الخبرة العملية

مجموع سنوات الخبرة :13 years, 0 أشهر

construction manager في NESMA ELECTRIC
  • المملكة العربية السعودية - جدة
  • أشغل هذه الوظيفة منذ نوفمبر 2013

• Ensures site -engineering support to all concern departments including day-to-day support to the designing department in resolving site problems.
• Work in tandem with project director and perform project management duties to support the completion of projects.
• Participates during all phases of the project management process. Under the guidance of the project director.
• Schedule and conduct project meetings, communicate assignments and expectations to project team members and track completion of project.
• Deliverables to ensure quality and integrity of all project-related products.
• Perform all administrative tasks, communicate project information to stakeholders, design templates, create presentations, review and edit project deliverables and maintain the project information repository.
• Help resolve project conflicts, identify resource requirements and align the project team on project scope.
• Observe existing project management practices and propose improvements for process efficiency.
• Ensure that projects are effectively planned and well organized.
• Manage tasks effectively and complete projects as expected.
• Organize resources, work under tight deadlines, and manage simultaneously occurring tasks and shifting priorities.
• Control project change and generate maximum team performance.
• Acts as a facilitator in specific project areas when appropriate.
• Supervise the contractor’s work to get sure of the alignment with the approved SOW.
• Work with other engineers in the department in conducting the site studies on site performance, problems and provides modification package and cost estimates.

• Prepares engineering/design packages for site modifications in his discipline area.
• Work with Drafting and Documentation during the preparation of packages.
• Coordinates design review to ensure compliance with work scope and issues the final package to the clients.
• Support the correct implementation of the site modifications as per the design packages in accordance with national and international standards as per safety procedures of the company.
• Provides clarification, guidance and technical supports during execution.
• Develops the electrical components of the tender package, including the deliverables.
• Participates in pre-tender meetings, answering questions, taking notes for follow up.
• Coordinates with the Project Cost Control Engineer the responses to questions -written and verbal.
• Participates in project planning, providing assistance to the contractors/vendors in interpreting agreed project plans and contracts, and providing electrical drawings and schematics.
• Participates in pre-project meetings with contractors and vendors, providing technical assistance as required.
• Carries out an ongoing review of "live" projects including equipment delivery to ensure that all engineering and safety standards met and makes recommendations for changes to meet these standards.
• Oversees the implementation and completion phases of all projects.
• Ensures that all operability/acceptance tests carried out before approval given for project handover.
• Coordinates activities concerned with technical developments, scheduling and resolving engineering design and test problems.
• Evaluates and approves design changes, specifications and drawings.
• Carries out an ongoing review and testing regime during the warranty period and follows up with suppliers/contractors to effect adjustments prior to final acceptance.

• Ensure proper "as-built" documentation of the project delivered to the document control unit.
• Prepares project completion reports.
• Oversees and coordinates technology vendor reviews and procedures.
• Support in daily/monthly/yearly reports and budget preparation.

Testing &Commissioning engineer في ThyssenKrupp Xervon
  • المملكة العربية السعودية - الرياض
  • يونيو 2011 إلى أكتوبر 2013

• Scheme function check for ACDB & DCDB &common control panel for alarms.
• 13.8KV SWG&132KV GIS Primary Injection Test.
• 13.8 KV SWG BUSBAR Stability & Sensitivity Test.
• 110 KV and 132 KV GIS BUSBAR Stability & Sensitivity Test.
• Testing VT Fuse Supervisory Relay, which detects single, two or three- phase fuse failures in less than 8ms.
• Testing under voltage Relay.
• Testing DC Supervision Relay.
• Testing Trip circuit Supervision Relay.
• Testing Aux. Delay Relay.
• Testing AC/DC Aux. Contactor.
• Testing Auxiliary Timer.
• Testing the Current &Voltage & MW& MVAR Transducer and checking the O/P current (mA).
• Testing MCCB and measure the Trip Time (L, S, I, G) according to their curves.
• CT Analyzer and checking all criteria for CT.
• CT secondary injection &CT Burden &CT Loop Resistance Test.
• VT Ratio Test & VT polarity Test.
• Checking the VT (Primary and Secondary) Resistance
• Timing Test for circuit breaker CB :
(Open & Close &Close Open and Open Close Open time).
• Capacitor Bank Test by measuring the value of :
Insulation (GΩ) &Capacitance (µF) & Resistance (MΩ) &Inductance (mH).
• Ammeter &Voltmeter & Multi meter testing for current & volt & (Active-Reactive-Apparent) power Reading and calculate the error percentage.
• Measuring the Contact Resistance for BUS BAR &Grounding Switch and Circuit Breaker CB.
• Insulation Resistance Test for Circuit Breaker by applying 5KV and checking the Insulation value.
• Insulation Resistance Test for CT&VT and checking the Insulation value between
(Primary-Earth)& (Primary-Secondary) & (Secondary-Secondary).
• Insulation Resistance Test for IPCT (Interposing CT).
• Testing MCB (Miniature Circuit Breaker) by applying double of rated current (2xI in) and checking the tripping time according to MCB type.
• Testing the DEW Point and Purity for SF6 gas for each compartment at GIS.
• Testing the leakage for SF6 gas for each compartment at GIS.
• Testing the Pressure Gauge at high density and low stage1&low stage2 and checking alarm and contact resistance.
• Checking the interface between LCC and SCADA.
• Checking the interface between Switchgear and SCADA

الخلفية التعليمية

بكالوريوس, electrical engineering
  • في AinShams University - Faculty of Engineering
  • يونيو 2007

Specialties & Skills

Infrastructure Projects
Power Distribution
Electrical Engineering
General Construction
Test Engineering
• Knowledge of relevant standard, code and rules regulation. Updating with latest development
• Good communication skills
• Time-efficient
• Manage simultaneously occurring tasks and shifting priorities
• Good project management planning skills

اللغات

العربية
اللغة الأم
الانجليزية
متمرّس

العضويات

saudi council of engineering
  • electrical engineer
  • January 2011

التدريب و الشهادات

PLC (الشهادة)
تاريخ الدورة:
July 2008
صالحة لغاية:
January 9999
ICDL (الشهادة)
تاريخ الدورة:
October 2008
صالحة لغاية:
January 9999

الهوايات

  • Reading,Travelling