محسن ابو عسل, GT commissioning TFA

محسن ابو عسل

GT commissioning TFA

ansaldo

البلد
مصر - الإسكندرية
التعليم
ماجستير, Mechanical Engineering
الخبرات
17 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :17 years, 9 أشهر

GT commissioning TFA في ansaldo
  • الصين - Guozhen
  • أشغل هذه الوظيفة منذ فبراير 2018

perform cold and hot gas turbine commissioning

Gas turbine commissioning TFA في Ansaldo energia
  • الصين
  • أغسطس 2018 إلى يونيو 2019
MECHANICAL COMMISSIONING ENGINEER في SAMSUNG C & T
  • قطر
  • أغسطس 2016 إلى فبراير 2018

Activities Commissioning for SIEMENS Gas Turbine Frame SGT5-4000F and steam turbine frame 4000F Which included:

For gas turbine 4000F ( V94.3 A)

• Pre-commissioning of Lubrication oil and control oil Flushing
• Cold commissioning of gas turbines systems individually
(Air intake system, evaporative cooler system, Wet-compression system, Fuel gas system, lube oil and lifting oil system, hydraulic optimization system (HCO), hydraulic oil system, IGV adjustment, compressor air blow off system, turbine cooling air system)
• Commissioning of generator
• Lead and coordinate Start up and Operation activities during hot commissioning.
• Ensures that all safety and precautionary requirements and procedures are followed during the commissioning process in line with the commissioning schedule.
• Reporting to the Commissioning manager.
• Performing all required maintenance
• Training and guide the owner engineers (operation and maintenance )

For steam turbine (4000 F)
• Pre-commissioning of lube and control oil flushing
• Commissioning of lube oil system (adjusting throttle valves, change over test, function test)
• Commissioning of bearing (adjust of sensors )
• Commissioning of gland sealing system
• Commissioning of vacuum pumps
• Performing steam blow
• Commissioning of main steam valves
• Reporting to the Commissioning manager.
• Performing all required maintenance
• Lead and coordinate Start up and Operation activities during hot commissioning.
• Ensures that all safety and precautionary requirements and procedures are followed during the commissioning process in line with the commissioning schedule.

Mechanical Commissioning /Operation Engineer في General Electerical
  • مصر - أسيوط
  • يوليو 2015 إلى يونيو 2016

• Commissioning for GE Gas Turbine Frame 9E Which included:
• Lubrication oil and control oil Flushing
• Fuel Gas pipe line air blowing.
• Fuel oil flushing.
• Water injection flushing.
• GT Pre commissioning start up.
• Lead and coordinate Start up and Operation activities.
• Ensures that all safety and precautionary requirements and procedures are followed during the commissioning process in line with the commissioning schedule.
• Reporting to the Commissioning manager.
• Operation and monitor gas turbine
• Training and guide the owner operators.
• Performing all required maintenance

Mechanical Commissioning Engineer في General Electerical
  • مصر - الغردقة
  • أبريل 2015 إلى يونيو 2015

Oil flushing on six GE gas turbine frame LM 6000 (6 * 50 MW)
• System walk down, to ensure all components are installed correctly.
• Installing jumpers (bearing bypass).
• Pipes air blowing
• Pipes connections re-tighten
• Removing of instrumentations devices and thermal valves
• Inspection of oil tanks and filters’ elements
• Function test to all (pumps, oil heaters )
• Installing temporary mesh on the return line
• Using External skids (selecting material and fabrication on site) referring to GE recommendations.
• Continue flushing until reaches the acceptance criteria

Mechanical Commissioning Engineer في EGYPTROL S.A.E
  • مصر - الإسماعيلية‎
  • فبراير 2015 إلى مارس 2015

Commissioning of Boiler Feed Water Pumps
• Following UP the replacement of the old BFWP
• Alignment of the pumps
• Pumps Oil flushing
• Pumps Function test
• Pump’s motor solo run test
• Adjustment of oil flow for each bearing
• Adjustment of pump’s mechanical seal cooling water flow
• Pumps heat run test
• Pumps performance test

Mechanical Commissioning /operation Engineer في Samsung C & T
  • المملكة العربية السعودية - الشرقية
  • يونيو 2013 إلى نوفمبر 2014

• Commissioning of Water treatment. Reverse osmosis plant with capacity (3*95 cubic meter/hr demine water and 3*241 cubic meter /hr service water)
• Commissioning of Chlorination plant (4 electro cells to produce 90 cubic meter/hr of sodium hypochlorite Na O CL with concentration 2000 PPM.
• Commissioning of Waste Water Treatment.
• Preparing commission procedures and all Documents required for tests and turnover to The Owner.
• Water treatment plant (desalination RO)

