Land Surveyor
NESPAK
مجموع سنوات الخبرة :15 years, 5 أشهر
Projects in Pakistan:
1- Thal Canal Project(PIAIP)
2- Warsak Canal Project Peshawar
3- Karachi Neuclear Power Plant(KANUPP)
4- Gadani Power Project Hubb Choki Baluchistan
Projects in KSA
1- Cross Section Survey of Nullahs in these cities
(Al Makhwa, Al Qilwah, Al Baha, Biljurshi)
Projects in Pakistan
1- Thal Canal Project
2- Warsak Canal Project
3- Karachi Neuclear Power Project(KANUPP)
4- Gaddani power project Hubb Baluchistan
Projects in KSA
1- Cross sections & Topographic Survey Of Nullahs In These Cities
Al Qilwah, Al Makhwa, Al Baha, Biljurshi
Projects in Pakistan:
1- Thal Canal Project (PIAIP)
2- Warsak Canal Project
3- Karachi Nuclear Power Project (KANUPP)
4- Gaddani Power Project Hubb Balochistan
5- Multan to Muzaffar Garh ByPass (N-70) Project
6- River Chenab Bridge At Head Muhammad Wala
Projects in Saudi Arabia
1- Cross Sections Survey Of Nullah in These Cities
(Al Makhwa, Al Baha, Al Qilwah, Biljurshi)
Current Employer: National Engineering Services Pakistan (Pvt.) Ltd.
(From Oct 23, 2012 To Date)
Title of Position: Surveyor
Project: Pakistan Irrigation Improvement Programme (PIAIP)
1. Worked as Junior Survey Specialist with Dasu Hydropower Consultant at Dasu Dam (Kohistan) KPK from April 2012 to Till Date.
Project: Warsak Canal System Peshawar.
Tenure: 10 June 2013-25 July 2013.
Client: Irrigation And Power Department, Government of KPK, Pakistan
Main project features: The scope of the project was to carry out the Cross Section survey of existing Culverts and Nullah Upstream and Downstream of Warsak Canal.
Activities Performed: ❖ Establishment of Ground Control Points
❖ Cross-sectional Topographic Survey
❖ Bed Profiling of river for Barrage
❖ Mapping of All Cross-sections based on Survey Data
❖ Preparation of Drawings in AutoCAD.
Tenure: 11 December 2012 - May 30, 2013.
Client: Irrigation And Power Department, Government of Punjab, Pakistan (Funded By Asian Development Bank)
Main project features: The purpose of the project is to improve the irrigation system by remodeling of Greater Thal canal branch system. The scope of work includes the cross-sectional topographic survey for all Upper And Lower Thal Canal Branch System, also it includes the survey for all Inventories. It also includes all this information in GIS Database.GIS work includes the preparation of maps showing the cross-sections and all inventories.
Activities Performed: ❖ Establishment of Ground Control Points
❖ Cross-sectional Topographic Survey
❖ Bed Profiling for All Canal System
❖ Mapping of All Canal System based on Survey Data
❖ Preparation of Drawings in AutoCAD.
❖ Preparation Of Longitudinal Profile
❖ Preparation Of Cross Sectional Profiles using Eagle Point.
Employer: National Engineering Services Pakistan (Pvt.) Ltd.
2. Worked as Land Surveyor with Geo Matics Pvt (Ltd) at Iran to Pakistan Gas Pipe Line Project from November 2011 to February 2012.
3. Worked as Site Supervisor with MAZCON Pvt (Ltd) in Construction of Fazal Cloth Mills Unit#3 Multan from January 2011 to November 2011.
4. Worked as Sub-Engineer with Ghulam Rasool &Company (GRC) Pvt (Ltd) at Chenab Bridge (Head Muhammad Wala Muzaffar Garh) from January 2010 to December 2010.
5. Worked as Sub-Engineer with Husnain Cotex Pvt (Ltd) at N 70 Project (Multan to Muzaffar Garh Bypass) from June 2009 to January 2010.