Participated in kick-off meetings to understand and monitor the contractor's action plan and schedule for new activities.
• Participated in weekly meetings with contractors and SAPMT to engage in discussions regarding site issues and
• contribute valuable inputs and solutions.
• Reviewed Project Quality Documents such as P&ID, piping plan and isometric drawing ensuring alignment with
• applicable standards and requirements.
• Generated comprehensive inspection and surveillance reports for daily inspection activities, ensuring meticulous,
attention to detail and completeness.
• Monitored and verified corrective actions for project LBEs for “Lessons Learned” and “Best Practices”.
• Reviewed and approved of WPS for compliance with project requirements after CSD approval.
• Review results of Welder's Qualification Tests to issue JCCs (Job Control Cards) for qualified welders.
• Witnessed pre-welding, joint fit-up, in-process, and post-inspections based on Saudi Aramco Inspection standards.
• Participated in the selection of NDE (Non-Destructive Examination) methods and techniques.
• Reviewed and evaluated NDT requests and reports for accuracy and compliance.
• Performed material receiving inspections for plant piping and pipeline, ensuring compliance with specifications.
• Monitored material preservation activities to prevent damage or deterioration.
• Monitored project weld data and welder repair rates on a weekly basis, identifying trends and areas for improvement.
• Reviewed contractor’s method statements and procedures for alignment with project requirements and Aramco
standards.
• Monitored project execution to ensure activities are performed on schedule and expedited as needed.
• Participated in PMCC meetings, walkthroughs, and discussions to address “Yes” and “No” items.
• Initiated various Logbook Entries (LBE) and Non-conformance reporting for quality deficiency and suggested Agreed
Completion Date (ACD) based on the severity of the non-conformance.
• Guided Contractors to adhere to and follow Schedule “Q” (Quality Requirements) of the contract, Saudi Aramco Engineering
Standards, procedures, General Instructions (GI), Saudi Aramco Typical Inspection Plans (SATIP), Saudi Aramco
• Inspection Checklist (SAIC), and Saudi Aramco Test Report (SATR), etc. by issuing Focus Assessments and Proactive
Notifications in EPM and QMIS.
AL
Underground Utilities Project Saudi Aramco Daharan
Process Piping Works for Oil Gathering Stations / Centers and Gas Plants, Petro-Chemical Plants as per ASME B31.1, B31.3, construction Shut down and Maintenance Inspection. Worked for CS, LTCS, SS and Low Alloy Steel Piping Materials
•Onshore Pipelines and Flow lines for Transportation of Oil & Gas products as per API 1104, ASME B 31.4, B31.8 and Clients Specification.
•Preparation / Review / Approval of WPS, PQR, Welder Qualification Documents, Inspection and Test Plan, Method Statements, Work Instructions, and Quality Assurance / System documents, Technical Delivery Conditions for Welding Consumables / Raw Materials and Controlling of Documents.
•Repair Recommendations during shut down inspection, review/ preparing Repair Procedures and monitoring the same.
•Inspection of Raw Materials such as Plates, Pipes, Fittings and Flanges and Bought out items like Valves, Piping Hanger supports, Review of Raw Material Certificates
•Review of Radiographic Films of Welds (Plates & Pipes), DPT of welds and Destructive Testing
•Witnessing Hydrostatic Test / Pneumatic Test, Vacuum Box Testing, PWHT.
•Witnessing Welder Qualification and Welding Procedure Qualification for ferrous and nonferrous material.
•Conducting Quality Audit, Evaluation of Vendors, Raising NCR and resolving the same.
Witness of welder and welding procedure approval test.
•Ensure availability and approval of procedures by CSD.
•Ensure that the welders are qualified and have a valid JCC.
•Validate certificate of calibration (welding equipment & inspection instruments).
•Inspection of Consumables for Pipeline and Piping as per project specification and related code requirements and review of certificates (MTC).
•Inspection of welding activities of pipeline / piping such as Pre- Welding, In-Process Welding and Post Welding.
•To Prepare Daily Welding Report and Welding traceability.
•To ensure that all activities are inspected and carried out as per the requirements of construction specification, drawings and Quality plan