مدير انتاج مسؤؤل عن جميع مفاصل العملية الانتاجية

project manager à protech energy
  • Syrie - Alep
  • juin 2008 à avril 2010

Execution : Non -production building at LAFARGE Cement Plant

1- Various civil works activates as ( landscape, infrastructure, soil replacement, roads

(internal, external), squares, structure, skeleton, architecture, fit out, Boundary fence,

guard tower, water tanks, plus MEP (mechanical, electrical, plumbing)

2- Scope of contracts was turnkey& E.P.C projects.

Project Manager à BEMCO STEEL INDUSTRIES Co.LTD
  • Arabie Saoudite - Riyad
  • novembre 2007 à mai 2008

10-2007 Up to 05-2008 : As Project Manager
For KSA Project: PP9
Execution : Erection & Installation Pipeing at Power Plant (PP9) at Riyadh
CLIENT : SC
Main Contractor : Arabian Bemco
Subcontractor :
BEMCO STEEL INDUSTRIES Co.LTD

Project Manager à TGCTP Terrassement, Génie Civil et Travaux Pétroliers
  • Algérie - Oran
  • janvier 2006 à novembre 2007

TGCTP Terrassement, Génie Civil et Travaux Pétroliers
1-2007 Up to 10-2007 : As Project Manager
For Algerian Project: MADGAZ 4
Execution - Constructions & Installation Pipelines 48"Ø longer 91Km & B.V.S ( Qty. 8 )
CLIENT : Sonatrach
Main Contractor : KANAGHAZ
Subcontractor :
TGCTP
Terrassement, Génie Civil et Travaux Pétroliers
DUTIE
 Provide technical leadership to the pipeline engineering team
 Provide technical authority for the pipeline Erection and procurement deliverables (reports,
drawings, material take offs, bid documents, bid evaluations, vendor documents
and similar)
 Support the pipeline package engineers
 Ensure schedule and budget targets are met
 Assist in the specification of materials and equipment and evaluation of bids.
 Preparation of cost estimates and schedules.
 Interface with field personnel to ensure Erection of pipeline. Route and workspaces
is adequate.
 Preparation of Construction Bid Packages and evaluation of bids.
 Interface with Client representatives during construction.
 Work within a project team environment to produce practical and economical cont.
TGCTP Terrassement, Génie Civil et Travaux Pétroliers
1-2006 Up 12-2006 : As Deputy Project Manager
For Algerian Project:
TRANSFER DE BENI HAROUN - WILAYA DE MILA
Execution - Constructions & Installation Pipelines 1600Ø mm longer 3Km &
2600Ø X 2 mm longer 1, 5 Km for Transfer Water from Pump Station at BENI HAROUN Dam
To OUED ATHMENIA Dam.
CLIENT : MINISTERE DES RESSORCES EN EAU AGENCE NATIONALE DES
BARRAGES (A.N.B)

Éducation

Baccalauréat, بكالوريوس هندسة ميكانيكية
  • à جامعة دمشق
  • juin 1995

ميكانيك عام

Specialties & Skills

Offshore Project Management
Project Management
Venture Creation

Langues

Anglais
Expert

Formation et Diplômes

PMP course (Formation)
Institut de formation:
horizon
Durée:
195 heures