مهندس تنفيذ
الجمعية التعاونية للانشاء والتعمير
Total years of experience :2 years, 2 Months
الاشراف على تنفيذ اعمال التركيبات الكهربية الخاصة بالمباني والمنشآت المختلفة
العمل في المجالات الآتية :
1-Control panels for three phases Induction Motor
2-Medium and low voltage distribution panels and its electrical
Component
3-Steam Boilers (Fire Tube Boiler& Oil Burner).
4-three phase Transformers
Cooling Systems (Freezing by Ammonia and Freon (A404).
- (Reciprocating & screw compressor).
- (Air & Evaporative condensers).
• Cocking System
• Oil burner.
• Pumps (centrifugal gear).
• Electric control panels for pumps and compressors operation.
• PLC (step7-300) unit system.
Aswan University, Aswan, Egypt B.Sc. of Electrical Engineering- Power & Machines Section (2009) Electrical Machines Graduate Project Title: