Technical coordinator
Saipem LTD./ Snamprogetti SA
مجموع سنوات الخبرة :27 years, 0 أشهر
IInstallation of Gas Plant
Project : Kurais Central Processing Facilities (KCC)
Position : Technical coordinator
Machinary Dept.
(installation of Pumps, Generators, compressors, Over Head Cranes, )
• preparation of project plan, execution approach, and other related activities.
• Coordinate work activities between subcontractors, suppliers and other parties as directed
• Supervise the specific site works in accordance with the project terms and obligations
• Provide all necessary information to ensure that the specific work is execute in accordance with drawings and specifications
• Coordinate with suction head and other site engineers to resolve site execution problems
• Suggest mech. Design ideas for any required mech. Modification during work progress.
• Assure that the environment, health & safety procedures and rules are respected
I carried out (design, executing ) of Saudi Aramco Projects such as equipment related to industrial pumps, which are used in the field of petroleum industry
- Installation & design pumping stations ( End-suction, In-line, split case, deep well, turbine centrifugal pumps and positive displacement pumps/ with the control system)
Including all related instruments and piping circuit
- Installation of level control system
- Maintenance for all kind of pumps
Installation of industrial equipment
installation of food plant
power plant
Position: project engineer
I was responsible for:
• Installation of steel structure, boilers, pumps