This system consists of DAF system, MMF (multimedia filters), CF (Cartridge filters), SWRO, BWRO and dosing system
• Pump’s motor solo run test
• System pipes flushing
• Adjustment of dosing pumps referring to process
• Adjustment of DAF system (dosing skids & air units)
• SDI test for Multimedia filters
• Function test for all system components
• Installation of RO membranes
• Operation and monitor of RO production water quality
• Performance test
• loading Chemicals to tanks
• Applied necessary modification to system

• water treatment plant ( demine water )

This system consist of Mixed bed, regeneration skids
• system pipes flushing
• mixed bed vessels inspection before loading resin
• pump’s motor solo run test
• pumps heat run test
• loading chemicals
• loading resin
• calibration of all instrumentation devices
• function test
• operation and monitor of mixed bed water production quality
• applied modification to the system
• performance test


• waste water treatment

This system consist of process water drain PH adjustment system, oil separation system, sewage water treatment. The main issues for these systems as following.
 Pumps solo run test
 Heat run test for all pumps
 System pipes flushing
 Pumps and valves function test
 Adjust timers for sewage system
 Function test
 Performance test


• Electro chlorination system

This system consist of four electro cells, storage tanks, dosing pumps, makeup pumps. The main issues as following
 Pump’s motor solo run test
 Pumps heat run test
 System pipes flushing
 Function test
 Performance test

Mechanical Maintenance Engineer. في Middle Delta Electricity Production Company (MDEPC)
  • مصر
  • مايو 2009 إلى يونيو 2013

Heat recovery steam generator Maintenance Engineer.
The main issues.
• Maintaining pumps to work at high efficiency.
• Fixing all leakage in valves or pipes.
• Metering safety valves.
• Following up manufacture's maintenance schedule.
• Internal inspection of pipes and measure tube thickness.
• Fixing any leakage founded in HRSG tubes.
• Making all necessary cleaning "mechanical or chemical” for tubes.
• Internal inspection of tube fins.
• Checking status of truss, anti vibration, seals, stacks dumper and expansion joints (preventive maintenance).
Water treatment Mechanical Maintenance Engineer.
. The main issues.
• Maintaining each equipment in each system to work properly.
• Fixing all leakage or damage in any equipment like (pumps, valves, air blowers, …etc)
• Making maintenance program for each equipment referring to manufacturer's manuals.

Mechanical Construction & Commissioning Engineer في Middle Delta Electericity Production Company
  • مصر
  • أبريل 2008 إلى مايو 2009

I worked on the following system as installation and commissioning engineer
GE Gas turbine Frame 9FA. Combined cycle power plant 2250 MW
The main issues during construction.
• Receiving all turbine parts and made inspection of it.
• Installing of turbine systems like lube oil system, fuel system, inlet air system, compressor washing system, generator fixation, turbine fixation, exhaust system, fuel oil system .
• Alignment generator to turbine.
• Hydro-test of all erected system pipes referred to ASME code.

The main issues during commission.

• P& ID checks
• Recorded all missing parts and defects under punish list documents.
• Oil flushing of the lube oil system.
• Flushing of the fuel and liquid fuel systems.
• Function test of all equipments.
• Start up of turbine
• Performance test.
• Post -commissioning tasks.

Mechanical commissioning & operation engineer في Middle Delta Electricity Production Company
  • مصر
  • مايو 2006 إلى أبريل 2008

Commissioning of 2 steam turbine.
• Lube oil flushing
• Control oil flushing
• Air blows
• Actuator testing
• Lift oil setting
• Pre start checks
• Generator hydrogen sealing
• Synchronization up to base load.
• Performance test

الخلفية التعليمية

ماجستير, Mechanical Engineering
  • في Alexandria University
  • نوفمبر 2012

Heat Recovery Steam Generator (HRSG) • Studying the factors effect on the HRSG efficiency • Performing thermal design of HRSG. • Developing computer software program to design HRSG. • Case study on Nub aria power station module 3

بكالوريوس, Mechanical Engineering
  • في Alexandria University
  • يونيو 2005

Specialties & Skills

mechanical engineering commissioning
Mechanical Maintenance
AutoCAD
MS office
auto CAD

اللغات

العربية
اللغة الأم
الانجليزية
متمرّس

التدريب و الشهادات

Operation of HRSG (تدريب)
معهد التدريب:
ALSTOM company
تاريخ الدورة:
September 2006
Steam turbine Maintenance course (تدريب)
معهد التدريب:
ALSTOM company .in Germany –Mannheim
تاريخ الدورة:
November 2009
المدة:
250 ساعة