QA/QC Electrical Engineer
Khatib & Alami
Total des années d'expérience :14 years, 1 Mois
Duration-From 02/2022 to Present.
1. Preparing Inspection Requests (RFI's), Performing, Assisting, Coordinating for Site Inspections, Site Acceptance Tests & Factory Acceptance tests.
2.Preparing and Documenting Method Statements, Inspection Test Plan (ITP), Checklists, Operation & Maintenance Manuals.
3. Witnessing Testing & Commissioning of HV SWGR, LV SWGR, Transformers, Power Distribution Units, Remote Power panels, Auto transfer Switches, Load banks, Lighting & Power Panels, Distribution Boards, Busduct, capacitor Banks, earthing etc..
4. Preparing, Updating QAQC Log sheets & Tracking Sheets. Documenting and maintaining all QAQC Records.
5.Reviewing Material Submittals, Drawings, Technical Documents for compliance.
6. Coordinating and guiding construction team for NCR Close outs, Observations Closeouts. Managing Site QC Inspectors and Inspection requests.
1. Executing Electrical Works on site, Preparing manpower schedules, weekly, monthly lookahead schedules.
2. Installation, Testing & Commissioning of HV SWGR, LV SWGR, Transformers, Lighting & Power Panels, Distribution Boards, Busduct, capacitor Banks, earthing etc..
3. Preparing Material Requests, planning site activities as per material availability.
4. Managing, and controlling site engineers, and subcontractors in order to extract work. Controlling project cost, Assisting QS for billing.
5. Verifying subcontractor Bills, quantities. Preparing Purchase Orders, Work Orders. coordinating with Suppliers, vendors for material Selections.
6. Coordinating with Consultants and other contractors for executing work smoothly.
1. Preparing Inspection Requests (RFI's), Performing, Assisting, Coordinating for Site Inspections. Coordinate all site inspections with the site subcontractors.
2. Documenting and maintaining all QAQC Records. Assisting Commissioning activities.
3. Reviewing Material Submittals, Method Statements, ITPs, Drawings, Technical Documents for compliance.
4. Coordinating and guiding construction team for NCR Close outs, Observations Closeouts.
5. Attend the weekly QC meetings and issuance of nonconformance reports in conjunction with the site QC manager Assist the site QC manager in the organization, maintenance and control of the quality system.
On site Installation of Remote Terminal Unit (RTU). LV Cable Laying and Termination.
Integrating RTU with Filed Devices like Cercuit Breakers, Transformers, Current Tranformers, Voltage Transformers, Capacitor Banks etc..
Designing of SCADA System, assigning tagnames, values, graphical properties etc.
Integrating SCADA System to the RTUs.
Performing Site Acceptance Test (SAT), for local and remote operations of breakers, CT, PT values, Transformer tap positions etc.
Position- Electrical Engineer Duration-From 05/2010 to 05/2012.
Le lien a été supprimé pour non-respect des conditions d'utilisation. Veuillez contacter l’équipe d'assistance pour plus d'informations.