Maintenance Manager
Sama Ready Mix Company
Total years of experience :16 years, 6 Months
Maintenance of batching plant, truck mixer, concrete pumps, generators, bulker cement vehicle.
Making plan for preventive maintenance.
Supervised daily operations efficiency, employee
performance, preventive maintenance and safety.
Reviewed technical documentation to complete
equipment maintenance and repair.
Record maintenance sheet at ERP program and calculate maintenance cost and technician productivity.
training programs for maintenance team.
Help and support maintenance team for troubleshooting.
Supervise and implement anew project serving production operation.
Prepare the maintenance budget .
Determination of specification for new machines and equipment.
Working at Calcium Nitrate line, Map line, NPK powder line, Potassium nitrate Urea Phosphate line and Sulfate Potassium.
Maintenance electrical instruments, motor and its VFD.
MCC panels maintenance, packing machines and burners.
Working at central conditional air and boiler.
Design electrical panel for new line with classic control, PLC, SCADA systems and connecting together.
Spare parts order and test.
Arrange training course for new technician.
Daily report from shifts and making monthly report to manager.
Discussing daily reports and discussing faults.
Renew and update production line
Mange work with AIC company to renew and update old electrical system of production line with new LV electrical panels, DC drives, PLC and SCADA system and operate.
Receive all new machines and tools.
Arrange shifts according to plan of work.
Supervise of maintenance operation for motors, transformers, air compressor and cables.
Making reports, check list of maintenance and arrange shifts.
Making cold test to all connecting wiring.
Design and implement control circuit matching with production line needs.
Spare parts order.
2 production lines for steel rolling mill supervise and operate and maintenance.
Ac / Dc motors maintenance and its drives with full control.
Control with sensors and motors and equipment.
Operate and supervise the production line.
All circuit with classic control and plc Siemens step 5.
Shift report.
production line for packing