طاهر م. Tufail, Manager Procurement

طاهر م. Tufail

Manager Procurement

Descon Integrated Projects (Pvt) Ltd. (Formerly: JGC-Descon Engg. (Pvt) Ltd.

البلد
باكستان
التعليم
بكالوريوس, B.Sc Engg. (Mechanical)
الخبرات
27 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :27 years, 9 أشهر

Manager Procurement في Descon Integrated Projects (Pvt) Ltd. (Formerly: JGC-Descon Engg. (Pvt) Ltd.
  • باكستان
  • يناير 2007 إلى سبتمبر 2016

• To ensure planning, monitoring and controlling execution of all procurement activities including purchasing, expediting and traffic.
• Responsible for Sourcing, Import & Local Procurement of Equipments, Packages, Piping / Electrical / Instrumentation related Materials etc for different Projects.
• To recommend corrective actions for problems arising during execution of any of the activity related to procurement.
• To ensure that complete procurement cycle is on schedule and budget consumption is optimized.

Additional responsibility includes:
• • Support Proposal Managers for preparing EPC proposal by leading Procurement part of EPC Proposals. The major clients are in UAE (GASCO, ADCO, Takreer) & Qatar Petroleum. The worth of EPC proposals vary from USD 20 million to USD 300 million.

Projects Executed:

Descon Oxy-Chem Ltd, Sheikhupura - Pakistan (Chemical Plant which produces Hydrogen per oxide)
Project Value US$ 30 Million approx
Major Equipments: Compressors, Pumps, Pipe & Fittings, Valves, Cooling Towers, Vessels, Columns, Tanks, Switchgear, Transformers, UPS, Power Cables, Field Instruments, DCS, Buildings etc.

Nimir Chemicals Pakistan Ltd. (formerly Hoechst Ravi Chemicals Ltd)
(Petrochemical Plant in Sheikhupura, Pakistan which produces DOP (Dioctyle Phthlate), PA (Phthalic Anhydride) & MA (Maleic Anhydride)
Project value US$ 40 Million approx
Major Equipments: Gas Turbine, Compressors, Pumps, Pipe & Fittings, Valves, Demin Water Plant, Cooling Towers, Tanks, Vessels, Heat Exchangers, Switchgear, Transformers, UPS, Power Cables, Field Instruments, DCS, Buildings etc.

Nimir Industrial Chemicals Ltd. Sheikhupura - Pakistan (Chemical plant which produces Caustic Soda)
Project Value US$ 15 Million approx
Major Equipments: Membrane package, Chlorination plant, Pumps, GRP Pipe & Fittings, Valves, Cooling Towers, Vessels, Columns, Switchgear, Transformers, UPS, Power Cables, Field Instruments, DCS, Buildings etc.

About 45 EPC Projects under Bid executed. Some are listed below:

1. ADCO, UAE - Tie In Job
Main Equipment: Flowlines, GRE Pipes, Wellhead Control Panels, Valves, Cathodic Protection, Solar Panels, Surface Safety Valves, RTUs
Project Value US$ 190 Million approx.

2. Qatar Petroleum, Qatar -RasLaffan Wet Utilities Distribution Network Project, Qatar
Major Equipments, Pumps, HDPE Pipe & Fittings, HVAC, GRP Pipe & Fittings, Ductile Iron Pipe & Fittings, Fire detection & Alarm system, Valves, LV & MV Switchgears, Transformers, UPS, LV / MV Cables, Control Valves, Scada, Telecommunication system, Instrument cable, Field Instruments, Electrical Bulk, Piping Bulk, Micro Tunneling
Project value US$ 160 Million approx

3. TransAsia Refinery Ltd. Karachi - Pakistan (100, 000 Barrel per day)
Project value US$ 250 Million approx

4. National Refinery Ltd. Karachi - Pakistan
Project Value US$ 300 Million approx

5. ADCO, UAE - ASAB Unit 6 & 7
Major Equipments: Surface water injection pumps, Chemical injection package, Wellhead control panels, SSV, Pipe & Fittings, Valves, Power skids, Electrical bulk.
Project value US$ 60 Million approx

6. 150 MW TriconBoston Wind Farm Power Project
Project Value: USD 160 Million approx.

