Mohammed Zafar Iqbal, Tech

Mohammed Zafar Iqbal

Tech

Aramco

Location
India - Bengaluru
Experience
4 years, 0 Months

Share My Profile

Block User


Work Experience

Total years of experience :4 years, 0 Months

Tech at Aramco
  • United Arab Emirates
  • March 2023 to October 2023

• ERP Transformation -Fiori Track
• Worked with Proponent on the requirement of the New Fiori Apps.
• Worked Closely with Technical Developers for successful development and deployment of the Apps.
• Worked with Authorisation Team to add catalogue to the roles and move.
• Perform successful testing for the Apps.
• Worked on below Customised Apps. a. Chemical Utilization Apps. b. Spares Part Interchangeability. c. Measuring Documents

System Integration Analyst at NTT DATA
  • Qatar
  • December 2013 to April 2014

Environment: SAP ECC 6.0 EHP 5

Project (Bangalore, India) Honeywell Aero Business (Aerospace)

Responsibilities:
• Roll out activities for Honeywell Plants
• Support Scenarios of Drop shipment, Induction, customer returns.
• Involved in Development of Objects like reports, enhancement, forms which are estimated above 80 Hrs
• Preparing FS for above objects
• Creating transport request in charms and getting it approved
• Interacting with Honeywell Coe's for all inputs regarding the development
• Giving training to End users

Associate Consultant at Wipro Infotech
  • United Arab Emirates
  • March 2011 to November 2011

Environment: SAP ECC 6.0 EHP 5

Project: (Pune & Faridabad), India SPANDAN Business (Automobile earthmovers)

Responsibilities:
• Coordinated with JCB Core Team Members for the CSBP.
• Data Collection regarding Blueprint and studying the landscape of present system.
• Complete configuration of PM module and preparation of configuration Document.
• Preparation of all documents as per audit requirements.
• Migration of the configurations to the Quality system.
• Carrying out the Unit Test cases & Integration test
• Development and FS writing for new requirement and GAPS
• Involved in the master data activity.
• Preparation of End User Manual and giving training to Users

Project: (Seohara, Uttar Pradesh), India BSC Business (Sugar)

Responsibilities:
• Coordinating with BSC Core Team Members for the CSBP and processing the same.
• Gathered various business requirements of the Birla Sugar Company and prepared FSBP (Future State Business Process) for the same.
• Defined and assigned the enterprise structure.
• Worked on the Breakdown, preventive and calibration scenarios.
• Performing unit testing and integration testing of their business.
• Preparing the Functional specifications for the developments of various reports in Plant Maintenance.
• Coordinating with the Abaper and providing the Logic to complete the reports
• Preparing the configuration document of PM

Maintenance Engineer at Carlo Gavazzi Arabia Ltd
  • India
  • March 2007 to March 2008

Project: Jeddah, KSA SAUDI ARAMCO Business (Oil & GAS)

Responsibilities:
• Preparing daily reports, updating calibration records, preparing request for spare parts and consumables.
• Worked in calibration of conductivity and Ph analyzers
• Pressure calibration of Grabner Minivap Vps
• Worked with Irox 2000 gasoline analyzer
• Worked with various Density meters like Anton Paar DMA 48, 58and 4500
• Worked with Herzog Auto Distillation for light and heavy products and also regular troubleshooting like replacing thermocouples and heaters
• Worked in Flash Point Analyzer Herzog, preventive maintenance and changing the heater on regular intervals.
• Worked in Dionex ICS 90 Ion Chromatograph and troubleshooting of the instrument usually with columns
• Worked in Hach spectrophotometer and turbidity meter.
• Worked in viscosity meter make of Anton Paar SVM 3000, general maintenance.
• Worked in Thermo XVI + trace sulphur and Thermo TS 3000 trace chloride Analyzer.
• Worked in Perkins Elmer Spectrophotometer Lambda 2 old model.
• Worked in ISL freezing point Analyzer.
• Octane engine sand Blasting and preventive maintenance.

Maintenance Engineer at Sindhura Constructions
  • India
  • May 2004 to June 2005

Responsibilities:
• To handle erection work and post erection maintenance activities for various companies for their project in Visakhapatnam Steel Plant.
• Manpower Allotment for Maintenance activities
• Handling the Critical parts and other spare parts of various companies for their ongoing projects at Visakhapatnam Steel Plant.

Bayt Tests

IQ Test
IQ Test
Score 62%

Specialties & Skills

SAP ABAP
SAP CRM
INTEGRATION
AUTOMATION
INFOGRAPHICS (ILLUSTRATION)
MFG/PRO (ERP)
PROCUREMENT
DISTILLATION
CALIBRATION
COMMISSIONING
CONSTRUCTION

Languages

English
Expert