Total years of experience :29 years, 6 Months

General Manager at Sanmar Properties Limited
  • Bangladesh
  • My current job since January 2014

DUTIES AND RESPONSIBILITIES :
1. Schedule the project in logical steps and budgeted time required to meet deadlines.

2. Determine labor requirements and dispatch workers to construction sites.

3. Inspect and review projects to monitor compliance with building and safety codes, and other regulations.

4. Interpret and explain plans and contract terms to administrative staff, workers, and clients, representing the owner or developer.

5. Prepare contracts and negotiate revisions, changes and additions to contractual agreements with architects, consultants, clients, suppliers and subcontractors.

6. Obtain all necessary permits and licenses.
7. Direct and supervise workers.

8. Study job specifications to determine appropriate construction methods.

9. Select, contract, and oversee workers who complete specific pieces of the project, such as painting or plumbing.
10. Requisition supplies and materials to complete construction projects.

11. Prepare and submit budget estimates and progress and cost tracking reports.

12. Develop and implement quality control programs.

13. Take actions to deal with the results of delays, bad weather, or emergencies at construction site.

14. Confer with supervisory personnel, owners, contractors, and design professionals to discuss and resolve matters such as work procedures, complaints, and construction problems.

15. Plan, organize, and direct activities concerned with the construction and maintenance of structures, facilities, and systems.

16. Investigate damage, accidents, or delays at construction sites, to ensure that proper procedures are being carried out.

17. Evaluate construction methods and determine cost-effectiveness of plans.

Project Manager at Basic Engineering Ltd.
  • Bangladesh
  • January 2013 to December 2013

Project Name:Bibiyana Gas Plant Expansion Project, Bangladesh
EPCM Contractor : Foster Wheeler ( An American Company ), Thailand
Contractor; Basic Engineering Ltd.
Client : Chevron ( Bangladesh ) Ltd.
Contract Value :US $ 12 million
Project Description:This new project will include expansion of the gas plant in order to increase the production of natural gas from the Bibiyana Gas Field, North-Eastern Bangladesh, additional development of gas wells, and an enhancement of gas recovery unit. The estimated cost of the project is approximately US $ 500 million and it is expected that this project will boost up the total gas production of Chevron Ltd. by more than 300 million cft per day. First production is expected in 2014. Construction of civil works includepile and pile cap construction for machine foundations, building, flexible and rigid pavement, sub-station etc.
DUTIES AND RESPONSIBILITIES :
1. Ensures construction work of assigned project is implemented within budgeted time, cost, and quality standards on assigned site.
2. Optimizes manpower, equipment, and materials allocation, and ensures no materials are wasted on assigned site.
3. Assigns responsibilities to on-site staff .
4. Ensures staff and non-staff employee safety in coordination with Safety Officer.
5. Supervises staff and non-staff attendance and productivity.
6. Interfaces with sub-contractors to ensure compliance of project implementation with construction schedule.
7. Assists with preparation of construction schedule, manpower histogram, submittal log, and drawing log, and any changes thereof.
8. Assists with preparation of two-week look-ahead schedules for project implementation.
9. Coordinates with Clients and Consultants on preparation of all project submittals and drawings.
10. Interfaces with suppliers to verify materials received.
11. Oversees purchase and delivery of required materials, and inflow/outflow of site store materials in coordination with Procurement Department.
12. Attends weekly or monthly meetings with Clients, Consultants and Site Engineer(s) for look-ahead plan.
13. Interfaces with consultants on site-related matters.

