project manager
شركة المتوسط للحديد
Total des années d'expérience :18 years, 3 Mois
مدير انتاج مسؤؤل عن جميع مفاصل العملية الانتاجية
Execution : Non -production building at LAFARGE Cement Plant
1- Various civil works activates as ( landscape, infrastructure, soil replacement, roads
(internal, external), squares, structure, skeleton, architecture, fit out, Boundary fence,
guard tower, water tanks, plus MEP (mechanical, electrical, plumbing)
2- Scope of contracts was turnkey& E.P.C projects.
10-2007 Up to 05-2008 : As Project Manager
For KSA Project: PP9
Execution : Erection & Installation Pipeing at Power Plant (PP9) at Riyadh
CLIENT : SC
Main Contractor : Arabian Bemco
Subcontractor :
BEMCO STEEL INDUSTRIES Co.LTD
TGCTP Terrassement, Génie Civil et Travaux Pétroliers
1-2007 Up to 10-2007 : As Project Manager
For Algerian Project: MADGAZ 4
Execution - Constructions & Installation Pipelines 48"Ø longer 91Km & B.V.S ( Qty. 8 )
CLIENT : Sonatrach
Main Contractor : KANAGHAZ
Subcontractor :
TGCTP
Terrassement, Génie Civil et Travaux Pétroliers
DUTIE
Provide technical leadership to the pipeline engineering team
Provide technical authority for the pipeline Erection and procurement deliverables (reports,
drawings, material take offs, bid documents, bid evaluations, vendor documents
and similar)
Support the pipeline package engineers
Ensure schedule and budget targets are met
Assist in the specification of materials and equipment and evaluation of bids.
Preparation of cost estimates and schedules.
Interface with field personnel to ensure Erection of pipeline. Route and workspaces
is adequate.
Preparation of Construction Bid Packages and evaluation of bids.
Interface with Client representatives during construction.
Work within a project team environment to produce practical and economical cont.
TGCTP Terrassement, Génie Civil et Travaux Pétroliers
1-2006 Up 12-2006 : As Deputy Project Manager
For Algerian Project:
TRANSFER DE BENI HAROUN - WILAYA DE MILA
Execution - Constructions & Installation Pipelines 1600Ø mm longer 3Km &
2600Ø X 2 mm longer 1, 5 Km for Transfer Water from Pump Station at BENI HAROUN Dam
To OUED ATHMENIA Dam.
CLIENT : MINISTERE DES RESSORCES EN EAU AGENCE NATIONALE DES
BARRAGES (A.N.B)
ميكانيك عام