7. GASCO, UAE - Habshan Flare Acid Gas Recovery Project, Project Value US$ 45 Million approx.

8. ADCO, UAE - Batch 1 Plant modification at Buhasa Project value US$ 50 Million approx

9. ADCO, UAE - Water Injection Flow Lines and Well Head Installation of Typical Works
Project value US$ 70 Million approx

10. Eithad Power Company - Pakistan, 2x37 MW Eithad Power Plant
Project Value: US$ 100 Million approx

11. KPK - Pakistan, 40.8 MW Koto Hydel Power Plant
Project Value: US$ 160 Million approx

12. 2x55 MW Coal Fired Power Plant, M3, Faisalabad
Project Value: USD 160 Million approx.

13. 2x55 MW Coal Fired Power Plant, Sunder, Lahore,
Project Value: USD 140 Million approx.

Senior Manager Materials في Nimir Chemicals Pakistan Ltd
  • باكستان
  • يناير 2000 إلى ديسمبر 2006

- Responsible For IMPORT & LOCAL Procurement of Raw Materials, Equipments, Engineering Items etc which are required for Plant.
- Responsible for planning of raw materials to be imported for Plant.
- Responsible for maintaining Inventory Levels of raw materials at Plant.
- To ensure timely availability of materials at Plant at competitive prices.

Assistant Manager Materials في Hoechst Ravi Chemicals Ltd.
  • باكستان
  • مايو 1995 إلى ديسمبر 1999

- Responsible for Procurement of Chemicals,
Engg. Items, Lab items, consumable items
etc.
- Responsible for Import of raw materials,
Machinery and Engg. Spares.
- Responsible for planning of raw materials
and packing materials which are required
for Production to meet sales targets.
- Responsible for maintaining inventory
levels in stores.
- Responsible to ensure cost effective and
Timely availability of materials.

Procurement Engineer في Pak Elektron Ltd, (PEL)
  • باكستان - لاهور
  • يناير 1994 إلى مايو 1995

- Responsible for purchasing of all direct / Indirect materials, items which are required for production of Transformers, Switch
Gears, Energy meters & Electric Motors.
- Material planning of Energy meter as per Requirement of Marketing Department.
- To develop the Vendors as per quality Standard of the Company.
- Search the new Vendors and assess their Ability for the jobs which can be awarded after visiting / inspecting their premises.

Procurement Engineer في Descon Engg (Pvt) Ltd
  • باكستان
  • سبتمبر 1992 إلى يناير 1994

- Responsible for procurement of Pumps, Fasteners, Referactory material, Insulating Material, Pipe fittings and the jobs relating to
Casting & Forging.
- Analytical analysis of different quotations from different suppliers.
- Finalize the order at a good rate and required Quality as per indent requirement.
- Follow up to expedite the order within the Delivery schedule.

Planning Engineer في Descon Manufacturing (Pvt) Ltd.
  • باكستان
  • يناير 1990 إلى أغسطس 1992

- To prepare Master Plan for Production as per Requirement of Marketing department.
- Scheduling and loading of different shops.
- Progress monitoring of different Shops according to work orders released for Specific time period.
- Planning of direct and indirect materials to meet the Production targets.
- To control the Inventory levels of different Materials, items and Finished Products.

Management Trainee في Descon Manufacturing (Pvt) Ltd
  • باكستان
  • يناير 1989 إلى يناير 1990

- Training in Production Planning & Control
Department as well as in Quality Control
Department.

الخلفية التعليمية

بكالوريوس, B.Sc Engg. (Mechanical)
  • في University of Engineering & Technology, Lahore
  • ديسمبر 1988

Specialties & Skills

Materials
Procurement
MS Office, Internet

اللغات

الانجليزية
متمرّس

العضويات

Pakistan Enginnering Council
  • MECH / 6678
  • December 1988

التدريب و الشهادات

Finance For Non-Finance Managers (تدريب)
معهد التدريب:
Pakistan Society for Training & Development
تاريخ الدورة:
May 2016
المدة:
18 ساعة
work shop on “Managing Conflicts” (تدريب)
معهد التدريب:
Training Impact, Lahore - Pakistan
تاريخ الدورة:
June 2015
المدة:
9 ساعات
(الشهادة)
تاريخ الدورة:
June 2014
(الشهادة)
تاريخ الدورة:
March 2013
YES (الشهادة)
تاريخ الدورة:
March 2013
صالحة لغاية:
March 2013
(الشهادة)
تاريخ الدورة:
June 2011
صالحة لغاية:
June 2011
(الشهادة)
تاريخ الدورة:
October 2008
صالحة لغاية:
October 2008
Communication Skill (الشهادة)
تاريخ الدورة:
July 2002
صالحة لغاية:
July 2002