operator
شركة الفرات للنفط - شركة زادكو للنفط
Total years of experience :22 years, 4 Months
various oil - gas gathering stations involoed with well heah, well testing, chimical injection, multi stage separation, vapour recover unit, prepair wells for work over or maintenance or repair and I operated shipping pumpes and helped in trouble shooting on separators, tanks And pumps .
TanaK C.P.F it consist of :
1-oil treatement
2- water injection system
3 - gas dehydration and compression
4 - dilution water system
I worked in all areas from inlet manifold changing wells on test and recording parameters two phase separation, three phase separation including free water knock out vessels and heater treater and degassing boot tank sample for analizing and take corrective action in case of bad separation tanks fixed roof and floating roof taking depth for crude oil and interface and calculating ullage, carried out fir system check on vary types of tanks carried out . Skimming of tanks when required .
1.worked in water treatment plant and changed over media filters, also replenished .
2. chemical and checked injection rate.
3. Worked in gas plant on Waukesh reciprocating 4.comporessors and glycol deheydration system. 5.Worked on pigging system of gas and oil lines .
courses: from Mechanical institute