Assistant Research
Qatar Foundation
Total years of experience :13 years, 11 Months
-Project management, supervision, field scheduling, offshore and onshore field sampling and leading communications as well as approvals from Ministry of Municipality and Environment.
-Collecting Ground water and Sea Water Samples, lab based measurements, statistical analysis of the data, data managements, dose & risk assessment, Primary data evaluation and data reporting.
-Participating in a task-force engineering team in collaboration with Ashghal and Ministry of Municipality and Environment to design a novel technology to harvest heat energy gained from roads/pavement to cool-down the roads, reduce maintenance, increasing asphalt lifetime as well as utilising the harvested heat in power and water production through a sustainable and close cycle.
-Construction and installation phase of hybrid PV-Thermal collectors with testing and commissioning.
Projects: Adel Hassoon Villa project (1450 m2) with 1.2 million JD
Skelton+ finishing works.
Tareq Ajaj Building (1400 m2) with 950000 JD
Skelton+finishing works.
SAUDI OGER LTD, Taif KSA
Saudi Oger is a leading construction, facilities management and infrastructure development companies in KSA and the region. http://www.saudioger.com
Site Civil Engineer, Dec 2010 to 2014 (construction manager from Dec 2014 to 2015 and Site Project Manager (SPM) from 2015 up to date)
Projects: King Abdullah Bin Abdulaziz Project phase 1(KAP 01) (15 PROJECT with 100 Million US) in the Taif region and (14 Projects with 150 Million US)in AL-Baha region Client: Ministry of the Interior.
• Report to the Project Manager and supervise work at all twenty nine sites ensuring adherence to schedules, budgets, quality and safety requirements.
• Coordinate design and preparation of shop drawings and bills of quantities (BOQ), quantity surveys and follow up for approval of client/consultant.
• Supervise and coordinate with subcontractors assuring compliance with all project schedules and specifications.
القيام بتظليل منحدرات الصعود لمحطات القطار لحجاج بيت الله الحرام بالمشاعر المقدسة
BAKER INSTITUTION DESIGN CONSULTANT, Amman Jordan
Design Engineer, Mar 2010 to Jul 2010
• Managed design, preparation of drawings & BOQs and quantity surveying for estimation for different projects.
• Delivered all jobs on time meeting quality requirements.
SAUDI OGER LTD, Amman Jordan
Site Engineer, Sep 2009 to Nov 2009
Project: Abdali Boulevard, Amman Jordan: a 370 m pedestrian strip flanked by 12 buildings of an average nine floors each, hosting 130+ retail outlets, 400 five-star serviced apartments, state-of-the-
art office space, roof top restaurants, fitness clubs, pools and terraces.
• Reported to the Project Manager and led a small team of engineers and completed assigned
tasks covering site supervision & management, shop drawings review and quantity surveying within deadlines.
civil engineering working on design ,construction ,management,etc