Project Manager at Islam Trading Consortium Ltd.
  • Bangladesh
  • July 2010 to December 2012

Project Name:Road Network Improvement and Maintenance Project - 2 ( RNIMP - II )
Contract No.: 4
Road Name : Patiya - Dohazari Road
Client :: Ministry of Communications, Department of Roads and Highways , Bangladesh
Funded by :Asian Development Bank;
Contract Value :US $ 15 million .
Project Description: Construction of 26 Km road with a total width of 7.30m including hard and soft shoulder on both sides. This road consists of 50 mm thick bituminous wearing course with 100 mm thick bituminous binder course using marshall and super pave design method. Other works are construction of layer by layer earthworks, construction of 300 mm thick Improved sub-grade and 250 mm thick aggregate - sand subbase and 300 mm thick base course materials, construction of 46 nos. two vents of reinforced box culverts and construction of three nos. 90 m long P.S.C girder bridges, R.C.C U-shaped drain, Surface drain, office building etc.
DUTIES & RESPONSIBILITIES:
1. Ensures construction work of assigned project is implemented within budgeted time, cost, and quality standards on assigned site.
2. Optimizes manpower, equipment, and materials allocation, and ensures no materials are wasted on assigned site.
3. Assigns responsibilities to on-site staff .
4. Ensures staff and non-staff employee safety in coordination with Safety Officer.
5. Supervises staff and non-staff attendance and productivity.
6. Interfaces with sub-contractors to ensure compliance of project implementation with construction schedule.
7. Assists with preparation of construction schedule, manpower histogram, submittal log, and drawing log, and any changes thereof.
8. Assists with preparation of two-week look-ahead schedules for project implementation.
9. Coordinates with Clients and Consultants on preparation of all project submittals and drawings.
10. Interfaces with suppliers to verify materials received.
11. Oversees purchase and delivery of required materials, and inflow/outflow of site store materials in coordination with Procurement Department.
12. Attends weekly or monthly meetings with Clients, Consultants and Site Engineer(s) for look-ahead plan.
13. Interfaces with consultants on site-related matters.

Project Manager of a highway construction project funded by World Bank at Isiam Trading Consortium Limited ( ITCL ), Dhaka, Bangladesh
  • Bangladesh
  • January 2008 to June 2010

Project Name: Rural Transport and Improvement Project ( RTIP );
Contract Package No.:CHA/UZR - 20; Chandpur
Road Name : Sepaikandi - Kalirbazar - Dhaka - Chittagong Highway.
Client : Ministry of Local Government and Engineering Department, Bangladesh
Funded by : World Bank;
Contract Value : BDT 1325 million .
Project Description: Construction of 39.5 Km road with a total width of
7.30m including hard and soft shoulder on both sides. This road consists of 50 mm thick bituminous wearing course with 12 mm thick bituminous seal coat using marshall and super pave design method. Other works are construction of layer by layer earthworks, construction of 30cm thick sub-grade and 150 mm thick aggregate - sand subbase and 200 mm thick base course materials, construction of 10 nos. two vent of reinforced box culverts and construction of four nos. 30 m long R.C.C bridges, R.C.C U-shaped drain, Surface drain, office building etc.

DUTIES & RESPONSIBILITIES:
1. Overall responsibilities of project management including planning and programming for the completion of the project within desired time frame,
2. Preparing Interim payment certificates,
3. Controlling the finance in order to finish the project in the budgeted cost,
4. Supervising all kinds of structures in the road project (like asphalt works, pavement works, earth works, bridges, culverts, drains, toe walls, retaining walls etc.),
5. Handling all kinds of suppliers and subcontractors,
6. Controlling and maintaining a large number of workers, laborours and equipment using in the road project,
7. Controlling the qualities of construction materials and works,
8. Directing survey work for alignment, cross sections, leveling and grading of roads.
9. Coordinating among client, consultant and contractor,
10.Responsible for execution of all kinds of construction works,
11.Maintaining all laboratory and field tests related works,
12.Procurement and management of all construction materials etc.

