Project Engineer
INTECH PROCESS AUTOMATION
Total years of experience :13 years, 3 Months
System Components:
HIMA Hi Quad
Responsibilities:
As Lead, responsible for Project Scheduling, Planning, Budgeting, Resource Planning and
allocation. Performed all the Project Coordination with Client. Executed In-house simulation
of HIMA Cause & Effect charts and generated Deliverables.
Extension of HMI Node/ Migration from Factory Talk ME to SE
OMV- Tunisia (Nov2013 - May2014)
System Components:
RSLogix 5000, Factory Talk Studio SE/ ME
as a
ICSS-Upgrade OML 100
TOTAL, Nigeria (Ongoing)
System Components:
PCS: ABB Bailey Infi 90, Yokogawa Centum VP R5.03
SSS/FGS : Tricon, Tridant
Responsibilities:
As Reverse Engineering Lead, executed Functional Analysis for offshore platforms.
Generated Shutdown Logic Diagrams and Process Flow Diagrams. Performed Process Control
loops, Safety Control Loops and Fire and Gas Loops reverse Engineering and control
narratives generation from Bailey Infi 90. Also Prepared Transfer Concept and Safety Concept
of the project. As part of the Engineering team, generated P&ID Markups, P&ID Updates,
Instrument List, IO list, Alarm and Trip List, Marshaling Drawing and Loop Drawings.
Currently looking after Hot Changeover/ Cutover Procedures.
Also performed as officiating Electrical Lead. Prepared 220 Distribution Boards, Performed
Cable Scheduling and breaker Sizing. Provided Platform ICSS Earthing Specifications and
Instrument Earthing Specification.
C& E Verification F&G System at Greater Plutonio FPSO
) 1st Division (79%). (