testing and commissioning of south depot metro
worked in riyadh international airport
To correspond and co-ordinate with Electrical Engineer of Consultant regarding approval of drawings and works. Installation, testing and commissioning of internal and external works of Electrical.
•To prepare the Shop drawings of Electrical works as per the specification and norms of Client.
•To prepare the revision drawings as per the consultant on shop drawing and resubmitting the drawings taking the approval.
•To Co-ordinate with the site Project Managers and Jr. Engineer (Electrical) of the related works. Preparation of running account bills with the help of Jr. Engineers (Electrical) and onward submission to the concerned division and interact with the consultant for payments.
•Project progress monitoring and reporting as per schedule
•Effective Coordination in conducting material, equipment and installation inspections according to project specifications and standard
•Coordinate with other services for necessary clearance and ensure work executed in planned sequence
•Able to prepare monthly progress reports for works and submit to Project Manager
•Issuing Non Conformance Report to sub-contractors, wherever required
•Documentation of various inspections held & prepare defect list to clear with the subcontractor
•Effective Coordination with Consultant-client/Sub-contractors for approval of engineering & Construction, Site test activities
Responsibilities:
•Project Planning, Installation, Commissioning, Maintenance and Operation of All Electrical Equipment’s.
•To review / assess technical specification and drawings to determine suitable vendors and suppliers
•Erection, Commissioning and Maintenance of co-generation plant with 16.25 MW with 90TPH boiler with 132kv and 11kv breakers. Controlling with DCS Technology. Maintenance of ESP (Electro static preceptor) with two chambers (kirloskar).synchronizing with grid.
•Installation, Commissioning and Maintenance of 33/11kv plinth mounted substation plant with 100kva transformer.
•Erection, Commissioning Maintenance and Operation of Steam Generators (M/s Tokyadenki, Japan) and Steam turbine (M/s Shin Nippon, Japan).
•Supervision of Testing and commissioning lighting, power, fire alarm, public address, building management system, access control, master clock system &CCTV system, Etc
•S7 and Rs-logix, drives, switch gear, breakers, control wiring and panel drawing.
, (