Senior Electrical Engineer (HV)
Al Habtoor Leighton Specon LLC
مجموع سنوات الخبرة :16 years, 8 أشهر
Working with Al Habtoor Leighton Specon LLC
Senior Electrical Engineer (HV)
From Dec 2009 to Present
Reporting to the senior project manager.
Responsible for all site activities such as installation of LV & HV cable laying, switchgears,
Transformers & other electrical equipment and substations associated works including testing and commissioning.
Installation of fiber optic and control cable for communication, protection and monitoring purpose of HV feeders and switchgears.
Carefully studying the approved electrical design & schematic drawing and executing the work
accordingly.
Coordinating with client, consultant and various Dept. of ADDC for site inspections & approvals,
getting NOCs & Clearance from ADDC and other relevant Govt.department for substations & Electrical system Energisation,
Execute all the works as per ADDC & other Govt. Dept. specifications & regulations, Supervising,
collecting and clearing ADDC safety Documents during the process of substation energization.
Preparing material submittal document for ADDC submission & approval.
Assisting in preparation of shop drawings as well as As-Built drawing for ADDC submissions & approvals,
Estimation of materials, man power and machineries as per projects requirement,
Co-ordinating with client, consultant, ADDC, & other Govt. Dept. during the process of execution
& completion of project.
Worked with M/S Ranya Contracting Est.
Client: SEHA
Consultant: BURT, HILL
Contractor: Al Habtoor Leighton Specon LLC.
Duration of work: From Jan 2012 to till date.
Project Scope:
Installation of 22kv HV switchgear panels, Transformers and HV cables and energization of 1no. SWS-Station & 12 nos. substations and permenant power supply to Zayed University,
Khalifa city -B
Client: MUBADALA
Consultant: AECOM/Parsons International.
Contractor: Al Habtoor Specon/Hastie international.
Duration of work: From to Sep 2010 to Dec 2011
Project Scope:
Installation of 22kv HV switchgear panels, Transformers and HV cables and energization of 5 nos. 22kv substations in PARIS SORBONNE UNIVERSITY. Al Reem Island.
Client: MUBADALA
Consultant: Parsons International.
Contractor: Al Habtoor Specon LLC.
Duration of work: From Dec 2009 to Sep 2010
Project Scope:
Cable installation work for the connections of bulk consumers in eastern region Abu Dhabi
Emirate. Installation work of 33kv and 11kv underground XLPE cable installation associated
Equipments and testing and commissioning as per ADDC specification interconnect
With existing circuit
Contract: D - 9649
Site Engineer.
From Dec 2007 to Dec 2009.
Site In-Charge
From Aug 1996 to Nov 2007
Reporting to the project manager.
Responsible for all site activities such as Erection of 33kv and 11kv overhead Line, Street lighting
works.
Installation of HV & LV panels and 11kv 33kv package unit substation, Transformers, Tee Ring
main unit, Feeder pillar, Service Turret and laying of HV & LV cables and associated works.
Execute all the works as per the work order issued by the Client according to their specification.
Assisting in preparation of shop drawings as well as built drawings.
Preparing joint measurement after the completion of work and get certified by the concerned
engineer for preparing the progress payment.
Supervise site survey works
Estimation of materials, man power and machineries.
Testing of 33kv & 11kv cable and Electrical equipment.
PROJECT INVOLVED
Project Scope:
Installation of 22kv HV switchgear panels, Transformers and HV cables and energization of 5 nos. substations and permenant power supply to New Mafraq Hospital - Mafraq,
Abudhabi.
Substation installation, OHL Tramission line installation upto 33kV.
Client: ADDC
Contractor: Ranya Cont. Est
Duration of work: From Aug 2008 to Dec 2009
Project Scope:
Supply & installation of 33/11kv overhead pole line and associated equipment (Lot-1) and testing and commissioning as per ADDC specification, interconnect with existing circuit.
Contract: A -3877
Client: AADC
Contractor: Ranya cont. Est.
Duration of wor: Feb 2008 t0 Aug 2008
Project Scope:
Al Reem Island Development, 11kv Temporary network: Laying of 75 km 11kv
underground cables, Installation of 42 nos of 11/.415kv package unit substations and 5 nos.
QRM in Reem island including testing and commission of 11kv cables, package units and
QRMs. Bringing temporary 11kv power network from ADDC E 19 Pry.
Client: ADDC/BUNYA
Consultant: PARSONS International
Contractor: Ranya Cont. Est.
Duration of work: Apr 2006 to Feb 2008
Project Scope:
North East BAB-Phase 1 Development Project. ( Al Dhabiya & Rumaitha oil field)
Installation of 7 kms 33kv steel lattice tower line in Dhabiya. Erection of 63 kms wooden
pole 33kv overhead line including OPGW line and feeding power supply to Rumaitha oil
field wells.
Client: ABUDHABI OIL COMPANY. (ADCO)
Main Contract: Technip/NPCC
Sub-contractor: Ranya Cont. Est.
Duration of work: Dec 2004 to Apr 2006
COMPUTERS SKILLS
MS Office 2003/2007.
Adobe Acrobat Reader
Internet.
MS Internet Explorer
MS Out Look
B.Tech ( Electrical Engineering )