Facility on an area of 1500 square meters that produce 9x the production of a traditional farm and with shorter production cycles.
- Led the design of an Intensive Aquaculture Production System that optimizes the cost per unit produced and allow significant profitability even in wholesale markets.
- Developed a department manual, which helped speed up the orientation of new team members by 5x.
- Developed 2019 projects pipeline according to TRL (Technology Readiness Level) and department strategies in liaison with CEO, R&D Manager and Business Development Manager.
- Introduced a weekly industry-review-hour which helped the team stay updated to the industry news.
- Led the design of a Global G.A.P. certified Hydroponic Production Facility on an area of 1500 square meters that produce 9x the production of a traditional farm and with shorter production cycles.
- Led the design of an Intensive Aquaculture Production System that optimizes the cost per unit produced and allow significant profitability even in wholesale markets.
- Developed a department manual, which helped speed up the orientation of new team members by 5x.
- Developed 2019 projects pipeline according to TRL (Technology Readiness Level) and department strategies in liaison with CEO, R&D Manager and Business Development Manager.
- Introduced a weekly industry-review-hour which helped the team stay updated to the industry news.
January 2017
To December 2018
Chief Technical Maestro
at agrimatic
Location :
Egypt - Cairo
- Implemented Lean Six Sigma skill-set that increased revenues and reduced operational costs in all of our facilities.
- Developed Value Stream Maps (VSM) for production facilities which helped prioritize process improvement events (Kaizen events).
- Orchestrated the completion of an "impossible project" which is the design and manufacturing of a 1 Ton Water Boiler that operates using diesel in 45 days which helped save the company hundreds of thousands EGP.
- Led the design of a lean Global G.A.P. Post Production Facility that achieved personnel and machine utilization of at least 95%.
- Reduced the development life cycle 20% by streamlining processes through the implementation of Six Sigma, motivating and training employees, improving project management, and instilling accountability.
- Developed Value Stream Maps (VSM) for production facilities which helped prioritize process improvement events (Kaizen events).
- Orchestrated the completion of an "impossible project" which is the design and manufacturing of a 1 Ton Water Boiler that operates using diesel in 45 days which helped save the company hundreds of thousands EGP.
- Led the design of a lean Global G.A.P. Post Production Facility that achieved personnel and machine utilization of at least 95%.
- Reduced the development life cycle 20% by streamlining processes through the implementation of Six Sigma, motivating and training employees, improving project management, and instilling accountability.
March 2016
To December 2016
Process Engineer
at Agrimatic
Location :
Egypt - Cairo
- Reduced production time by 20% by designing a pre-production facility with special tables that achieved flawless production flow with almost zero downtime.
- Reduced downtime by standardizing most of the company's activities by creating SOPs (standard operating procedures) documents for engineers and workers.
- Delivered and conducted workshops about Lean & Six Sigma to train scientists and engineers on the philosophy of Lean manufacturing.
- Proposed a company communication framework that improved communicating updates on all levels, which significantly reflected on the productivity of the company.
- Reduced downtime by standardizing most of the company's activities by creating SOPs (standard operating procedures) documents for engineers and workers.
- Delivered and conducted workshops about Lean & Six Sigma to train scientists and engineers on the philosophy of Lean manufacturing.
- Proposed a company communication framework that improved communicating updates on all levels, which significantly reflected on the productivity of the company.
January 2012
To January 2016
Soft/Business Skills & English Trainer
at Fekr | Training & Consultancy
Location :
Egypt - Cairo
- Designed (ID) and trained: Communication Skills, Presentation Skills, Public Speaking, Leadership, Strategic Planning and Anger management.
- Conducted 300+ TNA and trained 6000+ hours "Public" and "Corporate" calendar.
- Participated in Consultancy projects with focus on Change management, Organizational Design (OD), Operations Management and Growth management.
- Conducted 300+ TNA and trained 6000+ hours "Public" and "Corporate" calendar.
- Participated in Consultancy projects with focus on Change management, Organizational Design (OD), Operations Management and Growth management.
February 2014
To August 2014
Process Engineer
at Auto Cool Factory
Location :
Egypt - Cairo
- Applied (VSM) on radiators production line and six-sigma 5S tool which reduced downtime by 60%.
- Introduced a color-coded Kanban board to organize and schedule production activities, which improved engagement of operators and reduced clutter in workplace.
- Reviewed quality of copper pipes and improved quality control (QC) charts to ensure reliability of outputs, which removed some of the inspection activities, as they were no
longer needed.
- Introduced a color-coded Kanban board to organize and schedule production activities, which improved engagement of operators and reduced clutter in workplace.
- Reviewed quality of copper pipes and improved quality control (QC) charts to ensure reliability of outputs, which removed some of the inspection activities, as they were no
longer needed.
November 2012
To December 2013
Marketing and Public Relations Manager
at AIESEC
Location :
Egypt - Zagazig
February 2013
To March 2013
TV Presenter
at Iqraa International TV
Location :
Egypt - Sharm el Sheikh
I presented a show for kids called (Hello my Friends). It was a show of 30 episodes and the channel aired it in Ramadan for 2 years.
My Responsibilities:
- Designing and writing half of the show content.
- Coaching a co-presenter.
- Creating and presenting all the intros and outros for each episode.
- Building rapport with kids by engaging them in a variety of games and activities.
My Responsibilities:
- Designing and writing half of the show content.
- Coaching a co-presenter.
- Creating and presenting all the intros and outros for each episode.
- Building rapport with kids by engaging them in a variety of games and activities.
Share on Facebook
Share on Twitter
Share Via Email