Project Manager of a Highway Construction Project funded by Asian Development Bank at Isiam Trading Consortium Limited ( ITCL ), Dhaka, Bangladesh
  • Bangladesh
  • April 2006 to December 2007

Project Name : Road Improvement and Maintenance Project ( RMIP )
Contract No. : 1
Road Name : Chandina - Comilla and Feni Mohammad Ali - Baroiarhat National Highway.
Client : Ministry of Communications, Department of Roads and Highways
Funded by : Asian Development Bank
Contract Value : BDT 1400 million
Project Description : Construction of 53 Km road which consists of layer by layer earthen embankment for 2 m widening on both sides of existing road, Compacted subgrade, Improved subgrade, Subbase, Lower base, Upper base, Bituminous binder course and Bituminous wearing course. Other works are 2 nos Bridges, 3 nos Culverts, Rigid Pavement at market place, R.C.C covered drain, lane divider, Bus bay etc.
DUTIES & RESPONSIBILITIES:
1. Ensures construction work of assigned project is implemented within budgeted time, cost, and quality standards on assigned site.
2. Optimizes manpower, equipment, and materials allocation, and ensures no materials are wasted on assigned site.
3. Assigns responsibilities to on-site staff .
4. Ensures staff and non-staff employee safety in coordination with Safety Officer.
5. Supervises staff and non-staff attendance and productivity.
6. Interfaces with sub-contractors to ensure compliance of project implementation with construction schedule.
7. Assists with preparation of construction schedule, manpower histogram, submittal log, and drawing log, and any changes thereof.
8. Assists with preparation of two-week look-ahead schedules for project implementation.
9. Coordinates with Clients and Consultants on preparation of all project submittals and drawings.
10. Interfaces with suppliers to verify materials received.
11. Oversees purchase and delivery of required materials, and inflow/outflow of site store materials in coordination with Procurement Department.
12. Attends weekly or monthly meetings with Clients, Consultants and Site Engineer(s) for look-ahead plan.
13. Interfaces with consultants on site-related matters.

Project Manager at Isiam Trading Consortium Limited ( ITCL ), Dhaka, Bangladesh
  • Bangladesh
  • February 2005 to March 2006

Project Name : Periodic Maintenance Project, PMP 2005 - 2006, Khulna
Contract No : 05,
Road Name: 1) Khulna - Satkhira Road : 13 Km 2) Khulna - Bagherhat Road : 8 Km 3) Jhenaidah - Chuadanga Road : 12 Km 4) Chuadanga - Mujibnagar Road : 11 Km
Client : Ministry of Communications, Department of Roads and Highways
Funded by : Department for International Development ( DFID )
Contract Value : BDT 792 million
Project Description : Construction of 44 Km Road consisting of 50 mm bituminous binder course, 50 mm bituminous wearing course, total 2m widening on both sides of existing road done by 250mm Improved subgrade, 150mm Aggregate-Sand subbase and 150mm Base course, layer by layer earth work, R.C.C surface drain, Saucer drain, Lane divider etc.
DUTIES & RESPONSIBILITIES:
1. Planning and Management of Construction of the projects.
2. Monitoring the Physical and Financial Progress of Project and performance of contractors and administering contract clauses.
3. Periodic Inspection of works, progress review, problem identification, formulation and solutions thereto.
4. Coordination with Survey, Design, Geotechnical, Hydrological, Material, logistic, and supplies Divisions of the Construction Team.
5. Contract Administration Planning, Scheduling, and monitoring.
6. Ensuring quality control.
7. Progress Monitoring, Estimation, Billing and Financial/Claim monitoring and overall Control of the projects.
8. Documentation, preparation of various reports such as; Construction progress reports, Audit Reports etc.
9. General correspondence and record keeping.
10. Making legal Advice in light of the Contract Agreement.

