Lead team/field engineer
Shabakkat System Dynamics
Total des années d'expérience :6 years, 2 Mois
• Managing installation projects, survey projects and maintenance operations for ZAIN networks.
• Follow up power and telecom teams in the field for preventive and corrective maintenance.
• Managing expenses and project budget.
• Handle Customer Problem.
• Perform Maintenance Routines and providing the technical support.
• Analyze Maintenance Routines Result.
• Documenting the daily progress, weekly and monthly reports to Maintenance department.
• Support KPI monitoring, identify issues, analyze and troubleshoot and escalate, as needed, for resolution.
• Performed Preliminary Acceptance Test (PAT) and Final Acceptance Test (FAT).
• Installing, Commissioning, integration, troubleshooting and Preventive maintenance and corrective maintenance of GSM/UMTS radio sites BTS and MW links:
ERICSSON RBS 2000 series, 6000 series and Mini-Link Traffic Node 2p, 6p and 20p.
HUAWEI BTS 2G 3900 & DBS 3900 and 3G Node B and HUAWEI MW Link RTN 910, RTN 950.
NSN BS 240 XLII, BS 82 II e-Micro and MW links SRAL XD Link.
• Performed Preliminary Acceptance Test (PAT) and Final Acceptance Test (FAT).
• Maintenance for power supply unit (Siemens, Ericsson, power one, ELTEK).
• Installing, commissioning and maintenance NSN Cabinets (BS 240 XL, BS 240 XL II and BS 82 II e-Micro) and MW link SRAL XD system.
• Maintenance for Ericsson RBS 2206 and 2216 and T.N. 2p, 6p and 20p.