Installation and Start Up Engineer
Siempelkamp Pte.Ltd
Total years of experience :13 years, 8 Months
Supervised and scheduling the installation of electrical equipment (hardware
and software) for new and old plant for wood based industry (MDF, PB, OSB).
• Managed group of technical installation team consisted of contractors and
customer to ensure the installations are executed as per engineering design.
• Positioning electrical peripherals such as local panel, switchgear cabinet, and
junction boxes, local disconnect according to electrical layout.
• Deciding type of cable (power, control and communication) subject to its
application which is used in the installation if there are any amendments needed.
• Deciding position of grounding bar, type of grounding cable and its installation
accessories and perform the measurement upon completing the installation.
• Hands on to troubleshoot and fix of hardwiring using the correct tools when
performing I O checks during pre-commissioning and full commissioning.
• Site management by generating proper technical weekly report regarding design
errors and non-conformance issues of equipment, parts and site’s situation.
• Worked together with Mechanical Engineering Department to ensure the
installation can be done in systematic way.
• Experienced in designing and modifying electrical grounding layout by using
Auto CAD.
• Able to work as a team that comprising international colleagues from Germany,
Republic Czech, India, China and etc.
• Supporting customer’s production.
• 90% travel internationally for projects execution with at least 3 months minimum
stay in jobsite, subject to sites’ situation.
IO check and pre-commissioning for dust
collecting system
*To be confirmed
Electrical Installation
Thailand
(Metro
IO check forming station for OSB line
Thailand
(Vanachai
Supervise grounding measurement
-Support I/O test in glue line for MDF
production line
Bangladesh
(Akij)
(2 years) -Supervise cable tray and grounding
installation
-Supervise I/O test at mat former, fibre
transport system and sanding line
-Support customer’s production
Romania
(Yildiz
Entegre
Supervise cable tray installation
-Supervise cable installation
Thailand
Supervising cable trays and cables
installation at Sanding line
China
Supervise grounding measurement
-Supervise I/O test for MDF finishing line
Iran
(Arian
Supervise grounding installation and
measurement for MDF line
-Support cable tray supervision
Indonesia
(PT Canang
Design grounding layout with Auto CAD
-Design cable tray with Auto CAD
Turkey
Supervise grounding installation and
measurement
-Supervise SIEMENS Profibus
installation with configuration for MDF
line
Germany (HQ
Krefeld
Supervise grounding installation
-Supervise grounding measurement
Poland
In charged with daily electrical maintenance activities to ensure daily targeted
uptime can be achieved.
• Liaised up with local authority (TNB) in order to obtain reasonable electricity
tariff for industry.
• Assisted in fire recovery to set up 2 new pressing lines for Siempelkamp
(German) Contiroll.
• Negotiating with international suppliers to execute project (example supplier
from South Korea).
• Responsible for HT and LV equipment maintenance such as transformers,
capacitor bank, ACB, VCB, etc.
, Gajwa-Dong, Incheon South Korea
Production Planning Team (On Job Training
, Gajwa -Dong, Incheon, Korea.
courses: Certificate in Korean Language and Culture