Project Manager at Isiam Trading Consortium Limited ( ITCL ), Dhaka, Bangladesh
  • Bangladesh
  • February 2004 to January 2005

Project Name : Periodic Maintenance Project, PMP 2003 - 2004, Feni
Contract No : 07
Road Name : Feni Mohammad Ali-Chagalnaiya ( Old Dhaka-Chittagong Road ) : 32 Km
Client : Ministry of Communications, Department of Roads and Highways
Funded by : Department for International Development ( DFID )
Contract Value : BDT 680 million
Project Description : Construction of 32 Km Road consisting of 50 mm bituminous binder course, 50 mm bituminous wearing course, total 2m widening on both sides of existing road done by 250mm Improved subgrade, 150mm Aggregate-Sand subbase and 150mm Base course, layer by layer earth work, R.C.C surface drain, Saucer drain, Lane divider etc.
DUTIES & RESPONSIBILITIES:
1. Planning and Management of Construction of the projects.
2. Monitoring the Physical and Financial Progress of Project and performance of contractors and administering contract clauses.
3. Periodic Inspection of works, progress review, problem identification, formulation and solutions thereto.
4. Coordination with Survey, Design, Geotechnical, Hydrological, Material, logistic, and supplies Divisions of the Construction Team.
5. Contract Administration Planning, Scheduling, and monitoring.
6. Ensuring quality control.
7. Progress Monitoring, Estimation, Billing and Financial/Claim monitoring and overall Control of the projects.
8. Documentation, preparation of various reports such as; Construction progress reports, Audit Reports etc.
9. General correspondence and record keeping
10. Making legal Advice in light of the Contract Agreement.

Deputy Project Manager at Isiam Trading Consortium Limited ( ITCL ), Dhaka, Bangladesh
  • Bangladesh
  • March 2003 to January 2004

Project Name : Dhaka Urban Transport Project ( DUTP ), Dhaka
Contract No. : ( W ) C15C
Road Name : Farmgate - Jahangir gate - Mohakhali - Banani- Staff College Road
Client : Dhaka City Corporation, Bangladesh
Funded By : World Bank
Contract Value : BDT 460 million
Project Description : Improvement and beautification of 7 Km road consisting of 100 mm bituminous binder course and 80 mm bituminous wearing course. Other works are construction of road divider with plantation, underground cable duct, manhole, R.C. C U- shaped surface drain, V- shaped saucer drain, paving tiles at footpath etc.
DUTIES & RESPONSIBILITIES:
1. Monitoring the Physical and Financial Progress of Project and performance of contractors and administering contract clauses.
2. Periodic Inspection of works, progress review, problem identification, formulation and solutions thereto.
3. Coordination with Survey, Design, Geotechnical, Hydrological, Material procurement, logistic, and supplies Divisions of the Construction Team.
4. Contract Administration Planning, Scheduling, and monitoring.
5. Ensuring quality control.
6. Progress Monitoring, Estimation, Billing and Financial/Claim monitoring .
7. Documentation, preparation of various reports such as; Construction progress reports, Audit Reports etc.
8. General correspondence and record keeping.

Deputy Project Manager at Isiam Trading Consortium Limited ( ITCL ), Dhaka, Bangladesh
  • Bangladesh
  • September 1999 to February 2003

Project Name : Road Rehabilitation and Maintenance Project - III.
Contract No.: F-7
Road Name : Bhola Bus Stand - Bankerhat- Vedhuria and Velumia
Client : Ministry of Communications, Department of Roads and Highways
Funded By : World Bank
Contract Value : BDT 1386 million
Project Description : Construction and improvement of 25 Km road which consists of layer by layer earthen embankment, subgrade, Improved subgrade, Aggregate Subbase and Base course, Bituminous wearing course. Other works are construction of four nos. prestressed concrete bridges, 26 nos. R. C. C culverts ( 2, 3 and 4 vents ), a 160 m long closure, R.C.C drain, Retaining wall, Toe wall etc.
DUTIES & RESPONSIBILITIES:
1. Inspected, checked and supervised all kinds of construction work so that the works are conformed to the drawings and specifications and completed in budgeted time and cost..
2. Coordination with Survey, Design, Geotechnical, Hydrological, Material procurement, Logistic, and Supplies Divisions of the Construction .
3. Strictly follow and implement the plan and programe of the project so that the works are completed in time and engage all staff of road and equipment divisions to their duties.
4. Inspected and checked all the materials delivered in the job site as per quantities and qualities required.
5. Performed materials survey for probable sources and reporting the approximate quantity available and suitability.
6. Fully acquaintance with the standard procedures of sampling, testing and control.
7. Kept a record of the daily activities ready for inspection anytime.
8. Recommend for remedial measures for the correction of the unsatisfactory condition of materials and appearance of undesirable concrete and asphalt product.
9. Progress Monitoring, Estimation, Billing and Financial/Claim monitoring 10. Documentation, preparation of various reports such as; Construction progress reports, Audit Reports etc.
11. General correspondence and record keeping.

