Product marketing coordinator
Dorma gulf
مجموع سنوات الخبرة :12 years, 4 أشهر
• SAP Key user for MEA Region.
• Assisting team in day to day marketing tasks and coordinating marketing projects.
• Supporting marketing team by gaining marketing intelligence and collecting competitor information.
• Producing additional marketing communications, such as product samples, Brochures etc.,
• Produce clear and concise written correspondence in the form of letters and emails.
• Creating new materials, updating selling price, solving technical errors and maintaining the material data in SAP.
• Producing Concept CAD drawing and Designing Customized sample for Dealers.
Production Head and QA/QC IN-CHARGE”.
• Assembling and testing, software Deploying (licensing, Windows 7, 8, 8.1 Hardening (Kiosk supports), branding and configuring, and testing).
• IT support in setting up email accounts and office 365 servers.
• PC installation, configuration and interfacing products such as Face Points, View Points & Room points
• Installation and interfacing with other devices such as surrounding ambience module, camera, projectors and light controlling devices via cloud server for wireless controlling.
• Troubleshooting technical issues.
• Leading team by interacting within the company to fill the communication gap to maintain the steady flow of assemblies and complete factory acceptance tests before promise date.
• Performed Quality check on Nails, Maintenance and calibration of Nail Making Machine and Nail Polishing Machine. Alignment and sharpening Cutter-Head.
Detail study of WRM and BRM plants from intake “billets” to output products “Bars and Wires”.
Discussed the working, controlling of plant and troubleshooting for errors and maintenance. Assignment on “shearing machine” for calculating shear speed with respect to billet speed Which chops head and tail of rolling billets to reduce cracking due to heat lose at the Ends.
Understood the task work performed by Plant Planning Engineer and to maintain the work order notified by operator and maintenance schedules using SAP (ERP management).
Understood the task work performed by Plant Planning Engineer and to maintain the work order notified by operator and maintenance schedules using SAP (ERP management).
er in each plants assigned by HR manager.
B.E. (Bachelor of Engineering - Mechatronics), 2010-2013, (7.73/10 CGPA) Manipal Institute of Technology, Manipal, Karnataka, India. ------------------------------------------------------------------------------------------ CURRICULUM PROJECTS ------------------------------------------------------------------------------------------ Title : Mechatronics Based Automatic Parking (MAP) system for Indian cars. ------------------------------------------------------------------------------------------ Synopsis: Designing and fabrication of an Electronically controlled sensors assisted automatic parking system installed proto car. The purpose of this project is to control element namely Steering Wheel, Accelerator pedal, brake pedal, clutch pedal etc to perform secure (avoiding parking accidents) and accurate parallel parking. Sensors are used to sense the moving surrounding and the parking space and acknowledge the MAP system to perform parallel parking. ------------------------------------------------------------------------------------------
Diploma in Mechatronics Engineering, 2007-2010, (77.75%) Distinction, S.N.M Polytechnic, Moodbidri, Karnataka, India ------------------------------------------------------------------------------------------ CURRICULUM PROJECTS ------------------------------------------------------------------------------------------ Title: Automatic staircase climbing Robot ------------------------------------------------------------------------------------------ Synopsis: Designing and fabrication of automatic staircase climbing robot. It consists belts mounted on pulleys which perform moment of the robot. Whole body is two parts; front part is pivoted to second chassis part, and operated by motor to pitch up and down. Two more motors are mounted either sides of chassis to belts for moment of robot. Whole robot is controlled by microcontroller assisted by two sensors and powered by 12v battery supply. Front sensor senses the stair step and raise the front part to match step height further moment of robot cause robot to lift in incline position and front part is brought back to chassis level and provide gripping stair steps, And helps in climbing of robot. ------------------------------------------------------------------------------------------