Mechanical Engineer
Air Liquide
Total years of experience :10 years, 0 Months
Carry out maintenance (preventive, planning, subassembly rebuilding) in accordance with AL procedures in order to ensure equipment availability for production and minimize the interruption of equipment running ability.
- Prepare & follow required preventive maintenance plan for plant equipment through company CMMS (maximo).
- Upgrade company CMMS database including Job plans creation, PM plans, assets locations SR management.& WO follow up.
- Support in preparing spare parts lists & workshop required tools.
- Support in plant operation through following up the Production process, KPIs. (Key Performance Indicators) and plant parameters in case of any assigned shifts.
Career highlights:
maximo usage enhancement project - Project manager:
Update hub asset tree & collect missing asset data, identify critical assets for 3 plants
Update maintenance plan according to OEM & AL recommendations.
Create detailed job plan for each PM including labors, materials & consumable requirements.
Project period - 9 months.
APSA plant maximo deployment project - Project manager:
Collect plant assets data & create asset tree.
Create maintenance plan for the plant equipment according to OEM & AL recommendations.
Create detailed job plan
Project period - 3 months
maximo - oracle integration project - Lead tester & hub technical support engineer:
Integration between procurement system (oracle) & company CMMS system (maximo) in order to control and analyze maintenance costs, spare parts management, maintenance reporting, procurement cycle enhancement.
Project period - 1 year.
ALX site backup upgrade project - project planner/mechanical engineer:
Upgrade the plant backup Oxygen capacity by 35%, including material selection, upgrade, sub contractor supervision & commissioning.
Project period -8 months.
Currently working as operation & maintenance engineer in air separation unit, with a discharge capacity of 112000Nm3/hr in producing Oxygen, Nitrogen & Argon.
Responsibility: Preventive maintenance, vibration trending, shut down maintenance, installation & alignment of plant equipment, maintain production during the shift.
B.Sc. of Mechanical Engineering 2012. Alexandria University, Faculty of Engineering. GPA: 2.83 / 4.00 (70.67 % - Good) Graduation project:Increasing the productivity of ELNG (Egyptian Liquified Natural Gas) by 120%, project included design, sizing, selection, performance analysis, performance monitoring & de-bottlenecking (Turbo machinery part) Supervisor: Dr. Hassan Warda • Grade: Excellent.