Civil Engineer at Al-Zahra Contracting Co.; Ras Al Khaimah, United Arab Emirates ( UAE )
  • United Arab Emirates - Ras Al Khaimah
  • August 1997 to August 1999

Project Name : Construction of Two Storey Residential Building
Project Description : Construction of 11 nos. two storey residential buildings of plinth area 600 sq. m to 1000 sq. m with boundary wall.
DUTIES & RESPONSIBILITIES
1.Supervised the construction of hollow block perimeter fence, pouring of footing, column, beams and floor slabs and installation of sanitary pipe lines.
2. Prepared and submitted to the payroll of workers.
3. Prepared and submitted to the owner list of materials to be purchased necessary for the construction.
4. Overall site supervision, survey, estimating and assurance of quality control etc.

Material and Highway Engineer at Isiam Trading Consortium Limited ( ITCL ), Dhaka, Bangladesh
  • Bangladesh
  • October 1994 to July 1997

Project Name :Road Overlay and Improvement Project
Contract No. : 5
Road Name : Lohagara - Chiringa on Chittagong to Cox’s Bazar National Highway
Client : Ministry of Communications, Department of Roads and Highways
Funded By : Asian Development Bank
Contract Value : BDT 1792 million
Project Description : Construction of 28 Km road which consists of layer by layer earthen embankment in hilly area by huge earth filling and cutting, Compacted subgrade, Improved subgrade, Subbase in pavement and in shoulder, Lower base, Upper base, Bituminous wearing course. Other works are 9 nos. Pipe Culverts, 21 nos. Box Culverts, 3 nos. Bridges, Cut off drain, Rigid Pavement in Market place etc.
DUTIES & RESPONSIBILITIES:
1. Inspected, checked and supervised all kinds of construction work so that the works are conformed to the drawings and specifications.
2. Responsible for all survey works.
3. Strictly follow and implement the plan and programe of the project so that the works are completed in time and engage all staff of road and equipment divisions to their duties.
4. Inspected and checked all the materials delivered in the job site as per quantities and qualities required.
5. Daily inspection of contractor's field activities to ensure that the work method and materials incorporated into the works are conforms to the plans and specifications.
6. Supervised field density test for all kinds of materials such as embankments, sub- grade, subbase, base and bituminous wearing course to ensure that the works are conforms to the plans and specifications.
7. Advised the contractor on the acceptance or rejection of construction materials intended for use based on test results.
8. Performed materials survey for probable sources and reporting the approximate quantity available and suitability.
9. Fully acquaintance with the standard procedures of sampling, testing and control.
10. Kept a record of the daily activities ready for inspection anytime.

Education

Bachelor's degree, B. Sc. in Civil Engineering ( Four years course )
  • at Chittagong University of Engineering and Technology, Bangladesh
  • August 1994

Specialties & Skills

Microsoft Word
MS Project
Primavera P6
MS Word, MS Excel, Auto CAD,Primavera, MS Project etc.

Languages

English
Expert
Hindi
Intermediate

Memberships

Institute of Engineers, Bangladesh
  • Fellow
  • November 2011

Training and Certifications

Health, Environment and Safety Training (Training)
Training Institute:
CHEVRON (BD ) Training Centre, Bibiyana, Sylhet, Bangladesh
Date Attended:
January 2013
Duration:
48 hours